Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
NRC-09-0024, 2008 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual for 2008 Revisions | 31 December 2008 | 2008 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual for 2008 Revisions | Time of Discovery Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Fuel cladding Tritium Power change |
NRC-09-0024, Fermi 2 - 2008 Annual Radiological Environmental Operating Report | 31 December 2008 | Fermi 2 - 2008 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
ML091260479 | 31 December 2008 | Fermi 2 - 2008 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
NRC-08-0078, Withdrawal of Two Proposals from the Proposed Revision to the Fermi 2 Radiological Emergency Response Preparedness Plan | 30 December 2008 | Withdrawal of Two Proposals from the Proposed Revision to the Fermi 2 Radiological Emergency Response Preparedness Plan | |
ML083450161 | 4 December 2008 | GFE Annual Registration Letter - 2009 Examinations | Generic Fundamentals Examination |
NRC-08-0073, Price-Anderson Act Guarantee of Payment of Deferred Premiums | 26 November 2008 | Price-Anderson Act Guarantee of Payment of Deferred Premiums | |
ML083240167 | 25 November 2008 | Note to File for Meeting Summary of Nov. 5, 2008 | |
Press Release-08-216, NRC Accepts Application for New Reactor at Fermi Site | 25 November 2008 | Press Release-08-216: NRC Accepts Application for New Reactor at Fermi Site | |
NRC-08-0075, Detroit Edison - Personnel Change at Detroit Edison Company | 25 November 2008 | Detroit Edison - Personnel Change at Detroit Edison Company | |
ML083190063 | 25 November 2008 | J. Plona Ltr Report of November 5, 2008 Category 1 Meeting, FERMI-1, Docket 050-00016 (TAC J00334) | |
ML083330187 | 21 November 2008 | Notification of Potential Part 21 Re Tyco Electronics, Transfer of Information - CII-012 | |
NRC-08-0071, Enrico Fermi Atomic Power Plant, Unit No. 1 - Submittal of Revision 5 to the Safety Analysis Report | 20 November 2008 | Enrico Fermi Atomic Power Plant, Unit No. 1 - Submittal of Revision 5 to the Safety Analysis Report | |
ML083290351 | 19 November 2008 | Orise Letter Report for Analytical Results for Three Soil Samples from Enrico Fermi Unit 1, Monroe, Michigan | |
IR 05000341/2008004 | 12 November 2008 | IR 05000341-08-004, on 07/01/2008 - 09/30/2008, Fermi, Unit 2, Fire Protection, Maintenance Risk Assessments and Emergent Work Control, Problem Identification and Resolution | Safe Shutdown High winds High Radiation Area Offsite Dose Calculation Manual Tornado Missile Probabilistic Risk Assessment Temporary Modification Tornado-Generated Missile Tornado Generated Missile Significance Determination Process TORMIS Fire Protection Program Power Uprate |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | |
ML093640143 | 6 November 2008 | Engineering Calculation No. ENG-006, Revision 000, Calculation of DTE EF-1 Area Factors for Soil. | |
NRC-09-0080, Engineering Calculation No. ENG-006, Revision 000, Calculation of DTE EF-1 Area Factors for Soil. | 6 November 2008 | Engineering Calculation No. ENG-006, Revision 000, Calculation of DTE EF-1 Area Factors for Soil. | |
ML083300420 | 5 November 2008 | Summary of 11/5/2008 Meeting License Amendment and Site Decommissioning Plans for Fermi-1 Reactor | |
ML093640141 | 4 November 2008 | Engineering Calculation No. ENG-005, Revision 0, Calculation of EF1 Building Surface Area Factors. | |
NRC-09-0080, Engineering Calculation No. ENG-005, Revision 0, Calculation of EF1 Building Surface Area Factors. | 4 November 2008 | Engineering Calculation No. ENG-005, Revision 0, Calculation of EF1 Building Surface Area Factors. | |
ML083220260 | 4 November 2008 | DTE Fermi 1 License Termination Plan Handout | |
IR 05000341/2008007 | 2 November 2008 | IR 05000341-08-007, on 10/20/2008 - 10/24/2008, Fermi Power Plant, Unit 2, Ti 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2 and 3, Mitigating Strategies - Cover Letter | B.5.b Mitigating Strategies |
ML083080173 | 29 October 2008 | Ltr. 10/29/2008 Fermi Re Initial Examination 120-Day Letter | |
ML083050405 | 29 October 2008 | Master Inspection Plan - Fiscal Year 2009 | |
IR 05000341/2008403 | 22 October 2008 | IR 05000341-08-403, (Drs), on 09/08/2008 - 09/12/2008, Fermi Power Plant, Unit 2, Routine Security Baseline Inspection - Cover Letter | Affidavit |
NRC-08-0064, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | 14 October 2008 | Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | Safe Shutdown High Radiation Area Locked High Radiation Area Scaffolding |
ML082880573 | 10 October 2008 | Summary of Public Meeting to Discuss Repetitive Substantive Cross Cutting Issues | |
ML082820267 | 9 October 2008 | Meeting Slides, Fermi Human Performance. | |
ML093640139 | 7 October 2008 | Engineering Calculation No. ENG-003, Revision 0, Calculation of EF1 Building Surface Dcgls. | |
NRC-09-0080, Engineering Calculation No. ENG-003, Revision 0, Calculation of EF1 Building Surface Dcgls. | 7 October 2008 | Engineering Calculation No. ENG-003, Revision 0, Calculation of EF1 Building Surface Dcgls. | |
ML093640140 | 7 October 2008 | Engineering Calculation No. ENG-004, Revision 000, Calculation of Enrico Fermi 1 Derived Concentration Guideline Levels for Soil. | |
NRC-09-0080, Engineering Calculation No. ENG-004, Revision 000, Calculation of Enrico Fermi 1 Derived Concentration Guideline Levels for Soil. | 7 October 2008 | Engineering Calculation No. ENG-004, Revision 000, Calculation of Enrico Fermi 1 Derived Concentration Guideline Levels for Soil. | |
ML082880615 | 7 October 2008 | Confirmation of Initial Operator License Examinations | |
ML082630709 | 6 October 2008 | Notice of Meeting with Fermi-1 Regarding Status of License Termination Planning Development |