Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML16091A48731 March 2016E-mail from R.Guzman to M. Lampert 2.206 Petition - Pilgrim Emergency Planning, Petition Review Board Initial Recommendation (MF6462)
CNRO-2016-00010, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report, Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)30 March 2016Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report, Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)Decommissioning Funding Plan
Exemption Request
ML16090A23330 March 20164/13/2016 - Notice of Category 1 Public Meeting - Annual Assessment of Safety Performance at the Pilgrim Nuclear Power Station for 2015
CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))30 March 2016Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))
ML16088A20528 March 2016Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
ML16088A20428 March 2016Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template)Decommissioning Funding Plan
ML16084B01418 March 2016Comment (142) of Susan Carpenter on Behalf of Cape Downwinders on ANPR-26, 50, 73, and 140 - Regulatory Improvements for Decommissioning Power Reactors
ML16084A04418 March 2016D. Lochbaum Email Regarding NRC 95003 Inspection at Pilgrim and Control Room Temperature
ML16084A99617 March 2016Comment (127) of Susan Carpenter on Behalf of Cape Downwinders on ANPR-26, 50, 73, and 140 - Regulatory Improvements for Decommissioning Power Reactors
ML16042A29115 March 2016Issuance of Proposed Alternative Relief Request PRR-51, Relief from the Requirements of the ASME CodeIncorporated by reference
Pressure and Temperature Limits Report
CAC:MF636115 March 2016
ML16081A46815 March 2016Comment (075) of Rosanne Shapiro on ANPR-26, 50, 52, 73, and 140 - Regulatory Improvements for Decommissioning Power Reactors
ML16078A03711 March 2016Notification for Information Only - Deviations from BWRVIP-41, Rev. 3, BWRVIP-76, Rev. 1-A, BWRVIP-139-A, and BWRVIP-180, Rev.0 GuidelinesEVT-1
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
ML16071A4417 March 2016Entergy Fleet Relief Request No. RR-EN-15-1-Proposed Alternative to Use ASME Code Case N-789-1 - E-mail from G.Davant to R.Guzman - Response to Second RAI (MF6340 - MF6349)
Press Release-16-011, NRC Issues Annual Assessments for Nation'S Nuclear Plants4 March 2016Press Release-16-011: NRC Issues Annual Assessments for Nation'S Nuclear Plants
ML16008B0773 March 2016Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051High winds
Shutdown Margin
High Radiation Area
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Emergency Lighting
Locked High Radiation Area
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
B.5.b Mitigating Strategies
Earthquake
Hardened vent
Fire Protection Program
IR 05000293/20150062 March 20162015 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2015006)Spent Fuel Pool Instrumentation
ML16071A1722 March 2016Submittal of Revision 001 to the Cyber Security PlanCyber Security
IR 05000293/201600829 February 2016Supplemental Inspection Report 05000293/2016008 (Inspection Procedure 95003 Phase 'A'), January 11, 2016 Through January 15, 2016Unanalyzed Condition
Condition Adverse to Quality
Significance Determination Process
Maintenance Rule Program
Operability Assessment
ML16062A39129 February 2016LTR-16-0110 Pine Dubois, Executive Director, Jones River Watershed Association, E-mail/Letter Updated Northeastern Geospatial Research Professionals Site Maps for Pilgrim Nuclear Power Station
CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)25 February 2016Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)
ML16056A07725 February 2016Annual Fatigue Report Form for 2015
ML16055A49824 February 2016Single Positive Test Form Collected on 04/17/2015
ML16055A48324 February 2016Single Positive Test Form Collected on 03/23/2015
ML16055A49424 February 2016Single Positive Test Form Collected on 04/07/2015
ML16055A48724 February 2016Single Positive Test Form Collected on 03/30/2015
ML16055A49124 February 2016Single Positive Test Form Collected on 04/06/2015
ML16055A48124 February 2016Single Positive Test Form Collected on 02/05/2015
ML16055A49724 February 2016Single Positive Test Form Collected on 04/13/2015
ML16055A49624 February 2016Single Positive Test Form Collected on 04/10/2015
ML16055A48524 February 2016Single Positive Test Form Collected on 03/31/2015
ML16055A50524 February 2016Single Positive Test Form Collected on 11/30/2015
ML16055A48824 February 2016Single Positive Test Form Collected on 04/07/2015
ML16055A49924 February 2016Single Positive Test Form Collected on 04/22/2015
ML16055A49024 February 2016Single Positive Test Form Collected on 04/08/2015
ML16055A50424 February 2016Single Positive Test Form Collected on 07/31/2015
ML16055A48624 February 2016Single Positive Test Form Collected on 04/03/2015
ML16055A49524 February 2016Single Positive Test Form Collected on 04/09/2015
ML16055A49324 February 2016Single Positive Test Form Collected on 04/09/2015
ML16055A47924 February 2016Single Positive Test Form Collected on 01/14/2015
ML16055A47824 February 2016Annual Report Form for Drug and Alcohol Tests for 2015
ML16067A14224 February 2016Submittal of Fifth Ten-Year Interval Inservice Inspection (Isi/Iwe) Program Plan
ML16055A50224 February 2016Single Positive Test Form Collected on 07/08/2015
ML16055A50624 February 2016Single Positive Test Form Collected on 12/03/2015
ML16055A48424 February 2016Single Positive Test Form Collected on 03/23/2015
ML16055A50124 February 2016Single Positive Test Form Collected on 04/21/2015
ML16055A50324 February 2016Single Positive Test Form Collected on 07/21/2015
ML16055A48924 February 2016Single Positive Test Form Collected on 03/30/2015
ML16055A48024 February 2016Single Positive Test Form Collected on 02/05/2015