Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-17-372, Response to Request for Additional Information Regarding Request to Use ASME Code Case N-513-4 (EPID 000976/05000334/L-2017-LLR-0088,000976/05000346/L-2017-LLR-0088, 000976/05000412/L-2017-LLR-0088, and 000976/05000440/L-2017-LLR-0088) | 23 December 2017 | Response to Request for Additional Information Regarding Request to Use ASME Code Case N-513-4 (EPID 000976/05000334/L-2017-LLR-0088,000976/05000346/L-2017-LLR-0088, 000976/05000412/L-2017-LLR-0088, and 000976/05000440/L-2017-LLR-0088) | |
IR 05000440/2017007 | 21 December 2017 | NRC Problem Identification and Resolution Inspection Report 05000440/2017007 | Safe Shutdown Condition Adverse to Quality Significance Determination Process |
IR 05000440/2017410 | 21 December 2017 | NRC Security Problem Identification and Resolution Inspection Report 05000440/2017410 (Cover Letter Only) | Significance Determination Process Affidavit |
L-17-247, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 | 20 December 2017 | License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program Recently irradiated fuel |
ML17353A693 | 19 December 2017 | NRR E-mail Capture - Acceptance for Review of Application Concerning Revisions to the Technical Specifications for Reactor Pressure Vessel Water Inventory Control (EPID L-2017-LLA-0405) (L-17-045) | Water Inventory Control |
ML18008A028 | 13 December 2017 | NRR E-mail Capture - Draft RAI for Perry LAR to Revise TSs for AST | |
L-17-353, No Active Safety Function Anchor Darling Double Disc Gate Valves | 13 December 2017 | No Active Safety Function Anchor Darling Double Disc Gate Valves | Anchor Darling |
ML17342B126 | 8 December 2017 | Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection 05000440/2018410 | Cyber Security |
L-17-045, Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control. | 6 December 2017 | Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control. | Water Inventory Control |
05000440/LER-2017-006 | 1 December 2017 | Loss of Safety Function due to the Inoperability of Both Trains of Motor Control Center Ventilation LER 17-006-00 for Perry Nuclear Power Plant Regarding Loss of Safety Function due to the Inoperability of Both Trains of Motor Control Center Ventilation | Probabilistic Risk Assessment Large early release frequency |
IR 05000440/2017405 | 27 November 2017 | NRC Security Baseline Inspection Report 05000440/2017405 (Cover Letter Only) (Nte) | Affidavit |
L-17-262, First Energy Nuclear Operating Co., Quality Assurance Program Manual, Revision 21 | 20 November 2017 | First Energy Nuclear Operating Co., Quality Assurance Program Manual, Revision 21 | Offsite Dose Calculation Manual Nondestructive Examination Temporary Modification Condition Adverse to Quality Aging Management Process Control Program License Renewal Fire Protection Program Grace period |
ML17303B158 | 7 November 2017 | FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information | |
CAC:MF9406 | 7 November 2017 | ||
ML20311A445 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings | |
L-17-325, Readiness for Nrg Supplemental Inspection Required for a Greater than Green Finding | 31 October 2017 | Readiness for Nrg Supplemental Inspection Required for a Greater than Green Finding | Preliminary White Finding |
IR 05000440/2017003 | 30 October 2017 | NRC Integrated Inspection Report 05000440/2017003 | High Radiation Area Offsite Dose Calculation Manual Internal Flooding Probabilistic Risk Assessment Temporary Modification Functionality Assessment Missed surveillance Significance Determination Process Scram Discharge Volume Annual Radiological Environmental Operating Report Operability Determination Annual Radiological Effluent Release Report Through-Wall Leak Through Wall Leak Fire Protection Program |
ML17305A203 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML17305A230 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 09 (9.5-1 to 9.5-26) | |
ML17305A212 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis | |
ML17305A229 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 09 (9.1-1 to 9.4-29) | |
ML17305A214 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance | |
ML17305A208 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | |
ML17305A235 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 13, Figures | |
ML17305A238 | 23 October 2017 | Technical Specification Bases, Rev. 11 | |
ML18022A830 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics Redacted | |
ML17305A227 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 07 | |
ML17305A226 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 06 | |
ML17305A228 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 08 | |
ML17305A225 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 05 | |
ML17305A233 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 11 | |
ML17305A237 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 15, Figures | |
L-17-046, Revision 20 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection Redacted | 23 October 2017 | Revision 20 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection Redacted | High Radiation Area Grab sample Anticipated operational occurrence Safe Shutdown Earthquake Coatings Deep Dose Equivalent Pressure boundary leak |
ML17305A200 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | |
ML17305A198 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems | |
ML17305A215 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figure List, Revision 20 | |
ML17305A224 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 04 | |
ML17305A232 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 10 | |
ML17305A218 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 02 (2.5-47 to 2.5-49) | |
ML17305A199 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 4, Reactor | |
ML17305A213 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications | |
ML17305A211 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program | |
ML17305A231 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 09 (9A-1 to 9A-34) | |
ML17305A219 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 02 (2.5-50 to 2.5-215) | |
ML17305A217 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 02 (2.1-1 to 2.5-46) | |
ML17305A234 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 12, Figures | |
ML17305A220 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Figures Section 02 (02D-1 to 02D-2) | |
L-17-038, Submittal of Report of Facility Changes, Tests, and Experiments | 23 October 2017 | Submittal of Report of Facility Changes, Tests, and Experiments | |
CAC:MF7861 | 23 October 2017 | ||
ML17305A207 | 23 October 2017 | Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |