Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML16089A07129 March 2016Generic Fundamentals Examination Results for March 9, 2016Generic Fundamentals Examination
ML16081A37221 March 2016Summary of Annual Assessment Meeting with Omaha Public Power District Regarding Fort Calhoun Station 2015 PerformanceOpen House
LIC-16-0026, Emergency Planning Changes17 March 2016Emergency Planning Changes
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
ML16064A0778 March 2016Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051Spent Fuel Pool Instrumentation
ML16064A3904 March 2016Annual Report Form for Drug and Alcohol Tests for 2015
ML16064A3964 March 2016Single Positive Test Form Collected on 03/30/2015
ML16064A3884 March 2016Single Positive Test Form Collected on 08/25/2015
ML16064A3864 March 2016Single Positive Test Form Collected on 11/09/2015
ML16064A3834 March 2016Single Positive Test Form Collected on 11/09/2015
Press Release-IV-16-003, NRC to Hold Open House on March 16 for Fort Calhoun Station4 March 2016Press Release-IV-16-003: NRC to Hold Open House on March 16 for Fort Calhoun StationOpen House
ML16064A3894 March 2016Single Positive Test Form Collected on 12/15/2015
ML16064A3824 March 2016Single Positive Test Form Collected on 10/26/2015
ML16064A3954 March 2016Single Positive Test Form Collected on 03/30/2015
ML16064A3944 March 2016Single Positive Test Form Collected on 03/23/2015
ML16064A3874 March 2016Single Positive Test Form Collected on 11/17/2015
ML16064A3854 March 2016Single Positive Test Form Collected on 11/09/2015
ML16064A3844 March 2016Single Positive Test Form Collected on 11/09/2015
ML16064A3774 March 2016Single Positive Test Form Collected on 04/06/2015
ML16064A3814 March 2016Single Positive Test Form Collected on 04/30/2015
ML16064A3794 March 2016Single Positive Test Form Collected on 04/21/2015
ML16064A3924 March 2016Single Positive Test Form Collected on 02/02/2015
ML16064A3784 March 2016Single Positive Test Form Collected on 04/20/2015
ML16064A3914 March 2016Single Positive Test Form Collected on 01/07/2015
ML16064A3934 March 2016Single Positive Test Form Collected on 03/24/2015
ML16064A3764 March 2016Single Positive Test Form Collected on 04/06/2015
ML16064A3804 March 2016Single Positive Test Form Collected on 04/21/2015
LIC-16-0020, Transmittal of Annual Dose Report for 20154 March 2016Transmittal of Annual Dose Report for 2015
IR 05000285/20154022 March 2016Non-Public Security Inspection Plan for Fort Calhoun Station (NRC Physical Security Inspection Report Number 05000285/2015402)
ML16061A3012 March 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016Safe Shutdown Earthquake
Cyber Security
Surveillance Frequency Control Program
Process Control Program
Time Critical Operator Action
Exemption Request
Fuel cladding
LIC-16-0021, Emergency Planning Changes2 March 2016Emergency Planning Changes
IR 05000285/20150062 March 2016Annual Assessment Letter for Fort Calhoun Station (Report 05000285/2015006)B.5.b
Spent Fuel Pool Instrumentation
LIC-16-0010, Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events29 February 2016Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsBoric Acid
Shutdown Margin
Ultimate heat sink
Time to boil
FLEX
Fukushima Dai-Ichi
ML16060A13229 February 2016Annual Fatigue Report Form for 2015
LIC-16-0009, Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation26 February 2016Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool InstrumentationSpent Fuel Pool Instrumentation
ML16057A12326 February 2016Cy 2015 Baseline Completion
ML16057A07426 February 2016Response to Regulatory Information Summary (RIS) 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees.
ML16036A35023 February 20162/3/16 Summary of Teleconference Meeting with Omaha Public Power District to Discuss Proposed Request to Revise Table S-2, Plant Modifications Committed, for the NFPA 805 Amendment Issued 6/16/14 for Fort Calhoun Station, Unit 1
ML15307A01323 February 2016Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a DefinitionTime of Discovery
High Radiation Area
Offsite Dose Calculation Manual
Cyber Security
Locked High Radiation Area
Annual Radioactive Effluent Release Report
Process Control Program
Fire Protection Program
ML16048A02423 February 2016Request for Additional Information, License Amendment Request to Adopt Technical Specification Task Force (TSTF)-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control
ML16048A15423 February 2016Request for Additional Information, License Amendment Request, Revise Current Licensing Basis as Described in the Final Safety Analysis Report to Allow Equipment Classification Methodology from ANSI/ANS-58.14-2011
ML16041A30819 February 2016Relief Requests P-1 - LPSI and CS Pumps; P-2 - Adjusting Hydraulic Parameters Consistent W/Code Case OMN-21; G-1 - Test Frequency Consistent W/Code Case OMN-20, Fifth 10-Year Inservice Testing IntervalBoric Acid
Incorporated by reference
Power-Operated Valves
Grace period
ML16056A01419 February 2016Marsh USA, Inc. - 2016 Nuclear Liability Certificates of Insurance
ML16042A54211 February 2016NRC Confirmatory Action Letter Follow Up Inspection 05000285/2016007Coatings
Functionality Assessment
Code Reconciliation
IR 05000285/201600711 February 2016NRC Confirmatory Action Letter Follow Up Inspection 05000285/2016007Safe Shutdown
Coatings
Functionality Assessment
Aging Management
Significance Determination Process
Operability Determination
Code Reconciliation
LIC-16-0013, Ft. Calhoun, Unit 1 and ISFSI - Transmittal of 10CFR72.48 Evaluation Summary Report for January 1, 2015 Through December 31, 201510 February 2016Ft. Calhoun, Unit 1 and ISFSI - Transmittal of 10CFR72.48 Evaluation Summary Report for January 1, 2015 Through December 31, 2015
LIC-16-0017, Submittal of Emergency Planning Implementing Procedure and Index. Includes Emergency Plan Implementing Procedure Change EPIP-TSC-2, Rev 1810 February 2016Submittal of Emergency Planning Implementing Procedure and Index. Includes Emergency Plan Implementing Procedure Change EPIP-TSC-2, Rev 18
ML16054A2415 February 2016E-44108 Attachment 11 Letter from Shane M. Marik (Omaha Public Power District) to Don Shaw (Areva) for Fort Calhoun Station, Confirmation of OPPD Intent to Voluntarily Implement Proposed Areva Inc. Changes to CoC 1004 Standardized Nuhoms Sy
ML16027A0792 February 2016Meeting Slides for 2/2/16 Teleconference with Omaha Public Power District - License Amendment Request (Lar), Proposed Changes to Implementation of NFPA 805 (2001 Edition) at Fort Calhoun StationProbabilistic Risk Assessment
Large early release frequency
CAC:MF72222 February 2016