Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML0812304932 June 2008Issuance of Amendment No. 160, Adoption of TSTF-2, Proposed Change to Relocate Surveillance Requirement 3.8.3.6, from the Technical Specifications to a Licensee-Controlled Document
ML0812305252 June 2008Tech Spec Pages for Amendment No. 160, Adoption of Technical Specification Task Force (TSTF)-2, Relocate the 10-Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control
IR 05000458/200840122 May 2008IR 05000458-08-401, on 04/21/2008 - 04/24/2008, River Bend Station, Security Baseline Inspection - Letter OnlyAffidavit
RBG-46816, Submittal of Owner'S Activity Report Form (OAR-1) for Cycle 14, Between May 2006, and March 200821 May 2008Submittal of Owner'S Activity Report Form (OAR-1) for Cycle 14, Between May 2006, and March 2008
TAC:MD882620 May 2008
CNRO-2008-00016, Relief Requests for Third 120 Month Inservice Testing Interval20 May 2008Relief Requests for Third 120 Month Inservice Testing IntervalHydrostatic
Nondestructive Examination
VT-2
Scaffolding
RBG-46815, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems15 May 2008Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray SystemsScaffolding
ML08135005412 May 2008Assessment Followup Letter 05-12-2008
IR 05000458/20080029 May 2008IR 05000458-08-002, on January 1 Through March 29, 2008, River Bend Station, NRC Integrated Inspection ReportBoric Acid
High winds
Reactor Vessel Water Level
High Radiation Area
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Tornado-Generated Missile
Significance Determination Process
Fuel cladding
Liquid penetrant
Fire Protection Program
Press Release-IV-08-017, NRC Names New Resident Inspector at River Bend Station9 May 2008Press Release-IV-08-017: NRC Names New Resident Inspector at River Bend StationNew Resident Inspector
ML0812207358 May 2008Correction to Amendment No. 159, Revision of Required Wattage in TS 5.5.7, Ventilation Filter Testing Program for Control Room Fresh Air System Heater Tac No. MD4961)
ML0812303938 May 2008Audit of Licensee'S Regulatory Commitment Management Program for Audit Performed April 9-10, 2008Mururoa
TAC:MD74658 May 2008
ML0812801926 May 200804-29-2008 River Bend End-of-Cycle Meeting Summary
RBG-46806, Radiological Environmental Operating Report for 200730 April 2008Radiological Environmental Operating Report for 2007Grab sample
Annual Radiological Environmental Operating Report
Chernobyl
RBG-46812, Radioactive Effluent Release Report for January 1, 2007 Through December 31, 200730 April 2008Radioactive Effluent Release Report for January 1, 2007 Through December 31, 2007Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Tritium
ML08113045430 April 2008Response to Request for 3-Month Extension, Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
ML08105058729 April 2008Relief Request PRR-RBS-2007-1 for Standby Service Water Pumps for the Third 10-Year Inservice Testing IntervalIncorporated by reference
ENOC-08-00024, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(e) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G23 April 2008Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(e) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
ML08137054522 April 2008End-of-Cycle (EOC) Public Meeting Invitational Letter
Press Release-IV-08-013, NRC to Discuss 2007 Performance Assessment for River Bend Station22 April 2008Press Release-IV-08-013: NRC to Discuss 2007 Performance Assessment for River Bend Station
ML09041032215 April 2008Entergy'S Quality Assurance Program Manual, Revision 18; Effective: April 15, 2008Safe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
TAC:MD78709 April 2008
RBG-46803, Unit 1, Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, January 11, 20089 April 2008Unit 1, Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, January 11, 2008
ML0809401243 April 2008Notice of End-of-Cycle Meeting for River Bend Station