Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22354A26220 December 2022NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI
IR 05000317/202201019 December 2022Triennial Fire Protection Inspection Report 05000317/2022010 and 05000318/2022010Safe Shutdown
Fire Protection Program
IR 05000317/202240212 December 2022Security Baseline Inspection Report 05000317/2022402 and 05000318/2022402 (Cover Letter Only)Affidavit
RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator7 December 2022Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator
IR 05000317/20220905 December 2022EA-22-089: Calvert Cliffs Nuclear Power Plant, Unit 1 - Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation: Inspection Report 05000317/2022090Foreign Material Exclusion
Preliminary White Finding
ML22293B80530 November 2022Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air SuitsMururoa
RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI30 November 2022Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XIIncorporated by reference
ML22342B14621 November 2022NRR E-mail Capture - Acceptance Review for TSTF 295A
ML22325A00518 November 2022NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2
ML22320A55916 November 20222022 Annual Report - Guarantees of Payment of Deferred Premiums
ML22320A04315 November 2022Response to NRC Inspection Report and Preliminary White FindingPreliminary White Finding
ML22264A19914 November 2022Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 andProbabilistic Risk Assessment
ML22314A08714 November 2022Notification of Conduct of Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors, InspectionSafe Shutdown
Probabilistic Risk Assessment
Maintenance Rule Program
IR 05000317/202250114 November 2022Emergency Preparedness Inspection Report 05000317/2022501 and 05000318/2022501B.5.b
ML22316A01811 November 2022Licensee Event Report 318-2022-002, Revision 00 Unplanned Safety Injection Actuation Signal Due to Human Error
IR 05000317/20220037 November 2022Integrated Inspection Report 05000317/2022003 and 05000318/2022003 and Preliminary White Finding and Apparent ViolationHigh winds
Mission time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
FLEX
Significance Determination Process
Foreign Material Exclusion
Large early release frequency
Operability Determination
Preliminary White Finding
Fire Protection Program
ML22298A01025 October 2022License Amendment Request to Adopt TSTF-273-A, (Safety Function Determination Program) SFDP Clarifications, Revision 2, as Amended by WOG-ED-23, Dated July 17, 1999Offsite Circuit
ML22298A01125 October 2022License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To.Reactor Vessel Water Level
Post Accident Monitoring
ML22290A09519 October 2022Constellation Energy Generation, LLC - Fleet Project Manager Reassignment