ML20106D418

From kanterella
Jump to navigation Jump to search
Forwards List of Backfit Requirements Per Generic Ltr 84-08 to Assist in Preparation for Meeting Per 841005 Request.Info Covers Draft SER & SRP Items
ML20106D418
Person / Time
Site: Beaver Valley
Issue date: 10/19/1984
From: Kurtz E
DUQUESNE LIGHT CO.
To: Novak T
Office of Nuclear Reactor Regulation
References
2NRC-4-172, GL-84-08, GL-84-8, NUDOCS 8410250135
Download: ML20106D418 (2)


Text

v--

$VL

~7g Duquesm Lidit 2NRg,g2 (4f 2) 923-1960 Nuclear Construction Division Telecopy (412) 737-2629 Rob!nson Plaza, Building 2. Suite 210 Pittst:urgh, PA 1520s October 19, 1984 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Mr. Thomas H. Novak Assistant Director for Licensing Office of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docke t No. 5 0-412 Backfit Requirements Meeting Gentlemen:

The attached list of backfit requirements is provided to assist in your preparation for a meeting requested by you on October 5, 1984.

This list contains all remaining subjects knowa to DLC at this time which have not as yet be en formally identified as backfits.

We are available to discuss these on October 24, 1984, however if pu prefer an earlier date, feel free to contact me at (412) 923-1960.

DUQUESNE LIGHT COMPANY By

/

E. F. Ktyf tz, Jr

/

Manager Regu ory Af fairs GLB/wjs At t achme nt cc:

Mr. S. Chestnut, Technical Assistant (w/a)

Mr. D. G. Eisenhut, Director (w/a)

Mr. G. W. Knighton, Chief (w/a)

Ms. M. Ley, Project Manager (w/a)

I Mr. J. Tourte11otte, Chairman RRTF (w/a)

V i'

L i

8410250135 841019 PDR ADOCK 05000412 A

PDR

lb-i

i U

=,:

ATTACHMENT Potential Subjects: for Implementation of Generic Letter 84-08

~

Subject Reference 1.

NUREG 1021 and Cross-training DSER 13.2.1.2 not described in SRP.

SRP 13.2

2. - Use of the most conservative straight DSER 2.3.4 line in plotting X/Q versus probability August 15, 19 94, telecon of being exceeded as opposed to the between DLC and NRC-AEB and:

smooth curve specified in R.G.1.145.

METB 3.

Application of GDC5 to communications DSER 9.5.2.1 systems 4.

' Application of GDC2 and GDC4 to DSER 9.5.2.1 communciations system

5. - Application of GDC4 to lighting system DSER 9.5.3 E6.

Illumination levels in excess of SRP DSER.9.5.3 criteria 7.

Algae detection and treatmeat;beyond DSER 9.5.4.2 R.G.1.137 and 3RP 9.5.4 8.

Application of R.G. 1.26 to areas DSER 9.5.4-9.5.8 excluded by R.G. 1.26 9.

Application of double failure criterion DSER 9.5.4-9.5.8

. contrary - to GDC17 and BTP ASB 3-1

10. Fuel oil sediment. control beyond R.G.

DSER 9.5.4.2 1.137 guidance

- -.. _ - - - -. -. _,