Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
NRC 2018-0044, Supplement to Response to Request for Additional Information Regarding License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, ... | 28 September 2018 | Supplement to Response to Request for Additional Information Regarding License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, ... | Internal Flooding Probabilistic Risk Assessment Cyber Security Fire Protection Program |
ML18270A248 | 27 September 2018 | NRR E-mail Capture - Draft - Request for Additional Information - License Amendment Request 288, Request to Extend Containment Leakage Rate Test Frequency - EPID L-2018-LLA-0097 | FLEX Fukushima Dai-Ichi |
IR 05000266/2018010 | 26 September 2018 | NRC Problem Identification and Resolution Inspection Report 05000266/2018010 and 05000301/2018010 | Boric Acid Fitness for Duty Fire Barrier Commercial Grade Dedication Cyber Security Test box Operability Determination Fatigue Rule Fatality Siren |
ML18254A429 | 4 September 2018 | NRR E-mail Capture - LIC-109 Acceptance of Point Beach Nuclear Plant, Units 1 and 2 - License Amendment Request 290 - Application to Revise TS to Adopt TSTF-547, Clarification of Rod Position Requirements - EPID L-2018-LLA-0207 | |
NRC 2018-0040, NextEra Energy Point Beach, LLC, Exemption Request to Support Updated Final Response to NRC Generic Letter 2004-02 | 30 August 2018 | NextEra Energy Point Beach, LLC, Exemption Request to Support Updated Final Response to NRC Generic Letter 2004-02 | Boric Acid Probabilistic Risk Assessment Coatings Severe Accident Management Guideline Exemption Request |
IR 05000266/2018005 | 28 August 2018 | Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2018005 and 05000301/2018005) | Fitness for Duty Cyber Security License Renewal |
NRC 2018-0039, Registration of Nuhoms -32PT Casks WNHOMS-32-045, WNHOMS-32-047, and WNHOMS-32-049 | 16 August 2018 | Registration of Nuhoms -32PT Casks WNHOMS-32-045, WNHOMS-32-047, and WNHOMS-32-049 | |
ML18220B019 | 13 August 2018 | 7/12/2018 Summary of Meeting with NextEra Energy Point Beach, Llc. to Discuss Supplemental Response to the RAI for Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit 1 and 2 (CAC Nos. MF9532 & MF9533; ... | Probabilistic Risk Assessment |
NRC 2018-0038, Response to Request for Additional Information Regarding License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear | 10 August 2018 | Response to Request for Additional Information Regarding License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear | Safe Shutdown High winds Mission time Internal Flooding Probabilistic Risk Assessment Cyber Security FLEX Large early release frequency Risk-Informed Steering Committee Fire Protection Program |
ML18200A181 | 8 August 2018 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident | Unanalyzed Condition Ultimate heat sink Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Backfit |
IR 05000266/2018002 | 6 August 2018 | NRC Integrated Inspection Report 05000266/2018002 and 05000301/2018002 and Exercise of Enforcement Discretion | Hot Short Unanalyzed Condition High winds Tornado Missile Internal Flooding Enforcement Discretion Functionality Assessment FLEX Tornado-Generated Missile Tornado Generated Missile Significance Determination Process Tornado Missile Protection Process Control Program Operability Determination Fire Protection Program |
IR 05000266/2018201 | 1 August 2018 | NRC Inspection Report 05000266/2018201 and 05000301/2018201 - No Findings | Affidavit |
ML18214A153 | 1 August 2018 | NRR E-mail Capture - Final - Second Round RAIs - Point Beach Nuclear Plant, Units 1 and 2 - License Amendment Request to Resolve Non-conformances Relating to Containment Dome Truss - EPID L-2017-LLA-0209 | Internal Flooding Probabilistic Risk Assessment |
NRC 2018-0028, NextEra Energy Point Beach, LLC (NextEra) - License Amendment Request 290, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements | 30 July 2018 | NextEra Energy Point Beach, LLC (NextEra) - License Amendment Request 290, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements | Shutdown Margin Surveillance Frequency Control Program |
ML18199A603 | 26 July 2018 | Audit Summary for Duane Arnold and Point Beach, License Amendment Requests to Adopt Title 10 of the Code of Federal Regulations Part 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power | Probabilistic Risk Assessment |
NRC 2018-0036, Registration of NUHOMS-32PT Casks, WNHOMS-32-046, WNHOMS-32-048, and WNHOMS-32-050 | 19 July 2018 | Registration of NUHOMS-32PT Casks, WNHOMS-32-046, WNHOMS-32-048, and WNHOMS-32-050 | |
ML18193B092 | 12 July 2018 | Ltr 071218 Point Beach Nuclear Plant, Unit 2 - Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000266/2018004; 05000301/2018004 (Jen) | Boric Acid Nondestructive Examination Aging Management Foreign Material Exclusion Dissimilar Metal Weld Scaffolding |
ML18213A391 | 12 July 2018 | Public Meeting |