Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
ML20073P47818 April 1983Duke EnergyProposed Change to Tech Spec 4.5.1.2.C.1,revising Setpoint for Upper Head Injection Accumulator Automatic IsolationRequest
ML20073P44918 April 1983Duke Energy
Tucker H
Application for Amend to Tech Spec 4.5.1.2.C.1,revising Setpoint for Upper Head Injection Accumulator Automatic IsolationRequest
ML20073P87925 April 1983Tennessee Valley Authority
Wills J
Provides Info on ECCS Analyses & Max & Min Upper Head Injection Delivery Vol Consistent W/Plant Tank Nominal Setpoint ResultsOther
ML20073T1904 May 1983Duke EnergyRevised Proposed Tech Specs Changing Upper Head Injection Accumulator Automatic Isolation Setpoints to Incorporate Revised Setpoint CalculationOther
ML20073T1744 May 1983Duke Energy
Tucker H
Requests That 830418 Proposed Amend to Tech Specs to Revise Setpoint for Upper Head Injection Accumulator Automatic Isolation Be Changed to Incorporate Revised Setpoint CalculationOther