CNL-18-025, Annual Insurance Status Report28 March 2018Annual Insurance Status Report
CNL-18-024, Guarantee of Payment of Deferred Premiums - 2017 Annual Report28 March 2018Guarantee of Payment of Deferred Premiums - 2017 Annual Report
CNL-18-047, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions28 March 2018Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
ML18087A00221 March 2018Crane Nuclear, Inc. - Final Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in StemCondition Adverse to Quality
CNL-17-010, Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06)16 March 2018Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06)Safe Shutdown
High winds
Ultimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
Multiple Spurious Operation
Large early release frequency
Turbine Missile
CNL-17-150, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04)9 March 2018Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04)Safe Shutdown
ML18064A3589 March 2018Reassignment of U.S. Nuclear Regulatory Commission Acting Branch Chief
ML18075A0268 March 2018Submittal of Discharge Monitoring Report for February 2018
Press Release-18-008, NRC Issues Annual Assessments for Nation'S Nuclear Plants5 March 2018Press Release-18-008: NRC Issues Annual Assessments for Nation'S Nuclear Plants
CNL-18-029, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 165 March 2018Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 16
ML18061A0362 March 2018IAEA Report of the Operational Safety Review Team (Osart) Mission to the Sequoyah Nuclear Power PlantBoric Acid
Ultimate heat sink
Grab sample
Anticipated operational occurrence
Probabilistic Risk Assessment
Locked High Radiation Area
FLEX
Aging Management
Foreign Material Exclusion
Severe Accident Management Guideline
Earthquake
Scaffolding
CNL-18-031, Third Periodic Schedule Update for Revision of Loss-of-Coolant Accident Mass and Energy Release Calculations Related to Containment Integrity Response Analyses28 February 2018Third Periodic Schedule Update for Revision of Loss-of-Coolant Accident Mass and Energy Release Calculations Related to Containment Integrity Response Analyses
ML18059B27428 February 2018Annual Report Form for Drug and Alcohol Tests for 2017
ML18059B25428 February 2018Single Positive Test Form Collected on 12/24/2017
ML18059B25328 February 2018Single Positive Test Form Collected on 10/07/2017
ML18059B25228 February 2018Single Positive Test Form Collected on 01/31/2017
ML18059B25128 February 2018Single Positive Test Form Collected on 06/07/2017
ML18059B25028 February 2018Single Positive Test Form Collected on 04/24/2017
ML18059B24928 February 2018Single Positive Test Form Collected on 09/13/2017
ML18059B24828 February 2018Single Positive Test Form Collected on 05/02/2017
ML18059B24728 February 2018Single Positive Test Form Collected on 03/23/2017
ML18059A14328 February 2018EOC Assessment Letter
ML18058B16327 February 2018Emailed U1 ISI 2018002 RFI - BccBoric Acid
Nondestructive Examination
Incorporated by reference
Liquid penetrant
ML18057A63723 February 2018NRR E-mail Capture - Request for Additional Information Related to TVA Fleet Topical Report TVA-NPG-AWA16 - EPIC: L-2016-TOP-0011)
CNL-18-014, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions21 February 2018Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
IR 05000327/201730115 February 2018NRC Operator License Examination Reports 05000327/2017301 and 05000328/2017301
ML18045A07714 February 2018301 Final As-Given RO Written Exam with Answer Key - Delay Release 2 YrsBoric Acid
Shutdown Margin
Post Accident Monitoring
ML18045A12314 February 2018301 Final As-Given SRO Written Exam with Answer Key - Delay Release 2 YrsBoric Acid
Shutdown Margin
Offsite Dose Calculation Manual
Post Accident Monitoring
ML18045A07114 February 2018301 Post Exam Comments
ML18045A09812 February 2018NPDES Permit No. TN0026450 - Discharge Monitoring Report (DMR) for January 2018
ML18065A4329 February 2018Email - Sequoyah Nuclear Plant, Units 1 and 2 - Request for Additional Information Related to LAR for Emergency Response Plan Staff Augmentation Times (EPIC: L-2017-LLA-0310)
CNL-18-021, Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, QPTR, and TS 3.3.1, 'Reactor Trip System (RTS)8 February 2018Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, QPTR, and TS 3.3.1, 'Reactor Trip System (RTS) ..Surveillance Frequency Control Program
NL-18-021, Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, Qptr, and TS 3.3.1, 'Reactor Trip System (RTS) .8 February 2018Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, Qptr, and TS 3.3.1, 'Reactor Trip System (RTS) ..Surveillance Frequency Control Program
IR 05000327/20170047 February 2018Nuclear Regulatory Commission Integrated Inspection Report 05000327/2017004 and 05000328/2017004Loop seal
Functionality Assessment
Condition Adverse to Quality
Operability Determination
Fire Protection Program
ML18037B0713 February 2018E-Mail Approval for Credit for Sequoyah Operational Safety Review Team to the Baseline Inspection Samples/Hours
ML18036A2131 February 2018NPDES Permit No. TN0026450 - 2017 Biocide/Corrosion Treatment Plan (B/Ctp) Annual Report
ML18078A53631 January 2018Crane Nuclear, Inc. - Interim Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem (Update)
ML18024A02524 January 2018Approval for Credit for the Sequoyah Operational Safety Review Team to the Baseline Inspection Samples/Hours
IR 05000327/201700824 January 2018NRC Design Bases Assurance Inspection (Programs) Report Number 05000327/2017008 and 05000328/2017008Significance Determination Process
Operability Determination
ML18023A20623 January 2018NRC-2016- TN4640--NRC -Sequoyah Nuclear Plant Unit 2Fukushima Dai-Ichi
ML19028A16023 January 20182018 Biocide/Corrosion Treatment Plan Annual Report
ML18019A15018 January 2018Letter Regarding Denial of a Non-Cited Violation Involving the Qualification of Class 1E Electrical Equipment and the Backfit Claim Proposing the NRC Action Constitutes a Plant-Specific BackfitBackfit
ML18018B15818 January 2018Submittal of 10CFR 50.46 30-Day ReportFuel cladding
ML18012A07711 January 2018NRR E-mail Capture - Acceptance Review: Susquehanna Units 1 and 2 License Amendment Request for TSTF-551
ML18016A68710 January 2018Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2018Generic Fundamentals Examination
ML18011A1569 January 2018NPDES Permit No. TN0026450 - Discharge Monitoring Report for December 2017