Letter Sequence Other |
|---|
|
Results
Other: 05000369/LER-1986-013-02, :on 860626,discovered Loose Fuel Pellets from Fuel Assembly D-03 on Reactor Core Baffle Plate Near Core Location P-3.Caused by Baffle Jetting.Assembly Removed from Core & Core Redesigned, ML20100H434, ML20100H458, ML20202B388, ML20204H649, ML20204H655, ML20205C934, ML20206M289, ML20211G106, ML20214M662
|
MONTHYEARML20100H4581985-02-28028 February 1985 Analysis of Capsule U from Duke Power Co McGuire Unit 1 Reactor Vessel Radiation Surveillance Program Project stage: Other ML20100H4341985-04-0505 April 1985 Forwards WCAP-10786, Analysis of Capsule U from Duke Power Co McGuire Unit 1 Reactor Vessel Radiation Surveillance Program, Per App H to 10CFR50.Based on Rept,Rev to Tech Specs May Be Necessary.Nrc Will Be Advised If Rev Needed Project stage: Other ML20155J5671986-05-15015 May 1986 Application for Amends to Licenses NPF-9 & NPF-17,changing Tech Specs to Ensure Plant Operation Consistent W/Design & Statements in Unit 1 Cycle 4 Reload Safety Evaluation.Fee Paid Project stage: Request ML20195E2591986-05-23023 May 1986 Forwards Peaking Factor Limit Rept for Unit 1,Cycle 4 in Support of 841116 Application for Amends to Licenses NPF-9 & NPF-17.Conclusions in Reload Safety Evaluation Remain Valid Project stage: Request ML20211G1061986-06-0606 June 1986 Informs That Correct Date for Submittal of Proposed License Amends Re Cycle 4 Optimized Fuel Assembly Reload Is 860515, Not 841116 as Ref in Transmitting Peaking Factor Limit Rept Project stage: Other ML20202B3881986-06-30030 June 1986 Proposed Tech Specs Re Specific Criteria & Predicted Values of Safety Analyses & Evaluations Performed for Transients Sensitive to Positive Moderator Coefficient Project stage: Other ML20204H6551986-07-31031 July 1986 Rev 1 to Reload Safety Evaluation,Mcguire Nuclear Station, Unit 1 Cycle 4 Project stage: Other ML20204H6491986-08-0404 August 1986 Proposed Tech Specs,Reflecting Revised Design Features to Generally Allow Use of Modified Fuel Assemblies in Core Project stage: Other ML20204H6241986-08-0404 August 1986 Revised Application for Amends to License NPF-9 & NPF-17, Changing Design Features Tech Spec Section to Generally Allow Use of Modified Fuel Assemblies in Core.Cycle Specific Reload SER Revised to Reflect Core Redesign Project stage: Request ML20205C9341986-08-0404 August 1986 Notice of Consideration of Issuance of Amends to Licenses NPF-9 & NPF-17 & Proposed NSHC Determination & Opportunity for Hearing Re Supplemental Request Concerning Optimized Fuel Assemblies Project stage: Other ML20206M2891986-08-12012 August 1986 Advises That Rev to Peaking Factor Limit Rept Unnecessary. End of Cycle 3 Refueling Outage Schedule Provided in 860804 Submittal Revised to Reflect Unit 1 860823 Cycle 4 Startup Project stage: Other ML20214M6621986-08-28028 August 1986 Notice of Violation from Insp on 860707-11 Project stage: Other 05000369/LER-1986-013-02, :on 860626,discovered Loose Fuel Pellets from Fuel Assembly D-03 on Reactor Core Baffle Plate Near Core Location P-3.Caused by Baffle Jetting.Assembly Removed from Core & Core Redesigned1986-08-28028 August 1986
- on 860626,discovered Loose Fuel Pellets from Fuel Assembly D-03 on Reactor Core Baffle Plate Near Core Location P-3.Caused by Baffle Jetting.Assembly Removed from Core & Core Redesigned
Project stage: Other 1986-06-30
[Table View] |
Text
O Duxn Pownn GoMi>m 18.0. IM)x 031fl0 CIIAltIJ)TTE, N.C. Ull242 IIAL 15. TUCKEH tra.rpisown v s e.e e.1 (704) 373-45:n
.mm..
m June 6, 1986 "MrTEnroldR.5Dentos,jDirector Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
B.J. Youngblood, Director PWR Project Directorate #4
Subject:
McCuire Nuclear Station, Unit 1 - Docket No. 50-369 McGuire 1/ Cycle 4 0FA Reload-Peaking Factor Limit Report
Dear Mr. Denton:
My letter of May 23, 1986 submitting the peaking factor limit report for McGuire Unit 1/ Cycle 4 inadvertently referenced an incorrect date (November 16, 1984) of submittal of proposed license amendments related to the McGuire 1/ Cycle 4 0FA Reload.
Please be advised that the correct date of this submittal is May 15, 1986.
Very truly yours, MA%
Hal B. Tucker PBN/j gm xc:
Dr. J. Nelson Grace Mr. Darl Hood Regional Administrator Division of Licensing U.S. NRC - Region II ONRR - U.S. NRC 101 Marietta Street, NW, Suite 2900 Washington, D.C.
20555 Atlanta, Georgia 30323 Mr. Dayne Brown, Chief Mr. W.T. Orders Radiation Protection Branch NRC Resident Inspector Division of Facility Services McGuire Nuclear Station Department of Human Resources P.O. Box 12200 pk Raleigh, North Carolina 27605 6
8606190291 860606 PDR ADOCK 0D000369 PDR p
a Mr. Harold R. Denton, Director June 6, 1986 Page 2 bxc: N. A. Rutherford J.G. Torre R.L. Gill S.A. Gewehr J.B. Day P.M. Abraham M.L. Bellville D.R. Bradshaw K.S. Canady A.V. Carr R.H. Clark L.H. Flores R.C. Futrell E.M. Geddie R.M. Cribble W.A. Haller G.P,.Horne M.S. Kitlan T.L. McConnell E.O. McCraw C.D. Markham (W)
D.S. Marquis D.W. Perone (W)
R.B. Priory P.
Rapone (W-CNS)
W.D. Reckley John Roth (W-MNS)
H.T. Snead G.B. Swindlehurst R.J. Tomonto G.E. Vaughn R.P. Wood T.F. Wyke Section File: MC-801.01 MC-818.09 MC-813.20