 Issue dateTitleTopic
ML11090053631 March 2011Falsification of Electronic Dosimeter Alarm Records by a Health Physics Crew Leader
L-2011-126, Response to Request for Additional Information Fourth Ten Year Interval Relief Request PR-931 March 2011Response to Request for Additional Information Fourth Ten Year Interval Relief Request PR-9
ML11087134030 March 2011Request for Additional Information Regarding Relief Request PR-9
ML11097014630 March 2011Units I and 2, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual ReportFuel cladding
TAC:ME519030 March 2011
IR 05000335/201100825 March 2011IR 05000335-11-008 and 05000389-11-008; 01/16/2011 - 02/09/2011; St. Lucie Nuclear Plant; Occupational Radiation SafetySignificance Determination Process
ML11109021624 March 2011Initial Exam 2011-301 Post Exam CommentsJob Performance Measure
ML11154008224 March 2011Initial Exam 2011-301 General CorrespondenceJob Performance Measure
L-2011-058, Duane Arnold and Point Beach, Units 1 & 2 - Status Reports Decommissioning Funding Status Report for the Listed Units23 March 2011Duane Arnold and Point Beach, Units 1 & 2 - Status Reports Decommissioning Funding Status Report for the Listed UnitsDecommissioning Funding Plan
ML11082069922 March 20113/22/11 Revised Pre-application Meeting Slides Regarding NFPA 805 License Amendment RequestInternal Flooding
Multiple Spurious Operation
L-2011-103, Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request22 March 2011Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment RequestCyber Security
Power change
ML11077034922 March 20113/22/11 PRE-Application Meeting Slides Regarding NFPA 805 License Amendment RequestInternal Flooding
Multiple Spurious Operation
L-2011-094, Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages.18 March 2011Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages.Safe Shutdown
Anticipated operational occurrence
L-2011-109, Environmental Protection Plan Report 316(b) Related Documentation18 March 2011Environmental Protection Plan Report 316(b) Related DocumentationMet Tower
L-2011-090, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Change Report18 March 2011Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Change Report
L-2011-108, Submittal of Environmental Protection Plan Report 316(b) Related Documentation18 March 2011Submittal of Environmental Protection Plan Report 316(b) Related Documentation
ML11080053618 March 2011Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages.Safe Shutdown
Anticipated operational occurrence
L-2011-094, Comment (11) of Larry Nicholson, on Behalf of NextEra Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages.18 March 2011Comment (11) of Larry Nicholson, on Behalf of NextEra Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages.Safe Shutdown
ML11075040216 March 2011Notice of Public Meeting with St. Lucie Nuclear Plant to Discuss the NRC Reactor Oversight Process Annual Assessment
L-2011-096, Nuclear Property Insurance - 10 CFR 50.54(w)(3)14 March 2011Nuclear Property Insurance - 10 CFR 50.54(w)(3)
L-2011-089, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment Request14 March 2011Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment RequestSafe Shutdown
L-2011-073, License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation11 March 2011License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage InstrumentationGrab sample
ML11056027310 March 2011Request for Additional Information, Regarding License Amendment Request for Approval of Cyber Security PlanCyber Security
ML1105906639 March 2011Acceptance for Review of License Amendment Request for Extended Power Uprate
ML1106803739 March 2011EPU - Request for Additional Information (I & C)
IR 05000335/20105039 March 2011NRC Emergency Preparedness Annual Inspection Report 05000335/2010503 and 05000389/2010503
ML1106800459 March 2011EPU - Request for Additional Information (Performance and Testing)
ML1107304008 March 2011Operator Licensing Written Examination Approval 05000335/11-301 and 0500038911-301
ML1106104277 March 2011Notice of Forthcoming Pre-Application Meeting with Florida Power & Light Company and NextEra Energy Regarding Turkey Point, Units 3 and 4, St. Lucie, Units 1 and 2, Point Beach, Units 1, and 2, and Duane Arnold
ML1106301414 March 2011Inspection/Activity Plan, Report 22
ML1106301304 March 2011Annual Assessment Letter For St. Lucie Nuclear Plant, Units 1 And 2 - (NRC Inspection Report Nos. 05000335/2011001 and 05000389/2011001)Condition Adverse to Quality
TAC:ME58273 March 2011
TAC:ME61183 March 2011
ML1106606603 March 2011Monthly Report Notes Regarding St. Lucie, Marine Turtle Removals
ML1106606583 March 2011Marine Turtle Removals St. Lucie Plant Intake Canal February 2011
ML1106606533 March 2011Monthly Turtle Removal Summary for February 2011
L-2011-075, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment Request3 March 2011Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate License Amendment RequestAnticipated operational occurrence
Hydrostatic
Finite Element Analysis
Pressure and Temperature Limits Report
Exemption Request
ML1106606613 March 2011FPL, St. Lucie Turtle Capture Summary February 2011
L-2011-066, Cycle 19 Core Operating Limits Report3 March 2011Cycle 19 Core Operating Limits ReportBoric Acid
Shutdown Margin
L-2011-064, St. Lucie, Units 1 and 2 - 2010 Annual Radioactive Effluent Release Report28 February 2011St. Lucie, Units 1 and 2 - 2010 Annual Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
L-2011-064, St. Lucie, Units 1 and 2 - Annual Radioactive Effluent Release Report - January 1, 2010 Through December 31, 201028 February 2011St. Lucie, Units 1 and 2 - Annual Radioactive Effluent Release Report - January 1, 2010 Through December 31, 2010Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
ML11067041128 February 2011St. Lucie, Units 1 and 2 - 2010 Annual Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
ML11067041528 February 2011St. Lucie, Units 1 and 2 - Annual Radioactive Effluent Release Report - January 1, 2010 Through December 31, 2010Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
L-2011-064, Annual Radioactive Effluent Release Report - January 1, 2010 Through December 31, 2010, Enclosures 2 and 3, Offsite Dose Calculation Manual Revisions28 February 2011Annual Radioactive Effluent Release Report - January 1, 2010 Through December 31, 2010, Enclosures 2 and 3, Offsite Dose Calculation Manual RevisionsGrab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML11062008526 February 2011E-mail St. Luciie Logbook Entry for 2/26/2011
ML11073030025 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix a Safety Evaluation Report ComplianceBoric Acid
Hydrostatic
Fuel cladding
ML11073030325 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5, Appendix C, Grid Stability Analysis and System Impact Study for St. Lucie Plant with Proposed EPU
ML11073030425 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix D, List of Key AcronymsEarthquake
ML11073030525 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix E, Supplement to Licensing Report Section 2.4.1 Reactor Protection, Engineered Safety Feature Actuation, and Control Systems
ML11073030725 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix G, Holtec Report No. HI-2104753, St. Lucie Unit 2 Criticality Analysis for EPU and Non-EPU