Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20108A534 | 12 November 1984 | Duke Energy | Proposed Tech Spec Deleting Surveillance Requirement Re Cold Leg Accumulator Isolation Valve Automatic Actuation | Other |
ML20108A521 | 12 November 1984 | Duke Energy Tucker H | Application for Amends to Licenses NPF-9 & NPF-17,deleting Tech Spec Surveillance Requirement 4.5.1.1.1.d for Cold Leg Accumulator Isolation Valve Automatic Actuation.Automatic Actuation Feature Obsolete.Fee Paid | Request |
ML20099G748 | 16 November 1984 | Duke Energy Tucker H | Application for Amends to Licenses NPF-9 & NPF-17,revising Tech Specs Re Plant Operating Limitations Affected by Use of Optimized Fuel Assembly Designs.Fee paid.Marked-up Tech Specs Encl | Request |
ML20112G107 | 20 December 1984 | Duke Energy Tucker H | Forwards Evaluations of Complete Draindown of Upper Head Injection Sys Water Accumulator & Poor Performance of Kerotest Valves for Compliance W/Tech Spec 4.5.1.2c.Channel Calibr Overlapping Surveillance Satisfies Tech Specs | Other |
ML20101S028 | 30 January 1985 | Duke Energy | Proposed Tech Specs Clarifying Action Statements for Cold Leg Injection Accumulators & Upper Head Injection (Uhi) Sys & Uhi Surveillance Requirements | Other |
ML20101S009 | 30 January 1985 | Duke Energy Tucker H | Application for Amends to Licenses NPF-9 & NPF-17,changing Tech Specs to Clarify Action Statements for Cold Leg Injection Accumulators & Upper Head Injection (Uhi) Sys & Uhi Sys Surveillance Requirements.Fee Paid | Request |
ML20132C399 | 23 September 1985 | Duke Energy Gill R | Responds to NRC 850910 Questions Re Fire Suppression Pump C. Repowering Existing Pump from Class 1E Diesel Would Cause Power to Be Unavailable During Loca.Total Blackout of Plant Switchyard Allowed W/O Effect on 44 Kv Feeder to Pump | Other |