Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML08354062624 December 2008Corrected Page to Safety Evaluation of Relief Request to Use Structural Weld Overlay and Alternative Examination Techniques on Safe End Dissimilar Metal WeldsWeld Overlay
Liquid penetrant
Dissimilar Metal Weld
L-2008-266, Data for NRC Confirmatory EPU Analyses23 December 2008Data for NRC Confirmatory EPU Analyses
L-2008-265, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums19 December 200810 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
ML08350003019 December 2008Evaluation of the Request for an Extension of Enforcement Discretion in Accordance with the Interim Enforcement Policy for Fire Protection Issues During Transition to National Fire Protection Standard NFPA 805Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
Fire Protection Program
TAC:ME006319 December 2008
L-2008-262, Extended Power Uprate Data for NRC Confirmatory EPU Analyses18 December 2008Extended Power Uprate Data for NRC Confirmatory EPU Analyses
ML11290A07817 December 2008Drawing 2998-G-062, Rev. 15, General Arrangement Turbine Building - Operating Floor Plan.
L-2008-261, Technical Specification Special Report Inoperable Containment Sump Wide Range Level Channel B16 December 2008Technical Specification Special Report Inoperable Containment Sump Wide Range Level Channel B
L-2008-260, Environmental Protection Plans, Unusual or Important Environmental Event - Manatee16 December 2008Environmental Protection Plans, Unusual or Important Environmental Event - Manatee
ML1023803415 December 2008Marine Turtle Removal Monthly Summary for November 2008
L-2008-254, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors, 10 CFR 50.46 Change Report4 December 2008Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors, 10 CFR 50.46 Change Report
L-2008-253, Inservice Inspection Plans, Unit 1 Fourth Inspection Interval RR 4, and Unit 2 Third Inspection Interval RR 113 December 2008Inservice Inspection Plans, Unit 1 Fourth Inspection Interval RR 4, and Unit 2 Third Inspection Interval RR 11Nondestructive Examination
ML0832502332 December 2008Summary of Public Meeting with Operators of Vogtle Units 1 & 2, San Onofre Units 2 & 3, St. Lucie Unit 1, Turkey Point Unit 3, Indian Point Units 2 & 3, Nuclear Energy Institute, and Alion Science and Technology
TAC:MC66592 December 2008
TAC:MD773926 November 2008
TAC:MD935426 November 2008
ML08284049426 November 2008SE for the Continued Use of Risk-Informed Inservice Inspection ProgramProbabilistic Risk Assessment
Large early release frequency
Exemption Request
Dissimilar Metal Weld
ML08280027826 November 20082006 Biennial Decommissioning Funding Report
ML08268206026 November 2008License Amendment No. 206 Regarding Alternative Source TermBoric Acid
Offsite Dose Calculation Manual
Recently irradiated fuel
GOTHIC
TAC:MD437325 November 2008
ML08326050425 November 2008Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients
ML08315064019 November 2008Corrected Page to Use Structural Weld Overlay and Alternative Examination Techniques on Safe End Dissimilar Metal WeldsWeld Overlay
Liquid penetrant
Dissimilar Metal Weld
ML08323110217 November 2008Correction to Amendment No. 152 Regarding Alternative Source Term
ML1024200307 November 2008Marine Turtle Removal Monthly Summary for October 2008
ML0933403297 November 2008Marine Turtle Removal Monthly Summary for September 2008
ML0831107246 November 2008September 10, 2008, Generic Fundamentals Examination Section LetterGeneric Fundamentals Examination
L-2008-244, Cycle 22 Core Operating Limits Report5 November 2008Cycle 22 Core Operating Limits ReportShutdown Margin
ML0829605463 November 2008Safety Evaluation of Relief Request to Use Structural Weld Overlay and Alternative Examination Techniques on Safe End Dissimilar Metal WeldsWeld Overlay
Nondestructive Examination
Incorporated by reference
Finite Element Analysis
Liquid penetrant
Dissimilar Metal Weld
L-2008-237, Comment (2) of Robert J. Hughes for Point Beach30 October 2008Comment (2) of Robert J. Hughes for Point Beach
IR 05000335/200800430 October 2008IR 05000335-08-004 & 05000389-08-004; on 07/01/2008 - 09/30/2008; St. Lucie Nuclear Plant, Units 1 & 2; Fire Protection and Other ActivitiesHigh winds
Fire Barrier
Internal Flooding
Fire impairment
Condition Adverse to Quality
Significance Determination Process
Operability Determination
License Renewal
Maintenance Rule Program
Downpower
Unidentified leakage
L-2008-236, Extended Power Uprate, Data for NRC Confirmatory EPU Analyses29 October 2008Extended Power Uprate, Data for NRC Confirmatory EPU Analyses
L-2008-235, Request for Extension of the Completion Date of the St. Lucie Unit 1 NRC Generic Letter 2004-02 Actions29 October 2008Request for Extension of the Completion Date of the St. Lucie Unit 1 NRC Generic Letter 2004-02 ActionsProbabilistic Risk Assessment
L-2008-233, Units 1 and 2 - Correspondence Distribution Listing Update Request28 October 2008Units 1 and 2 - Correspondence Distribution Listing Update Request
ML08298043424 October 2008Correction to Amendments Regarding Control Room Habitability, TDTF-448Safe Shutdown
ML08295069121 October 2008Notice of Public Meeting with Operators of Vogtle Units 1 & 2, San Onofre Nuclear Generating Station Units 2 & 3, St. Lucie Unit 1 Turkey Point Unit 3, Indian Point, Units 2 & 3 NEI and Alion Science and Technology to Discuss Licensee'S..
ML08295066020 October 2008Notice of Violation (Nuclear Regulatory Commission Office of Investigations Report No. 2-2007-011, St. Lucie Nuclear Plant)Contraband
ML08295047020 October 2008Confirmatory Order (Effective Immediately), NRC Office of Investigation Report No. 2-2007-011Enforcement Discretion
ML08291063317 October 2008Notification of Triennial Fire Protection Baseline Inspection While Transition to 10 CFR Part 50.48(c) Is in Progress (NRC Inspection Report 050000335-09-007, 05000389-09-007)Safe Shutdown
Fitness for Duty
Fire Barrier
Fire impairment
Temporary Modification
Fire Protection Program
IR 05000335/200840315 October 2008IR 05000335-08-403, IR 05000389-08-403, Saint Lucie Nuclear Plant-NRC Physical Security Inspection ReportAffidavit
L-2008-223, Florida Power & Light - Official Service List Change15 October 2008Florida Power & Light - Official Service List Change
L-2008-221, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.14 October 2008Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.Unanalyzed Condition
Boric Acid
Stroke time
ML08289094413 October 2008Comment (4) of Robert J. Hughes on Behalf of Florida Power and Light Company Regarding Proposed Rule Pr 73, Criminal Penalties; Unauthorized Introduction of Weapons.
IR 05000335/20083013 October 2008Er 05000335-08-301, 05000389-08-301, 07/23-25 and 07/28-30/2008 and 08/01/2008; St. Lucie Nuclear Plant, Licensed Operator ExaminationsDownpower
ML11290A0752 October 2008Drawing 2998-G-880, Rev. 23, HVAC - Equipment Schedules & Details. Sheet 1
L-2008-215, Revised Schedule for Converting the Florida Power and Light Company and FPL Energy Seabrook Consolidated Physical Security Plan, Training and Qualification Plan, and Safeguards..2 October 2008Revised Schedule for Converting the Florida Power and Light Company and FPL Energy Seabrook Consolidated Physical Security Plan, Training and Qualification Plan, and Safeguards..