Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML08338033431 December 2008Summary of Conference Call with Arkansas Nuclear One Unit 1, Regarding 2008 Steam Generator Tube InspectionsNondestructive Examination
Finite Element Analysis
ML10190040731 December 2008State of Arkansas Environmental Monitoring Report
ML10235052431 December 2008State of Arkansas Environmental Monitoring Report
ML08350040422 December 2008Evaluation of the Request for an Extension of Enforcement Discretion in Accordance with the Interim Enforcement Policy for Fire Protection Issues During Transition to National Fire Protection Standard NFPA 805Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
Fire Protection Program
ML08319083615 December 2008Summary of Telephone Conference Call Held on November 3, 2008, Between the NRC and Entergy Operations, Inc. Concerning Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10 CFR 50.48(C), NatEnforcement Discretion
1CAN107080, License Amendment Request Supplemental Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers11 December 2008License Amendment Request Supplemental Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers
2CAN120801, License Amendment Request Supplemental Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM11 December 2008License Amendment Request Supplemental Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM
ML0834401485 December 2008NSNI/OSART/08/147, Report of Osart Operational Safety Review Team, Mission to Arkansas Nuclear One, 06/15/08 - 07/02/08.Boric Acid
Shutdown Margin
High Radiation Area
Grab sample
Temporary Modification
Emergency Lighting
Locked High Radiation Area
Job Performance Measure
Foreign Material Exclusion
Scaffolding
ML0832905851 December 2008Summary of Meeting with Entergy Operations, Inc. to Discuss the First Inservice Inspection (Lsi) Results for the New Steam Generators at Arkansas Nuclear One, Unit 1
IR 05000313/20084041 December 2008Final Significance Determination for a Security-Related Greater than Green Finding and Notice of Violation (NRC Physical Security Special Inspection Report 05000313-08-404; 05000368-08-404)
ML0833604031 December 2008Final Significance Determination for a Security-Related Greater than Green Finding and Notice of Violation (NRC Physical Security Special Inspection Report 05000313-08-404; 05000368-08-404)
ML08296050224 November 2008Entergy Operations, Inc. Request for Withholding Information from Public Disclosure for Arkansas Nuclear One, Unit 1
ML08338067524 November 2008One, Unit 1 - Request for Additional Information TS 3.0.8
ML08338066324 November 2008E-mail Request for Additional Information Regarding the Addition of LCO 3.0.8 on the Impact of Inoperable Snubbers
CNRO-2008-00035, Follow-up to Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 80520 November 2008Follow-up to Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 805Enforcement Discretion
1CAN110804, Summary of Weld Overlay Ultrasonic Examinations of Hot Leg Nozzle Dissimilar Metal Weld for Alloy 600 Mitigation at ANO-119 November 2008Summary of Weld Overlay Ultrasonic Examinations of Hot Leg Nozzle Dissimilar Metal Weld for Alloy 600 Mitigation at ANO-1Weld Overlay
Dissimilar Metal Weld
DM weld
1CAN110801, Cycle 22 Core Operating Limits Report (COLR)13 November 2008Cycle 22 Core Operating Limits Report (COLR)Shutdown Margin
2CAN110801, Technical Specification Change to Modify RCS Flow Verification13 November 2008Technical Specification Change to Modify RCS Flow VerificationAnticipated operational occurrence
ML08326032212 November 2008Letter to Elmo E. Collins from FEMA, Region IV, Denton, Texas Dated 11-12-2008 Subj: ANO Radiological EP Final Report for ANO
ML08319001712 November 2008Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28
ML08318120412 November 2008Notification of NRC Initial Operator Licensing Retake Examination
IR 05000313/20080047 November 2008IR 05000313-08-004 and 05000368-08-004, on 06/24/2008 - 09/23/2008,Arkansas Nuclear One, Units 1 and 2, Integrated Resident Report, Problem Identification and Resolution; Event Follow Up, and OtherSafe Shutdown
Boric Acid
High Radiation Area
Internal Flooding
Temporary Modification
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Scaffolding
ML0831102066 November 2008Summary of Meeting with Entergy to Discuss an Open Substantive Crosscutting Issue at Arkansas Nuclear One
ML0833802633 November 2008NRC 1R20 SG Conference Call QuestionsFinite Element Analysis
ML0833802593 November 20081R20 SG Conference Call Questions
ML08273080028 October 2008Upcoming Steam Generator Tube Inservice InspectionNondestructive Examination
ML08294000328 October 2008Arkansas, Nuclear One, Units 1 and 2, Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
TAC:MD429428 October 2008
TAC:MD972928 October 2008
ML08301005323 October 2008NFPA 805 Transition Pilot Plant FAQ 06-0022, Revision 2Coatings
Fire Protection Program
IR 05000313/200840221 October 2008NRC Security Inspection Report 05000313-08-402 and 05000368-08-402Significance Determination Process
IR 05000313/200800621 October 2008IR 05000313-08-006, IR 05000368-08-006, on 09/11/2008, Arkansas Nuclear One - NRC Inspection Site-Specific Implementation of B.5.b Phase 2 and 3 Mitigating Strategies Temporary Instruction InspectionB.5.b
ML08294040620 October 2008Acceptance Review Email of Requested Licensing Action Re License Amendment Request, NPF-38-280
ML08291045417 October 2008Acceptance Review of LAR Regarding Naoh
0CAN100801, ISFSI, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.14 October 2008ISFSI, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.Non-Destructive Examination
Stroke time
Temporary Modification
Condition Adverse to Quality
Scaffolding
2CAN100802, CFR 50.59 Summary Report for Period Ending October 6, 200813 October 2008CFR 50.59 Summary Report for Period Ending October 6, 2008Safe Shutdown
Boric Acid
Coatings
Missed surveillance
Fuel cladding
TAC:MD99349 October 2008
ML0827307778 October 2008Audit of Entergy Operations, Inc. Management of Regulatory Commitments (TAC Nos. MD96665 and MD9666)Weld Overlay
TAC:MD96658 October 2008
TAC:MD95026 October 2008
ML0828002366 October 2008Acceptance Email of LAR Regarding ILRT Extension for Unit 2
ML0828001116 October 20082008 -09 - Examination Report
1CAN100801, Supplemental Information for Sodium Hydroxide Tank Concentration License Amendment Request2 October 2008Supplemental Information for Sodium Hydroxide Tank Concentration License Amendment Request
ML0828000611 October 2008Enclosure 3-Technical Papers 2 - Plant Application of Weld Onlay for Butt Weld MitigationWeld Overlay
Nondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
DM weld
ML0826603391 October 2008Amendment Re Sodium Hydroxide (Naoh) Tank Solution Concentration