Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
CAC:MF0825 | 29 September 2016 | ||
ML16225A276 | 29 September 2016 | Issuance of Amendments to Revise Technical Specification for Essential Raw Cooling Water System Allowed Completion Time | Boric Acid Ultimate heat sink Surveillance Frequency Control Program |
CNL-16-158, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | 28 September 2016 | Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | |
ML16265A317 | 21 September 2016 | NRR E-mail Capture - (External_Sender) 09/23/2016 Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Post-Submittal Walk-Through - Slides | |
CAC:MF8391 | 20 September 2016 | ||
CNL-16-136, Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041 | 20 September 2016 | Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041 | |
CNL-16-049, Withdrawal of Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04) | 19 September 2016 | Withdrawal of Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04) | |
ML16259A028 | 13 September 2016 | Notification of Inspection and Request for Documents | |
IR 05000327/2016302 | 12 September 2016 | NRC Operator License Examination Report 05000327/2016302 and 05000328/2016302 | |
NRC-2016-0199, FRN: Exemption; Issuance. Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2 | 9 September 2016 | FRN: Exemption; Issuance. Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2 | Exemption Request |
ML16259A390 | 9 September 2016 | Submittal of Discharge Monitoring Report for August 2016 | Grab sample |
ML16208A569 | 9 September 2016 | Exemption from the Requirements of 10 CFR Part 50, Section 50.75(h)(2) and 10 CFR 50382(a)(8) | Exemption Request |
ML16208A590 | 9 September 2016 | FRN: Exemption; Issuance. Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2 | Exemption Request |
ML16256A778 | 7 September 2016 | Submittal of Corrected May 2016 Toxicity Report | |
ML16253A404 | 6 September 2016 | Requalification Program Inspection - Sequoyah Nuclear Plant | Job Performance Measure |
ML16225A633 | 2 September 2016 | Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Relief Request for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (TAC Nos. MF7754-MF7760) | |
IR 05000327/2016005 | 31 August 2016 | Mid-Cycle Assessment Letter for Sequoyah Nuclear Plant Units 1 and 2, NRC Inspection Report 05000327/2016005, 05000328/2016005 | Spent Fuel Pool Instrumentation |
IR 05000327/2016008 | 31 August 2016 | NRC Supplemental Inspection Report 05000327/2016008, March 11-15, 2016 | Post Accident Monitoring Condition Adverse to Quality Significance Determination Process |
ML16245A291 | 25 August 2016 | Submittal of 2016 Discharge Monitoring Report Quality Assurance (DMR-QA) Study 36 Provider-Graded Test Results | |
IR 05000327/2016002 | 12 August 2016 | NRC Integrated Inspection Report 05000327/2016002 and 05000328/2016002 | Safe Shutdown Fire Barrier Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program Power change |
ML16229A156 | 11 August 2016 | Submittal of Discharge Monitoring Report for July 2016 | |
CNL-16-128, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14 | 3 August 2016 | Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14 | |
IR 05000327/2016007 | 28 July 2016 | NRC Design Bases Inspection (Team) Report 05000327/2016007 and 05000328/2016007 | Probabilistic Risk Assessment FLEX Significance Determination Process Large early release frequency Time Critical Operator Action |
CNL-16-123, Response to NRC Request for Additional Information Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 | 28 July 2016 | Response to NRC Request for Additional Information Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 | |
CNL-16-121, Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days | 22 July 2016 | Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days | Ultimate heat sink |
ML16201A119 | 18 July 2016 | (Retake) Operator Licensing Operating Test Approval 05000327/2016302 and 05000328/2016302 | |
ML16200A037 | 18 July 2016 | Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
CNL-16-115, Notification of Change in Completion Schedule Regarding the Improved Flood Mitigation System Project | 15 July 2016 | Notification of Change in Completion Schedule Regarding the Improved Flood Mitigation System Project | FLEX |
ML16200A363 | 14 July 2016 | Scenario Package for the 2016 Sequoyah Bar Nuclear Plant Radiological Emergency Plan Exercise Scheduled for September 14, 2016 | |
CNL-16-120, Bar Nuclear Plant - Emergency Plan Exercise and Preparedness Drills | 14 July 2016 | Bar Nuclear Plant - Emergency Plan Exercise and Preparedness Drills | |
NL-16-120, Scenario Package for the 2016 Sequoyah Bar Nuclear Plant Radiological Emergency Plan Exercise Scheduled for September 14, 2016 | 14 July 2016 | Scenario Package for the 2016 Sequoyah Bar Nuclear Plant Radiological Emergency Plan Exercise Scheduled for September 14, 2016 | |
CAC:MF6032 | 13 July 2016 | ||
ML16194A115 | 13 July 2016 | Staff Assessment of the Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluations(Public) | Fukushima Dai-Ichi |
ML16195A030 | 12 July 2016 | NRR E-mail Capture - RAI for Relief Request 16-PDI-5 for Watts Bar 1 and 2, Browns Ferry 1, 2, and 3, and Sequoyah 1 and 2 | |
ML16190A425 | 5 July 2016 | June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover Letter | Generic Fundamentals Examination |
ML16154A085 | 1 July 2016 | Federal Register Notice on Sequoyah Nuclear Plant, Units 1 and 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing on Completion Date of Cyber Security Plan Implementatio | Cyber Security Exemption Request |
NRC-2016-0130, Federal Register Notice on Sequoyah Nuclear Plant, Units 1 and 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing on Completion Date of Cyber Security Plan Implemen | 1 July 2016 | Federal Register Notice on Sequoyah Nuclear Plant, Units 1 and 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing on Completion Date of Cyber Security Plan Implementatio | Cyber Security Exemption Request |