Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CAC:MF082529 September 2016
ML16225A27629 September 2016Issuance of Amendments to Revise Technical Specification for Essential Raw Cooling Water System Allowed Completion TimeBoric Acid
Ultimate heat sink
Surveillance Frequency Control Program
CNL-16-158, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions28 September 2016Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
ML16265A31721 September 2016NRR E-mail Capture - (External_Sender) 09/23/2016 Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Post-Submittal Walk-Through - Slides
CAC:MF839120 September 2016
CNL-16-136, Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ000000201600004120 September 2016Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041
CNL-16-049, Withdrawal of Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04)19 September 2016Withdrawal of Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04)
ML16259A02813 September 2016Notification of Inspection and Request for Documents
IR 05000327/201630212 September 2016NRC Operator License Examination Report 05000327/2016302 and 05000328/2016302
NRC-2016-0199, FRN: Exemption; Issuance. Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 29 September 2016FRN: Exemption; Issuance. Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2Exemption Request
ML16259A3909 September 2016Submittal of Discharge Monitoring Report for August 2016Grab sample
ML16208A5699 September 2016Exemption from the Requirements of 10 CFR Part 50, Section 50.75(h)(2) and 10 CFR 50382(a)(8)Exemption Request
ML16208A5909 September 2016FRN: Exemption; Issuance. Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2Exemption Request
ML16256A7787 September 2016Submittal of Corrected May 2016 Toxicity Report
ML16253A4046 September 2016Requalification Program Inspection - Sequoyah Nuclear PlantJob Performance Measure
ML16225A6332 September 2016Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Relief Request for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (TAC Nos. MF7754-MF7760)
IR 05000327/201600531 August 2016Mid-Cycle Assessment Letter for Sequoyah Nuclear Plant Units 1 and 2, NRC Inspection Report 05000327/2016005, 05000328/2016005Spent Fuel Pool Instrumentation
IR 05000327/201600831 August 2016NRC Supplemental Inspection Report 05000327/2016008, March 11-15, 2016Post Accident Monitoring
Condition Adverse to Quality
Significance Determination Process
ML16245A29125 August 2016Submittal of 2016 Discharge Monitoring Report Quality Assurance (DMR-QA) Study 36 Provider-Graded Test Results
IR 05000327/201600212 August 2016NRC Integrated Inspection Report 05000327/2016002 and 05000328/2016002Safe Shutdown
Fire Barrier
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
Power change
ML16229A15611 August 2016Submittal of Discharge Monitoring Report for July 2016
CNL-16-128, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 143 August 2016Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14
IR 05000327/201600728 July 2016NRC Design Bases Inspection (Team) Report 05000327/2016007 and 05000328/2016007Probabilistic Risk Assessment
FLEX
Significance Determination Process
Large early release frequency
Time Critical Operator Action
CNL-16-123, Response to NRC Request for Additional Information Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-528 July 2016Response to NRC Request for Additional Information Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5
CNL-16-121, Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days22 July 2016Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 DaysUltimate heat sink
ML16201A11918 July 2016(Retake) Operator Licensing Operating Test Approval 05000327/2016302 and 05000328/2016302
ML16200A03718 July 2016Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
CNL-16-115, Notification of Change in Completion Schedule Regarding the Improved Flood Mitigation System Project15 July 2016Notification of Change in Completion Schedule Regarding the Improved Flood Mitigation System ProjectFLEX
ML16200A36314 July 2016Scenario Package for the 2016 Sequoyah Bar Nuclear Plant Radiological Emergency Plan Exercise Scheduled for September 14, 2016
CNL-16-120, Bar Nuclear Plant - Emergency Plan Exercise and Preparedness Drills14 July 2016Bar Nuclear Plant - Emergency Plan Exercise and Preparedness Drills
NL-16-120, Scenario Package for the 2016 Sequoyah Bar Nuclear Plant Radiological Emergency Plan Exercise Scheduled for September 14, 201614 July 2016Scenario Package for the 2016 Sequoyah Bar Nuclear Plant Radiological Emergency Plan Exercise Scheduled for September 14, 2016
CAC:MF603213 July 2016
ML16194A11513 July 2016Staff Assessment of the Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluations(Public)Fukushima Dai-Ichi
ML16195A03012 July 2016NRR E-mail Capture - RAI for Relief Request 16-PDI-5 for Watts Bar 1 and 2, Browns Ferry 1, 2, and 3, and Sequoyah 1 and 2
ML16190A4255 July 2016June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover LetterGeneric Fundamentals Examination
ML16154A0851 July 2016Federal Register Notice on Sequoyah Nuclear Plant, Units 1 and 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing on Completion Date of Cyber Security Plan ImplementatioCyber Security
Exemption Request
NRC-2016-0130, Federal Register Notice on Sequoyah Nuclear Plant, Units 1 and 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing on Completion Date of Cyber Security Plan Implemen1 July 2016Federal Register Notice on Sequoyah Nuclear Plant, Units 1 and 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing on Completion Date of Cyber Security Plan ImplementatioCyber Security
Exemption Request