Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19059A317 | 28 February 2019 | Single Positive Test Form Collected on 09/24/2018 | |
ML19059A308 | 28 February 2019 | Single Positive Test Form Collected on 02/07/2018 | |
ML19059A309 | 28 February 2019 | Single Positive Test Form Collected on 03/26/2018 | |
ML19059A310 | 28 February 2019 | Single Positive Test Form Collected on 04/20/2018 | |
ML19059A311 | 28 February 2019 | Single Positive Test Form Collected on 04/20/2018 | |
ML19059A312 | 28 February 2019 | Single Positive Test Form Collected on 04/16/2018 | |
ML19059A313 | 28 February 2019 | Single Positive Test Form Collected on 04/24/2018 | |
ML19059A314 | 28 February 2019 | Single Positive Test Form Collected on 08/16/2018 | |
ML19059A315 | 28 February 2019 | Single Positive Test Form Collected on 09/12/2018 | |
ML19059A316 | 28 February 2019 | Single Positive Test Form Collected on 09/17/2018 | |
ML19059A318 | 28 February 2019 | Single Positive Test Form Collected on 10/08/2018 | |
ML19059A319 | 28 February 2019 | Single Positive Test Form Collected on 10/16/2018 | |
ML19059A320 | 28 February 2019 | Single Positive Test Form Collected on 10/22/2018 | |
ML19059A321 | 28 February 2019 | Single Positive Test Form Collected on 11/12/2018 | |
ML19059A322 | 28 February 2019 | Annual Fatigue Report Form for 2018 | |
ML19059A307 | 28 February 2019 | Annual Report Form for Drug and Alcohol Tests for 2018 | |
ML19058A832 | 27 February 2019 | NRR E-mail Capture - (External_Sender) FW: Oconee Letter RA-19-0116, Response to RAI | |
ML19052A004 | 26 February 2019 | Review of Steam Generator Inservice Inspection Report for Unit 3 End of Cycle 29 Refueling Outage | |
RA-19-0116, Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2017-05 | 26 February 2019 | Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2017-05 | |
RA-19-0122, Submittal of Emergency Plan Revision 2019-002 | 26 February 2019 | Submittal of Emergency Plan Revision 2019-002 | B.5.b |
ML19056A445 | 25 February 2019 | SPRA Document Requests and Initial Questions | |
ML19037A014 | 21 February 2019 | Request for Withholding Information from Public Disclosure Oconee Thermal Hydraulic Models for Standby Shutdown Facility Transient Analysis | Safe Shutdown Exclusive Use Affidavit |
RA-19-0132, Registration for Use of General License Spent Fuel Cask Numbers 153 and 154 | 21 February 2019 | Registration for Use of General License Spent Fuel Cask Numbers 153 and 154 | |
IR 05000269/2019301 | 21 February 2019 | Operator Licensing Retake Written Examination Approval 05000269/2019301, 05000270/2019301, and 05000287/2019301 | |
ML19053A498 | 20 February 2019 | Notification of Conduct of a Triennial Fire Protection Baseline Inspection- U. S. Nuclear Regulatory Commission Inspection Report Nos. 05000269/2019012, 05000270/2019012, and 05000287/2019012 | Safe Shutdown Fitness for Duty Fire Barrier Hydrostatic Probabilistic Risk Assessment Temporary Modification Emergency Lighting B.5.b Job Performance Measure Thermoset Severe Accident Management Guideline Exemption Request Maintenance Rule Program Fire Protection Program Manual Operator Action |
ML19053A562 | 19 February 2019 | NRR E-mail Capture - NRC Request for Additional Information for Oconee LAR 2018-05 (L-2018-LLA-0300) | |
RA-19-0115, Transmittal of the Duke Energy Corporation Topic Report (Duke QAPD-001-A), Amendment 44 | 18 February 2019 | Transmittal of the Duke Energy Corporation Topic Report (Duke QAPD-001-A), Amendment 44 | Safe Shutdown Fitness for Duty Offsite Dose Calculation Manual Commercial Grade Dedication Coatings Nondestructive Examination Emergency Lighting Condition Adverse to Quality Aging Management Process Control Program Stress corrosion cracking License Renewal Commercial Grade Maintenance Rule Program Fatigue Rule Fire Protection Program |
ML19050A220 | 14 February 2019 | NRR E-mail Capture - Draft NRC RAI for Oconee LAR 2018-05 | |
IR 05000269/2018004 | 13 February 2019 | Nuclear Regulatory Commission Integrated Inspection Report 5000269/2018004, 050000270/2018004, and 05000287/2018004 | Boric Acid Stroke time Internal Flooding Enforcement Discretion Fire impairment Functionality Assessment Significance Determination Process Eddy Current Testing Operability Determination Maintenance Rule Program Fire Protection Program Dissimilar Metal Weld |
ML19058A235 | 12 February 2019 | Final After Action Report for the August 14, 2018, Oconee Nuclear Station Plume Exposure Pathway Exercise | Siren |
RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) | 11 February 2019 | Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) | |
ML19043A804 | 8 February 2019 | February 2019 Requalification Program Inspection Notification Letter | |
ML19037A005 | 8 February 2019 | Regulatory Audit in Support of Review of License Amendment Request No. 2018-02 | Safe Shutdown Tornado Missile Finite Element Analysis Tornado Missile Protection TORMIS |
RA-19-0105, Emergency Plan Revision 2019-001 | 7 February 2019 | Emergency Plan Revision 2019-001 |