Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML090070267 | 31 December 2008 | FW: Survey: Cooling Tower with Wooden Structures or Supports | |
L-2008-265, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 19 December 2008 | 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
ML083460261 | 18 December 2008 | Audit of the Licensee'S Management of Regulatory Commitments | |
TAC:MD6021 | 18 December 2008 | ||
NG-08-0961, Response to Issues Raised in the Review Status of the License Renewal Application | 18 December 2008 | Response to Issues Raised in the Review Status of the License Renewal Application | Aging Management Thermoset |
ML083530149 | 17 December 2008 | Notification of NRC Inspection and Request for Information | Nondestructive Examination VT-2 Scaffolding |
ML083290275 | 11 December 2008 | Review Status of the License Renewal Application for the Duane Arnold Energy Center | Aging Management Thermoset |
ML083450161 | 4 December 2008 | GFE Annual Registration Letter - 2009 Examinations | Generic Fundamentals Examination |
ML083190108 | 3 December 2008 | License Amendment, Issuance of Amendment to Change Surveillance Requirements of the Cedar River Depth to Assure Ultimate Heat Sink Operability | Ultimate heat sink |
ML083330167 | 28 November 2008 | Draft RAI on Proposed Amendment Regarding Degraded Voltage Maximum Allowable Value | |
IR 05000331/2008502 | 25 November 2008 | IR 05000331-08-502 (Drs); on 10/20/2008 - 10/23/2008; Duane Arnold Energy Center; Baseline Emergency Preparedness Biennial Exercise Inspection | |
TAC:MD7542 | 24 November 2008 | ||
ML083300096 | 24 November 2008 | MD7542 - State Consultation - Duane Arnold Energy Center - Amendment Regarding Surveillance of Cedar River Depth | |
ML083220289 | 21 November 2008 | Correction of Amendment No. 271 Regarding Control Rod Notch Testing Frequency | |
ML090570189 | 20 November 2008 | Energysolutions - Document No. 82A9634, Revision 0, Decommissioning Cost Estimate Study for the Duane Arnold Energy Center. | |
ML083120501 | 7 November 2008 | Press Release 08-203: License Renewal Application for Duane Arnold Nuclear Power Plant Available for Public Inspection | |
ML082770041 | 7 November 2008 | Receipt and Availability of the License Renewal Application for the Duane Arnold Energy Center | |
ML082810664 | 7 November 2008 | Notice of Receipt and Availability of Application for Renewal of Duane Arnold Energy Center | |
ML082690835 | 6 November 2008 | Issuance of License Amendment Regarding Control Rod Notch Testing Frequency and Clarification of a Frequency Example | Anticipated operational occurrence Overtravel Fuel cladding Grace period |
IR 05000331/2008004 | 4 November 2008 | IR 05000331-08-004 on 07/01/2008 - 09/30/2008 for Duane Arnold Energy Center | High Radiation Area Internal Flooding Hydrostatic Past operability Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Fire Protection Program |
TAC:MD7541 | 3 November 2008 | ||
ML083080371 | 3 November 2008 | Email - State Consultation - Change to Control Rod Notch Testing Frequency | |
ML092150509 | 31 October 2008 | DAEC Lr - Idnr Final Iowa Greenhouse Gas Inventory and Reference Case Projections 1990-2025 | |
L-2008-237, Comment (2) of Robert J. Hughes for Point Beach | 30 October 2008 | Comment (2) of Robert J. Hughes for Point Beach | |
L-2008-233, Units 1 and 2 - Correspondence Distribution Listing Update Request | 28 October 2008 | Units 1 and 2 - Correspondence Distribution Listing Update Request | |
ML082900963 | 22 October 2008 | Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems of Cause Plant Transients | |
TAC:MD4325 | 22 October 2008 | ||
IR 05000331/2008404 | 21 October 2008 | IR 05000331-08-404; Florida Power & Light Duane Arnold Energy; 03/24/2008 - 10/08/2008; Duane Arnold Energy Center; Security Baseline Inspection | |
L-2008-223, Florida Power & Light - Official Service List Change | 15 October 2008 | Florida Power & Light - Official Service List Change | |
NG-08-0777, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | 13 October 2008 | Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | Safe Shutdown Scaffolding |
ML082880634 | 7 October 2008 | Confirmation of Initial Operator License Examinations | |
ML082480680 | 3 October 2008 | Authorization of Relief Request Stock Rotation of Recirculation Pump Seal Assemblies | Incorporated by reference |
ML082620438 | 3 October 2008 | Acceptance Ltr. 2008-09-18-1250, Acceptance of Request for License Amendment Pertaining to Revision of the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value |