ML070960037 | 5 April 2007 | Dominion Gerald Bichof | Proposed Technical Specifications Change Re Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping | Request |
ML071170090 | 3 May 2007 | Siva Lingam NRC/NRR/ADRO/DORL/LPLII-1 | Request for Additional Information Regarding the Proposal to Revise Technical Specifications for Temporary 45-Day and 14-Day Allowed Outage Times (TAC Nos. MD46222 and MD4623) | RAI |
ML071550202 | 31 May 2007 | Dominion Gerald Bichof | Proposed Technical Specifications Change, Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping, Response to NRC RAI | Request |
ML071490231 | 31 May 2007 | Siva Lingam NRC/NRR/ADRO/DORL/LPLII-1 | Request for Additional Information Regarding the Proposal to Revise Technical Specification for Temporary 45-Day and 14-Day Allowed Outage Times to Replace Chilled Water Piping...(Tac Nos. MD4622 and MD4623) | RAI |
ML071760212 | 5 June 2007 | Siva Lingam NRC/NRR/ADRO/DORL/LPLII-1 | MCR &Esgr Chilled Water Piping Replacement | Other |
ML071840387 | 3 July 2007 | Siva Lingam NRC/NRR/ADRO/DORL/LPLII-1 | MCR and ESGR Chilled Water Piping Replacement (Risk Assessment RAI) | RAI |
ML071940128 | 12 July 2007 | Howe A NRC/NRR/ADES/DRA/PRALB | MCR and ESGR Chilled Water A/C System Piping Replacement | Other |
ML071930363 | 12 July 2007 | Siva Lingam NRC/NRR/ADRO/DORL/LPLII-1 | MCR and ESGR e-mail Surry RAI Response for La | RAI |
ML071970183 | 13 July 2007 | Dominion Gerald Bichof | Proposed Technical Specification Change, Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping Additional Information Backup Cooling.. | Other |
ML072060022 | 20 July 2007 | Dominion Gerald Bichof | Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping, Response to Request for Additional Information | Response to RAI |
ML072681171 | 25 September 2007 | Dominion Gerald Bichof | Proposed Technical Specifications Change Supplement Re Operable Definition Modification for Air Handling Units While in Temporary 45-Day Allowed Outage Times | Request |
ML073321271 | 28 November 2007 | Dominion Gerald Bichof | Proposed Additional Technical Specifications Change, Operable Definition Modification for Air Handling Units While in Temporary 45-day Allowed Outage Times to Perform Required Surveillances | Request |
ML080150544 | 14 January 2008 | Dominion Gerald Bichof | Revisions to Proposed Technical Specifications Changes, Temporary 45-day and 14-day Allowed Outage Times to Replace MCR and ESGR Air Conditioning System Chilled Water Piping and Operable Definition Modification to Perform. | Request |
ML080240120 | 23 January 2008 | NRC/NRR/ADRO/DORL/LPLII-1 | Tech Spec Pages for Amendments 258 and 257 Regarding Replacement of Main Control Room and Emergency Switchgear Room Air-Conditioning System Chilled Water Piping | Other |
ML073480287 | 23 January 2008 | Siva Lingam NRC/NRR/ADRO/DORL/LPLII-1 | Issuance of Amendments 258 and 257 Regarding Replacement of Main Control Room and Emergency Switchgear Room Air-Conditioning System Chilled Water Piping | Approval |