L-17-372, Response to Request for Additional Information Regarding Request to Use ASME Code Case N-513-4 (EPID 000976/05000334/L-2017-LLR-0088,000976/05000346/L-2017-LLR-0088, 000976/05000412/L-2017-LLR-0088, and 000976/05000440/L-2017-LLR-0088)23 December 2017Response to Request for Additional Information Regarding Request to Use ASME Code Case N-513-4 (EPID 000976/05000334/L-2017-LLR-0088,000976/05000346/L-2017-LLR-0088, 000976/05000412/L-2017-LLR-0088, and 000976/05000440/L-2017-LLR-0088)
IR 05000440/201700721 December 2017NRC Problem Identification and Resolution Inspection Report 05000440/2017007Safe Shutdown
Condition Adverse to Quality
Significance Determination Process
IR 05000440/201741021 December 2017NRC Security Problem Identification and Resolution Inspection Report 05000440/2017410 (Cover Letter Only)Significance Determination Process
Affidavit
L-17-247, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-36020 December 2017License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360Safe Shutdown
Anticipated operational occurrence
Surveillance Frequency Control Program
Recently irradiated fuel
ML17353A69319 December 2017NRR E-mail Capture - Acceptance for Review of Application Concerning Revisions to the Technical Specifications for Reactor Pressure Vessel Water Inventory Control (EPID L-2017-LLA-0405) (L-17-045)Water Inventory Control
ML18008A02813 December 2017NRR E-mail Capture - Draft RAI for Perry LAR to Revise TSs for AST
L-17-353, No Active Safety Function Anchor Darling Double Disc Gate Valves13 December 2017No Active Safety Function Anchor Darling Double Disc Gate ValvesAnchor Darling
ML17342B1268 December 2017Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection 05000440/2018410Cyber Security
L-17-045, Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control.6 December 2017Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control.Water Inventory Control
05000440/LER-2017-0061 December 2017Loss of Safety Function due to the Inoperability of Both Trains of Motor Control Center Ventilation
LER 17-006-00 for Perry Nuclear Power Plant Regarding Loss of Safety Function due to the Inoperability of Both Trains of Motor Control Center Ventilation
Probabilistic Risk Assessment
Large early release frequency
IR 05000440/201740527 November 2017NRC Security Baseline Inspection Report 05000440/2017405 (Cover Letter Only) (Nte)Affidavit
L-17-262, First Energy Nuclear Operating Co., Quality Assurance Program Manual, Revision 2120 November 2017First Energy Nuclear Operating Co., Quality Assurance Program Manual, Revision 21Offsite Dose Calculation Manual
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Aging Management
Process Control Program
License Renewal
Fire Protection Program
Grace period
ML17303B1587 November 2017FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information
CAC:MF94067 November 2017
ML20311A4456 November 20172017 Q1-Q4 ROP Inspection Findings
L-17-325, Readiness for Nrg Supplemental Inspection Required for a Greater than Green Finding31 October 2017Readiness for Nrg Supplemental Inspection Required for a Greater than Green FindingPreliminary White Finding
IR 05000440/201700330 October 2017NRC Integrated Inspection Report 05000440/2017003High Radiation Area
Offsite Dose Calculation Manual
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Missed surveillance
Significance Determination Process
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Operability Determination
Annual Radiological Effluent Release Report
Through-Wall Leak
Through Wall Leak
Fire Protection Program
ML17305A20323 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML17305A23023 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 09 (9.5-1 to 9.5-26)
ML17305A21223 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis
ML17305A22923 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 09 (9.1-1 to 9.4-29)
ML17305A21423 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML17305A20823 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
ML17305A23523 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 13, Figures
ML17305A23823 October 2017Technical Specification Bases, Rev. 11
ML18022A83023 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics Redacted
ML17305A22723 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 07
ML17305A22623 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 06
ML17305A22823 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 08
ML17305A22523 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 05
ML17305A23323 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 11
ML17305A23723 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 15, Figures
L-17-046, Revision 20 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection Redacted23 October 2017Revision 20 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection RedactedHigh Radiation Area
Grab sample
Anticipated operational occurrence
Safe Shutdown Earthquake
Coatings
Deep Dose Equivalent
Pressure boundary leak
ML17305A20023 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML17305A19823 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML17305A21523 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figure List, Revision 20
ML17305A22423 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 04
ML17305A23223 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 10
ML17305A21823 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 02 (2.5-47 to 2.5-49)
ML17305A19923 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 4, Reactor
ML17305A21323 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications
ML17305A21123 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program
ML17305A23123 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 09 (9A-1 to 9A-34)
ML17305A21923 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 02 (2.5-50 to 2.5-215)
ML17305A21723 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 02 (2.1-1 to 2.5-46)
ML17305A23423 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 12, Figures
ML17305A22023 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 02 (02D-1 to 02D-2)
L-17-038, Submittal of Report of Facility Changes, Tests, and Experiments23 October 2017Submittal of Report of Facility Changes, Tests, and Experiments
CAC:MF786123 October 2017
ML17305A20723 October 2017Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System