Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22144A131 | 18 May 2022 | 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Featres |
ML22144A133 | 18 May 2022 | 6 to Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML20335A139 | 23 November 2020 | 5 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML20335A141 | 23 November 2020 | 5 to Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML18065A403 | 5 April 2018 | Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 301 and 190 |
ML17291A081 | 22 January 2018 | Issuance of Amendments Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (CAC Nos. MF3301 and MF3302; EPID L-2013-LLF-0001) |
ML14339A431 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 8, Electric Power |
L-13-387, Firstenergy Nuclear Operating Company Beaver Valley Power Station Units 1 and 2, NFPA 805 Transition Report. Page 284 Through Page T-42 | 30 November 2013 | Firstenergy Nuclear Operating Company Beaver Valley Power Station Units 1 and 2, NFPA 805 Transition Report. Page 284 Through Page T-42 |
L-10-275, License Amendment Request for Spent Fuel Pool Rerack | 18 October 2010 | License Amendment Request for Spent Fuel Pool Rerack |
L-09-086, License Amendment Request No. 08-027, Spent Fuel Pool Rerack | 9 April 2009 | License Amendment Request No. 08-027, Spent Fuel Pool Rerack |
ML080370172 | 15 February 2008 | Issuance of License Amendments 281 and 163 Control Room Envelope Habitibility in Accordance with Technical Specification Task Force Traveler 448 |
ML061720376 | 19 July 2006 | Safety Evaluation Related to Extended Power Uprate at Beaver Valley Power Station, Unit Nos. 1 and 2 |
L-06-094, License Amendments Request Nos. 333 and 204 | 14 June 2006 | License Amendments Request Nos. 333 and 204 |
L-05-157, License Amendment Request No. 202, Station Battery Charger Upgrade | 14 October 2005 | License Amendment Request No. 202, Station Battery Charger Upgrade |
L-02-070, License Amendment Request No. 165 Re Modification of Design Feature 5.3.1, Criticality, to Increase the New Fuel (Fresh Fuel) Storage Racks Enrichment Limit to 5.00 Weight Percent | 31 May 2002 | License Amendment Request No. 165 Re Modification of Design Feature 5.3.1, Criticality, to Increase the New Fuel (Fresh Fuel) Storage Racks Enrichment Limit to 5.00 Weight Percent |
ML20005H057 | 11 January 1990 | Forwards Justification for Continued Operation Re Recirculation Spray HX River Water Radiation Monitor Sample Lines Not Having Automatic,Remote Manual or Locked Shut Containment Isolation Valves |
ML20195E201 | 1 November 1988 | Proposed Tech Specs,Incorporating Changes Per Generic Ltr 88-12 |
ML20238A754 | 31 August 1987 | Safety Evaluation Report Related to the Operation of Beaver Valley Power Station,Unit 2.Docket No. 50-412.(Duquesne Light Company,Et Al) |
ML20237H242 | 13 August 1987 | Forwards Advance Copy of Sser 6 |
ML20214E422 | 13 May 1987 | Forwards Response to 870512 Request for Addl Info Re Rev 2 to Tech Spec Change Request 126 Concerning as-modified Shared Control Room Habitability Sys for Both Units Based on Licensing Criteria Applicable to Unit 2 |
ML20214A759 | 12 May 1987 | Forwards Request for Addl Info Re 870402 Tech Spec Amend Request 126,Rev 2 in Order to Complete Review |
ML20210C314 | 30 April 1987 | Forwards Request for Addl Info Re Confirmatory Issue 46, Fire Protection Deviations & Confirmatory Issue 46, Control Room Isolations on High Radiation Signals. Encl Provides Background Info for Telcon.No Response Required |
ML20206H557 | 7 April 1987 | Proposed Tech Specs Change 138 Re Removal of Fire Protection Requirements from Tech Specs & Placement in Plant Procedures |
ML20207L533 | 6 January 1987 | Forwards Updated FSAR Fire Protection Matl in Preparation for Upcoming NRC Fire Protection Audit.Submittal Contains Info for Resolution of SER Open Item 5 & Confirmatory Item 48c.Matl Will Be Incorporated Into Amend 14 to FSAR |
ML20212P392 | 31 August 1986 | Safety Evaluation Report Related to the Operation of Beaver Valley Power Station,Unit 2.Docket No. 50-412.(Duquesne Light Company,Et Al) |
ML20211A049 | 31 May 1986 | Safety Evaluation Report Related to the Operation of Beaver Valley Power Station,Unit 2.Docket No. 50-412.(Duquesne Light Company,Et Al) |
ML20134E272 | 7 August 1985 | Forwards Status Summaries of Open Issues,Confirmatory Issues & Commitment Issues for Final Draft Ser.Schedule for Issuance of SER Requested |
ML20127K481 | 20 June 1985 | Provides Update on Current Status of Backfit Items in Response to Util .Backfit Appeal Meeting Unnecessary |
ML20099C553 | 5 March 1985 | Forwards Response to Power Sys Branch Questions.Mechanical Responses Accepted at 850211 & 28 Meetings.Fsar Changes Will Be Incorporated in Upcoming Amend.Response to Question 430.25 Re Load Acceptance Test Revised |
ML20132C633 | 26 November 1984 | Forwards Review of Listed Appeal Issues,Including Application of GDCs 5,2 & 4 to Communication Sys & Illumination Levels in Excess of SRP Criteria |
ML20132C559 | 21 November 1984 | Forwards Draft SER Sections Which Require Rev as Result of Review of Applicant Responses to Open Items & Info in Amends 7 & 8 to Fsar.Salp Input Also Encl |
ML20107M543 | 8 November 1984 | Requests That Proposed Requirement Re Communication Sys Be Submitted to NRC Mgt & CRGR for Approval,In Accordance W/Nrr Procedure for Mgt of plant-specific Backfitting Prior to Transmittal as Licensing Requirement |
ML20132C479 | 30 October 1984 | Forwards Auxiliary Sys Branch SER Input Re All FSAR Amends Up to & Including Amend 8.Areas Listed Unresolved & Require Addl Info.Resolution of Listed Concerns Will Be Reported in Sser.Salp Evaluation Also Encl |
ML20132C459 | 22 October 1984 | Forwards Instrumentation & Control Sys Branch SER Input Re Section 7 of SRP, Instrumentation & Control. SALP Input Also Encl |
ML20106D418 | 19 October 1984 | Forwards List of Backfit Requirements Per Generic Ltr 84-08 to Assist in Preparation for Meeting Per 841005 Request.Info Covers Draft SER & SRP Items |
ML20097A164 | 7 September 1984 | Forwards Responses to Draft SER Outstanding Issues 55,63, 119 & 115.Westinghouse Owners Group Generic Mod to Provide Automatic Reactor Trip Sys Actuation of Reactor Trip Breaker Shunt Trip Attachments Will Be Implemented |
ML20132C344 | 27 July 1984 | Forwards SER on SRP Sections Re Electrical & Mechanical Items.Mechanical Open Items List & Electrical Issue Status List Encl.Salp Input Also Encl |
ML20132C338 | 26 July 1984 | Forwards Structural & Geotechnical Engineering Branch SER Re FSAR |
ML20132C310 | 17 July 1984 | Forwards Reactor Sys Branch Input to SER & Salp.Applicant Proposed Response Date for Open Issues Listed.W/O SALP Input |
ML20092P564 | 2 July 1984 | Forwards Responses to 24 of 28 Auxiliary Sys Branch Draft SER Open Items.Responses to Four Remaining Items Will Be Submitted Shortly |
ML20132C076 | 3 May 1984 | Forwards Reactor Sys Branch Input to Draft SER Re Rcs. Section 15 Will Be Forwarded by 840518 |
NRC Generic Letter 1984-01 | 5 January 1984 | NRC Generic Letter 1984-001: NRC Use of the Terms, Important to Safety and Safety Related |
ML20062A497 | 31 May 1982 | Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Interim Rept |
ML20052F659 | 30 April 1982 | Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1. |
ML20003C092 | 31 January 1981 | Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Interim Preliminary Rept |
ML19341B374 | 31 December 1980 | Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Rept |