Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
PLA-7579, Property Insurance Program | 30 March 2017 | Property Insurance Program | |
PLA-7580, Guarantee of Payment of Deferred Premiums (Evidence of Financial Protection) | 30 March 2017 | Guarantee of Payment of Deferred Premiums (Evidence of Financial Protection) | |
ML17090A315 | 30 March 2017 | Guarantee of Payment of Deferred Premiums 10 CFR 140.21 | |
ML17090A304 | 30 March 2017 | Nuclear Property Insurance Program | |
ML17089A656 | 30 March 2017 | NRC Decommissioning Fund Status Report | |
PLA-7584, NRC Decommissioning Funding Status Report for 12/31/2016 | 30 March 2017 | NRC Decommissioning Funding Status Report for 12/31/2016 | |
ML17102B416 | 29 March 2017 | NRC Decommissioning Funding Status Report | |
ML17067A444 | 27 March 2017 | Issuance of Amendments Secondary Containment Access Openings | |
ML17093A668 | 27 March 2017 | Technical Requirements Manual Unit 2, Revision 93 with Revision 13 to Table of Contents | |
ML17083A193 | 24 March 2017 | Commission Memorandum and Order (CLI-17-04) | |
CAC:MF9131 | 21 March 2017 | ||
ML17081A380 | 21 March 2017 | E-mail - Multi-Licensee License Amendment Request Example | Safe Shutdown Shutdown Margin |
PLA-7583, Response to NRC Request for Supplemental Information for License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits (PLA-7583) | 21 March 2017 | Response to NRC Request for Supplemental Information for License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits (PLA-7583) | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
PLA-7577, Submittal of Unit 2 Cycle 19 Core Operating Limits Report (COLR) PLA-7577 | 16 March 2017 | Submittal of Unit 2 Cycle 19 Core Operating Limits Report (COLR) PLA-7577 | |
ML17059D214 | 6 March 2017 | Susquehanna Steam Electric Station - Supplemental Information Needed for Acceptance of Requested Licensing Action Re: License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage Frequency Limits | |
IR 05000387/2016006 | 1 March 2017 | Annual Assessment Letter for Susquehanna Units 1 and 2 Report Nos. 05000387/2016006 and 05000388/2016006 | Open Phase Condition |
ML17056B512 | 25 February 2017 | Single Positive Test Form Collected on 02/29/2016 | |
ML17056B533 | 25 February 2017 | Single Positive Test Form Collected on 10/28/2016 | |
ML17056B521 | 25 February 2017 | Single Positive Test Form Collected on 5/23/2016 | |
ML17056B529 | 25 February 2017 | Single Positive Test Form Collected on 02/29/2016 | |
ML17056B531 | 25 February 2017 | Single Positive Test Form Collected on 10/18/2016 | |
ML17056B509 | 25 February 2017 | Single Positive Test Form Collected on 5/13/2016 | |
ML17056B461 | 25 February 2017 | Single Positive Test Form Collected on 5/23/2016 | |
ML17056B506 | 25 February 2017 | Single Positive Test Form Collected on 02/16/2016 | |
ML17056B510 | 25 February 2017 | Single Positive Test Form Collected on 02/18/2016 | |
ML17056B536 | 25 February 2017 | Single Positive Test Form Collected on 5/11/2016 | |
ML17056B523 | 25 February 2017 | Single Positive Test Form Collected on 5/13/2016 | |
ML17056B507 | 25 February 2017 | Single Positive Test Form Collected on 5/23/2016 | |
ML17056B527 | 25 February 2017 | Single Positive Test Form Collected on 02/29/2016 | |
ML17056B525 | 25 February 2017 | Single Positive Test Form Collected on 02/18/2016 | |
ML17056B519 | 25 February 2017 | Single Positive Test Form Collected on 02/16/2016 | |
ML17056B534 | 25 February 2017 | Single Positive Test Form Collected on 09/06/2016 | |
ML17055C098 | 24 February 2017 | Annual Fatigue Report Form for 2016 | |
ML17055C127 | 24 February 2017 | Annual Report Form for Drug and Alcohol Tests for 2016 | |
ML17059C901 | 17 February 2017 | Technical Requirements Manual | Shutdown Margin Ultimate heat sink Post Accident Monitoring |
ML17027A196 | 15 February 2017 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief - James Danna | |
IR 05000387/2016004 | 10 February 2017 | Safe Shutdown Reactor Vessel Water Level High Radiation Area Fire Barrier Water Inventory Control Weld Overlay Enforcement Discretion Functionality Assessment Locked High Radiation Area Condition Adverse to Quality Aging Management Significance Determination Process Job Performance Measure Process Control Program Operability Determination Pressure Boundary Leakage Pressure boundary leak Power change Downpower Power Uprate | |
ML17045A608 | 9 February 2017 | Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049), PLA-7570 | FLEX Spent Fuel Pool Instrumentation |
Press Release-I-17-003, NRC Assigns New Senior Resident Inspector to Susquehanna Nuclear Power Plant | 6 February 2017 | Press Release-I-17-003: NRC Assigns New Senior Resident Inspector to Susquehanna Nuclear Power Plant | New Resident Inspector |
ML17037B850 | 6 February 2017 | 08/21/1975 Notice of Meeting with Architect Engineers of Mark II Owners to Discuss Load Combinations and Analytical Techniques for Determining Stresses in Mechanical Components and Structures of Mark II Containments | |
PLA-7444, Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To... | 1 February 2017 | Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To... | Surveillance Frequency Control Program |
ML17004A250 | 26 January 2017 | Susquehanna Steam Electric Station, Unit 2 - Issuance of Amendment Re: Temporary Change of Technical Specifications to Allow Replacement of Engineered Safeguard System Load Center Transformers. (CAC No. MF7298) | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML17017A318 | 19 January 2017 | Flood Hazard Mitigation Strategies Assessment | FLEX Fukushima Dai-Ichi Flood Hazard Mitigation Strategies Assessment |
IR 05000387/2016301 | 17 January 2017 | NRC Initial Operator Licensing Examination Report 05000387/2016301 and 05000388/2016301 | |
ML17018A282 | 17 January 2017 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 | Generic Fundamentals Examination |
PLA-7566, Submittal of Revision 60 to Emergency Plan | 9 January 2017 | Submittal of Revision 60 to Emergency Plan | Safe Shutdown Health Physics Network High winds Grab sample Offsite Dose Calculation Manual Time to boil Safe Shutdown Earthquake Operating Basis Earthquake Earthquake Fuel cladding Minimum staff Siren Power Uprate |
ML17006A386 | 5 January 2017 | FEMA - Submittal of After Action Report/Improvement Plan for Susquehanna Steam Electric Station 2016 Plume Exercise Evaluated on October 18, 2016 |