ML22144A13118 May 20226 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Featres
ML22144A13318 May 20226 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML20335A13923 November 20205 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML20335A14123 November 20205 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML18065A4035 April 2018Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 301 and 190
ML17291A08122 January 2018Issuance of Amendments Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (CAC Nos. MF3301 and MF3302; EPID L-2013-LLF-0001)
ML14339A43124 November 2014Updated Final Safety Analysis Report, Revision 21, Section 8, Electric Power
L-13-387, Firstenergy Nuclear Operating Company Beaver Valley Power Station Units 1 and 2, NFPA 805 Transition Report. Page 284 Through Page T-4230 November 2013Firstenergy Nuclear Operating Company Beaver Valley Power Station Units 1 and 2, NFPA 805 Transition Report. Page 284 Through Page T-42
L-10-275, License Amendment Request for Spent Fuel Pool Rerack18 October 2010License Amendment Request for Spent Fuel Pool Rerack
L-09-086, License Amendment Request No. 08-027, Spent Fuel Pool Rerack9 April 2009License Amendment Request No. 08-027, Spent Fuel Pool Rerack
ML08037017215 February 2008Issuance of License Amendments 281 and 163 Control Room Envelope Habitibility in Accordance with Technical Specification Task Force Traveler 448
ML06172037619 July 2006Safety Evaluation Related to Extended Power Uprate at Beaver Valley Power Station, Unit Nos. 1 and 2
L-06-094, License Amendments Request Nos. 333 and 20414 June 2006License Amendments Request Nos. 333 and 204
L-05-157, License Amendment Request No. 202, Station Battery Charger Upgrade14 October 2005License Amendment Request No. 202, Station Battery Charger Upgrade
L-02-070, License Amendment Request No. 165 Re Modification of Design Feature 5.3.1, Criticality, to Increase the New Fuel (Fresh Fuel) Storage Racks Enrichment Limit to 5.00 Weight Percent31 May 2002License Amendment Request No. 165 Re Modification of Design Feature 5.3.1, Criticality, to Increase the New Fuel (Fresh Fuel) Storage Racks Enrichment Limit to 5.00 Weight Percent
ML20005H05711 January 1990Forwards Justification for Continued Operation Re Recirculation Spray HX River Water Radiation Monitor Sample Lines Not Having Automatic,Remote Manual or Locked Shut Containment Isolation Valves
ML20195E2011 November 1988Proposed Tech Specs,Incorporating Changes Per Generic Ltr 88-12
ML20238A75431 August 1987Safety Evaluation Report Related to the Operation of Beaver Valley Power Station,Unit 2.Docket No. 50-412.(Duquesne Light Company,Et Al)
ML20237H24213 August 1987Forwards Advance Copy of Sser 6
ML20214E42213 May 1987Forwards Response to 870512 Request for Addl Info Re Rev 2 to Tech Spec Change Request 126 Concerning as-modified Shared Control Room Habitability Sys for Both Units Based on Licensing Criteria Applicable to Unit 2
ML20214A75912 May 1987Forwards Request for Addl Info Re 870402 Tech Spec Amend Request 126,Rev 2 in Order to Complete Review
ML20210C31430 April 1987Forwards Request for Addl Info Re Confirmatory Issue 46, Fire Protection Deviations & Confirmatory Issue 46, Control Room Isolations on High Radiation Signals. Encl Provides Background Info for Telcon.No Response Required
ML20206H5577 April 1987Proposed Tech Specs Change 138 Re Removal of Fire Protection Requirements from Tech Specs & Placement in Plant Procedures
ML20207L5336 January 1987Forwards Updated FSAR Fire Protection Matl in Preparation for Upcoming NRC Fire Protection Audit.Submittal Contains Info for Resolution of SER Open Item 5 & Confirmatory Item 48c.Matl Will Be Incorporated Into Amend 14 to FSAR
ML20212P39231 August 1986Safety Evaluation Report Related to the Operation of Beaver Valley Power Station,Unit 2.Docket No. 50-412.(Duquesne Light Company,Et Al)
ML20211A04931 May 1986Safety Evaluation Report Related to the Operation of Beaver Valley Power Station,Unit 2.Docket No. 50-412.(Duquesne Light Company,Et Al)
ML20134E2727 August 1985Forwards Status Summaries of Open Issues,Confirmatory Issues & Commitment Issues for Final Draft Ser.Schedule for Issuance of SER Requested
ML20127K48120 June 1985Provides Update on Current Status of Backfit Items in Response to Util .Backfit Appeal Meeting Unnecessary
ML20099C5535 March 1985Forwards Response to Power Sys Branch Questions.Mechanical Responses Accepted at 850211 & 28 Meetings.Fsar Changes Will Be Incorporated in Upcoming Amend.Response to Question 430.25 Re Load Acceptance Test Revised
ML20132C63326 November 1984Forwards Review of Listed Appeal Issues,Including Application of GDCs 5,2 & 4 to Communication Sys & Illumination Levels in Excess of SRP Criteria
ML20132C55921 November 1984Forwards Draft SER Sections Which Require Rev as Result of Review of Applicant Responses to Open Items & Info in Amends 7 & 8 to Fsar.Salp Input Also Encl
ML20107M5438 November 1984Requests That Proposed Requirement Re Communication Sys Be Submitted to NRC Mgt & CRGR for Approval,In Accordance W/Nrr Procedure for Mgt of plant-specific Backfitting Prior to Transmittal as Licensing Requirement
ML20132C47930 October 1984Forwards Auxiliary Sys Branch SER Input Re All FSAR Amends Up to & Including Amend 8.Areas Listed Unresolved & Require Addl Info.Resolution of Listed Concerns Will Be Reported in Sser.Salp Evaluation Also Encl
ML20132C45922 October 1984Forwards Instrumentation & Control Sys Branch SER Input Re Section 7 of SRP, Instrumentation & Control. SALP Input Also Encl
ML20106D41819 October 1984Forwards List of Backfit Requirements Per Generic Ltr 84-08 to Assist in Preparation for Meeting Per 841005 Request.Info Covers Draft SER & SRP Items
ML20097A1647 September 1984Forwards Responses to Draft SER Outstanding Issues 55,63, 119 & 115.Westinghouse Owners Group Generic Mod to Provide Automatic Reactor Trip Sys Actuation of Reactor Trip Breaker Shunt Trip Attachments Will Be Implemented
ML20132C34427 July 1984Forwards SER on SRP Sections Re Electrical & Mechanical Items.Mechanical Open Items List & Electrical Issue Status List Encl.Salp Input Also Encl
ML20132C33826 July 1984Forwards Structural & Geotechnical Engineering Branch SER Re FSAR
ML20132C31017 July 1984Forwards Reactor Sys Branch Input to SER & Salp.Applicant Proposed Response Date for Open Issues Listed.W/O SALP Input
ML20092P5642 July 1984Forwards Responses to 24 of 28 Auxiliary Sys Branch Draft SER Open Items.Responses to Four Remaining Items Will Be Submitted Shortly
ML20132C0763 May 1984Forwards Reactor Sys Branch Input to Draft SER Re Rcs. Section 15 Will Be Forwarded by 840518
NRC Generic Letter 1984-015 January 1984NRC Generic Letter 1984-001: NRC Use of the Terms, Important to Safety and Safety Related
ML20062A49731 May 1982Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Interim Rept
ML20052F65930 April 1982Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1.
ML20003C09231 January 1981Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Interim Preliminary Rept
ML19341B37431 December 1980Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Rept