Semantic search
Jump to navigation
Jump to search
Issue date | Title | From | To | |
---|---|---|---|---|
NRC Generic Letter 1995-07 | 17 August 1995 | NRC Generic Letter 1995-007: Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves | Crutchfield D Office of Nuclear Reactor Regulation | |
ML18101B060 | 16 October 1995 | Responds to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. | Eric Simpson PSEG | Office of Information Resources Management |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | Crutchfield D Office of Nuclear Reactor Regulation | |
Information Notice 1996-08, Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve | 5 February 1996 | Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve | Crutchfield D Office of Nuclear Reactor Regulation | |
ML18101B215 | 9 February 1996 | LER 96-002-00:on 960110,motor Operated Gate Valves Found Susceptible to Pressure Locking & Thermal Binding.Caused by Noncompliance W/Gl 95-07 Requirements for Pressure Locking & Thermal Binding.Suppl Expected on 960315.W/960209 Ltr | PSEG Warren C Hassler D | Office of Information Resources Management |
ML20149K141 | 13 February 1996 | Submits Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves | Eric Simpson PSEG | Office of Information Resources Management |
ML18101B278 | 15 March 1996 | LER 96-022-01:on 960110,evaluation Determined That Motor Operated Gate Valves Susceptible to Pressure Locking & Thermal Binding.Caused by Inability to Meet GL 95-07 Criteria.Test Procedure changed.W/960318 Ltr | PSEG Warren C Hassler D | Office of Information Resources Management |
ML18102A247 | 15 July 1996 | LER 96-008-00:on 960613,failed to Meet Tech Spec Requirement While in Mode 5 for Natural Circulation.Caused by Insufficient Technical Input for Development of Controls. Revised Operating Logs for Mode 5.W/960711 Ltr | PSEG Garchow D Hassler D | Office of Information Resources Management |
ML18102A295 | 5 August 1996 | Responds to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. | PSEG Dawn Powell | Office of Information Resources Management |
ML18102A296 | 7 August 1996 | Responds to RAI Re GL 95-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves. Supersedes 960805 Ltr | PSEG Dawn Powell | Office of Information Resources Management |
Information Notice 1996-49, Thermally Induced Pressurization of Nuclear Power Facility Piping | 20 August 1996 | Thermally Induced Pressurization of Nuclear Power Facility Piping | Martin T Office of Nuclear Reactor Regulation | |
ML18102A361 | 30 August 1996 | Provides Supplemental Info to Support Response to GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. | PSEG Dawn Powell | Office of Information Resources Management |
ML18102A389 | 31 August 1996 | Monthly Operating Rept for Aug 1996 for Salem Unit 2. W/960911 Ltr | PSEG Garchow D Phillips R Heller R | Office of Information Resources Management |
ML18102A467 | 30 September 1996 | Monthly Operating Rept for Sept 1996 for Salem Unit 2. W/961014 Ltr | PSEG Garchow D Heller R | Office of Information Resources Management |
Information Notice 1997-07, Problems Identified During Generic Letter 89-10 Closeout Inspections | 6 March 1997 | Problems Identified During Generic Letter 89-10 Closeout Inspections | Martin T Office of Nuclear Reactor Regulation | |
ML18102B437 | 7 July 1997 | LER 96-008-01:on 960613,failure to Meet TS Requirements While in Mode 5 for Natural Circulation Was Noted.Caused by Insufficient Technical Input for Development of Controls. Revised Plant Operating Logs for Mode 5.W/970707 Ltr | PSEG Garchow D Bernard Thomas | Office of Information Resources Management |
ML18102B467 | 24 July 1997 | Responds to 970610 RAI Re GL 95-07, Presssure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. | PSEG Dawn Powell | Office of Information Resources Management |
ML18102B516 | 7 August 1997 | LER 97-009-00:on 970711,failure to Stroke Pump Discharge Valves for Potential Pressure Locking Concern Was Noted. Caused by Personnel Error.Revised Procedures to Address Addl Instances of CS Pump operation.W/970811 Ltr | Mel Gray PSEG Garchow D | Office of Information Resources Management |
ML18102B558 | 22 August 1997 | Forwards Response to 970610 RAI Re Util'S Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. Validated Results Re Valve Susceptability to Pressure Locking Thermal Binding,Provided | PSEG Dawn Powell | Office of Information Resources Management |
ML18107A330 | 24 May 1999 | Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves | Eric Simpson PSEG | Office of Information Resources Management |
IR 05000272/2008007 | 22 September 2008 | IR 05000272-08-007, 05000311-08-007; on 07/14/2008 - 08/08/2008; Salem Nuclear Generating Station Units 1 and 2; Component Design Bases Inspection | Doerflein L Engineering Region 1 Branch 2 | PSEG Levis W |
IR 05000272/2014007 | 27 August 2014 | IR 05000272-14-007 and 05000311-14-007; 06/23/2014 - 07/24/2014; Salem Unit Nos. 1 and 2; Component Design Bases Inspection (CDBI) | Christopher Cahill Engineering Region 1 Branch 2 | PSEG Joyce T |
ML20135H319 | 14 May 2020 | Final ASP Analysis - Salem 1 and 2 (LER 272-96-002) | NRC/RES/DRA/PRB Christopher Hunter |