Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML16089A071 | 29 March 2016 | Generic Fundamentals Examination Results for March 9, 2016 | Generic Fundamentals Examination |
ML16081A372 | 21 March 2016 | Summary of Annual Assessment Meeting with Omaha Public Power District Regarding Fort Calhoun Station 2015 Performance | Open House |
LIC-16-0026, Emergency Planning Changes | 17 March 2016 | Emergency Planning Changes | |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
ML16064A077 | 8 March 2016 | Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 | Spent Fuel Pool Instrumentation |
ML16064A390 | 4 March 2016 | Annual Report Form for Drug and Alcohol Tests for 2015 | |
ML16064A396 | 4 March 2016 | Single Positive Test Form Collected on 03/30/2015 | |
ML16064A388 | 4 March 2016 | Single Positive Test Form Collected on 08/25/2015 | |
ML16064A386 | 4 March 2016 | Single Positive Test Form Collected on 11/09/2015 | |
ML16064A383 | 4 March 2016 | Single Positive Test Form Collected on 11/09/2015 | |
Press Release-IV-16-003, NRC to Hold Open House on March 16 for Fort Calhoun Station | 4 March 2016 | Press Release-IV-16-003: NRC to Hold Open House on March 16 for Fort Calhoun Station | Open House |
ML16064A389 | 4 March 2016 | Single Positive Test Form Collected on 12/15/2015 | |
ML16064A382 | 4 March 2016 | Single Positive Test Form Collected on 10/26/2015 | |
ML16064A395 | 4 March 2016 | Single Positive Test Form Collected on 03/30/2015 | |
ML16064A394 | 4 March 2016 | Single Positive Test Form Collected on 03/23/2015 | |
ML16064A387 | 4 March 2016 | Single Positive Test Form Collected on 11/17/2015 | |
ML16064A385 | 4 March 2016 | Single Positive Test Form Collected on 11/09/2015 | |
ML16064A384 | 4 March 2016 | Single Positive Test Form Collected on 11/09/2015 | |
ML16064A377 | 4 March 2016 | Single Positive Test Form Collected on 04/06/2015 | |
ML16064A381 | 4 March 2016 | Single Positive Test Form Collected on 04/30/2015 | |
ML16064A379 | 4 March 2016 | Single Positive Test Form Collected on 04/21/2015 | |
ML16064A392 | 4 March 2016 | Single Positive Test Form Collected on 02/02/2015 | |
ML16064A378 | 4 March 2016 | Single Positive Test Form Collected on 04/20/2015 | |
ML16064A391 | 4 March 2016 | Single Positive Test Form Collected on 01/07/2015 | |
ML16064A393 | 4 March 2016 | Single Positive Test Form Collected on 03/24/2015 | |
ML16064A376 | 4 March 2016 | Single Positive Test Form Collected on 04/06/2015 | |
ML16064A380 | 4 March 2016 | Single Positive Test Form Collected on 04/21/2015 | |
LIC-16-0020, Transmittal of Annual Dose Report for 2015 | 4 March 2016 | Transmittal of Annual Dose Report for 2015 | |
IR 05000285/2015402 | 2 March 2016 | Non-Public Security Inspection Plan for Fort Calhoun Station (NRC Physical Security Inspection Report Number 05000285/2015402) | |
ML16061A301 | 2 March 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 | Safe Shutdown Earthquake Cyber Security Surveillance Frequency Control Program Process Control Program Time Critical Operator Action Exemption Request Fuel cladding |
LIC-16-0021, Emergency Planning Changes | 2 March 2016 | Emergency Planning Changes | |
IR 05000285/2015006 | 2 March 2016 | Annual Assessment Letter for Fort Calhoun Station (Report 05000285/2015006) | B.5.b Spent Fuel Pool Instrumentation |
LIC-16-0010, Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 29 February 2016 | Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | Boric Acid Shutdown Margin Ultimate heat sink Time to boil FLEX Fukushima Dai-Ichi |
ML16060A132 | 29 February 2016 | Annual Fatigue Report Form for 2015 | |
LIC-16-0009, Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation | 26 February 2016 | Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation | Spent Fuel Pool Instrumentation |
ML16057A123 | 26 February 2016 | Cy 2015 Baseline Completion | |
ML16057A074 | 26 February 2016 | Response to Regulatory Information Summary (RIS) 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees. | |
ML16036A350 | 23 February 2016 | 2/3/16 Summary of Teleconference Meeting with Omaha Public Power District to Discuss Proposed Request to Revise Table S-2, Plant Modifications Committed, for the NFPA 805 Amendment Issued 6/16/14 for Fort Calhoun Station, Unit 1 | |
ML15307A013 | 23 February 2016 | Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition | Time of Discovery High Radiation Area Offsite Dose Calculation Manual Cyber Security Locked High Radiation Area Annual Radioactive Effluent Release Report Process Control Program Fire Protection Program |
ML16048A024 | 23 February 2016 | Request for Additional Information, License Amendment Request to Adopt Technical Specification Task Force (TSTF)-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | |
ML16048A154 | 23 February 2016 | Request for Additional Information, License Amendment Request, Revise Current Licensing Basis as Described in the Final Safety Analysis Report to Allow Equipment Classification Methodology from ANSI/ANS-58.14-2011 | |
ML16041A308 | 19 February 2016 | Relief Requests P-1 - LPSI and CS Pumps; P-2 - Adjusting Hydraulic Parameters Consistent W/Code Case OMN-21; G-1 - Test Frequency Consistent W/Code Case OMN-20, Fifth 10-Year Inservice Testing Interval | Boric Acid Incorporated by reference Power-Operated Valves Grace period |
ML16056A014 | 19 February 2016 | Marsh USA, Inc. - 2016 Nuclear Liability Certificates of Insurance | |
ML16042A542 | 11 February 2016 | NRC Confirmatory Action Letter Follow Up Inspection 05000285/2016007 | Coatings Functionality Assessment Code Reconciliation |
IR 05000285/2016007 | 11 February 2016 | NRC Confirmatory Action Letter Follow Up Inspection 05000285/2016007 | Safe Shutdown Coatings Functionality Assessment Aging Management Significance Determination Process Operability Determination Code Reconciliation |
LIC-16-0013, Ft. Calhoun, Unit 1 and ISFSI - Transmittal of 10CFR72.48 Evaluation Summary Report for January 1, 2015 Through December 31, 2015 | 10 February 2016 | Ft. Calhoun, Unit 1 and ISFSI - Transmittal of 10CFR72.48 Evaluation Summary Report for January 1, 2015 Through December 31, 2015 | |
LIC-16-0017, Submittal of Emergency Planning Implementing Procedure and Index. Includes Emergency Plan Implementing Procedure Change EPIP-TSC-2, Rev 18 | 10 February 2016 | Submittal of Emergency Planning Implementing Procedure and Index. Includes Emergency Plan Implementing Procedure Change EPIP-TSC-2, Rev 18 | |
ML16054A241 | 5 February 2016 | E-44108 Attachment 11 Letter from Shane M. Marik (Omaha Public Power District) to Don Shaw (Areva) for Fort Calhoun Station, Confirmation of OPPD Intent to Voluntarily Implement Proposed Areva Inc. Changes to CoC 1004 Standardized Nuhoms Sy | |
ML16027A079 | 2 February 2016 | Meeting Slides for 2/2/16 Teleconference with Omaha Public Power District - License Amendment Request (Lar), Proposed Changes to Implementation of NFPA 805 (2001 Edition) at Fort Calhoun Station | Probabilistic Risk Assessment Large early release frequency |
CAC:MF7222 | 2 February 2016 |