Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20100H458 | 28 February 1985 | WESTINGHOUSE ELECTRIC COMPANY DIV OF CBS CORP. Meyer T Yanichko S Congedo T | Analysis of Capsule U from Duke Power Co McGuire Unit 1 Reactor Vessel Radiation Surveillance Program | Other |
ML20100H434 | 5 April 1985 | Duke Energy Tucker H | Forwards WCAP-10786, Analysis of Capsule U from Duke Power Co McGuire Unit 1 Reactor Vessel Radiation Surveillance Program, Per App H to 10CFR50.Based on Rept,Rev to Tech Specs May Be Necessary.Nrc Will Be Advised If Rev Needed | Other |
ML20155J567 | 15 May 1986 | Duke Energy Tucker H | Application for Amends to Licenses NPF-9 & NPF-17,changing Tech Specs to Ensure Plant Operation Consistent W/Design & Statements in Unit 1 Cycle 4 Reload Safety Evaluation.Fee Paid | Request |
ML20195E259 | 23 May 1986 | Duke Energy Tucker H | Forwards Peaking Factor Limit Rept for Unit 1,Cycle 4 in Support of 841116 Application for Amends to Licenses NPF-9 & NPF-17.Conclusions in Reload Safety Evaluation Remain Valid | Request |
ML20211G106 | 6 June 1986 | Duke Energy Tucker H | Informs That Correct Date for Submittal of Proposed License Amends Re Cycle 4 Optimized Fuel Assembly Reload Is 860515, Not 841116 as Ref in Transmitting Peaking Factor Limit Rept | Other |
ML20202B388 | 30 June 1986 | Duke Energy | Proposed Tech Specs Re Specific Criteria & Predicted Values of Safety Analyses & Evaluations Performed for Transients Sensitive to Positive Moderator Coefficient | Other |
ML20204H655 | 31 July 1986 | Duke Energy Dzenis E | Rev 1 to Reload Safety Evaluation,Mcguire Nuclear Station, Unit 1 Cycle 4 | Other |
ML20204H649 | 4 August 1986 | Duke Energy | Proposed Tech Specs,Reflecting Revised Design Features to Generally Allow Use of Modified Fuel Assemblies in Core | Other |
ML20204H624 | 4 August 1986 | Duke Energy Tucker H | Revised Application for Amends to License NPF-9 & NPF-17, Changing Design Features Tech Spec Section to Generally Allow Use of Modified Fuel Assemblies in Core.Cycle Specific Reload SER Revised to Reflect Core Redesign | Request |
ML20206M289 | 12 August 1986 | Duke Energy Tucker H | Advises That Rev to Peaking Factor Limit Rept Unnecessary. End of Cycle 3 Refueling Outage Schedule Provided in 860804 Submittal Revised to Reflect Unit 1 860823 Cycle 4 Startup | Other |
ML20214M662 | 28 August 1986 | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) Walker R | Notice of Violation from Insp on 860707-11 | Other |