Semantic search
Jump to navigation
Jump to search
Issue date | Site | Title | |
---|---|---|---|
ML22256A017 | 22 September 2022 | Summary of the August 24, 2022 Higher Burnup Workshop | |
ML22249A002 | 16 September 2022 | Summary of Pre-Submittal, Partially Closed Meeting with the Electric Power Research Institute Regarding the Use of the Alternate Licensing Strategy to Address LOCA Induced Fuel Fragmentation, Relocation, and Dispersal | |
ML22238A064 | 25 August 2022 | NRR E-mail Capture - Action: Opportunity to Review and Comment on an NRC Information Collection, Scheduling Information for the Licensing of Accident Tolerant, Higher Burnup, and Increased Enrichment Fuels (3150-XXXX) | |
ML22213A269 | 1 August 2022 | Farley | NRR E-mail Capture - Joseph M. Farley Nuclear Plant Units 1 and 2 - Acceptance of Requested Licensing Action Revise Technical Specification 3.4.10, Pressurizer Safety Valves |
ML22210A053 | 29 July 2022 | Hatch | Project Manager Assignment |
ML22196A197 | 28 July 2022 | North Anna | Request for Relief Request N2-I4-LMT-004 Inservice Inspection Limitations |
ML22172A214 | 11 July 2022 | Farley | June 16, 2022, Summary of Public Meeting with Southern Nuclear Operating Company, Inc., a Proposed License Amendment Request to Modify the Technical Specifications Regarding Pressurizer Safety Valve Setpoints at the Joseph M. Farley Nuclear |
ML22123A178 | 3 May 2022 | Farley | NRR E-mail Capture - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program |
ML22123A180 | 3 May 2022 | Farley | NRR E-mail Capture - Correction - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program |
ML22112A089 | 22 April 2022 | Farley | NRR E-mail Capture - Draft RAIs for Farley LAR Re. TS 5.5.17 |
ML22060A189 | 15 March 2022 | Farley | Correction to TS Pg 3.6.6-4 During Issuance of Amendment Nos. 225 and 222 |
ML22032A243 | 7 March 2022 | Farley | Issuance of Amendment Nos. 241 and 238 to Eliminate the Encapsulation Vessels Around the First Containment Spray and Residual Heat Removal / Low Head Safety Injection Recirculation Suction Isolation Valves |
ML22047A227 | 18 February 2022 | Farley | Dam Inspection Cover Letter (Public - Redacted) |
ML22010A240 | 10 January 2022 | Farley | NRR E-mail Capture - Farley 1 and 2 - Acceptance of Requested Licensing Action Revise TS 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure |
ML21319A262 | 28 December 2021 | Summer | Issuance of Amendment No. 220 to Relocate Unit Staff Qualifications from Technical Specification to Quality Assurance Program Description |
ML21321A377 | 16 November 2021 | Farley | NRR E-mail Capture - RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal |
ML21321A375 | 10 November 2021 | Farley | NRR E-mail Capture - Draft RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal |
ML21288A331 | 4 November 2021 | Farley | Summary of October 14, 2021, Public Meeting with SNC, Inc., Regarding Proposed LAR to Modify the TSs to Increase Containment Peak Pressure to Address Several Nuclear Safety Advisory Letters L-2021-LRM-0097 |
ML21273A009 | 29 September 2021 | Oconee | NRR E-mail Capture - Oconee Nuclear Station, Units 1, 2, and 3 - Acceptance of Requested Licensing Action Revise Technical Specification 3.7.7, Low Pressure Service Water |
ML21260A161 | 24 September 2021 | Farley | Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML21236A314 | 24 August 2021 | Farley | NRR E-mail Capture - Joseph M. Farley Nuclear Plant Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Remove Sump Recirculation Valve Encapsulation |
ML21216A316 | 23 August 2021 | Farley | Closeout of Bulletin 2012-01, Design Vulnerability in Electric Power System |
ML21218A058 | 10 August 2021 | Farley | Correction to Issuance of Amendment Nos. 230 and 231 (Epids L-2020-LLA-0134 and L-2020-LLA-0232) |
ML21137A247 | 30 June 2021 | Farley | Issuance of Amendment Nos. 233 and 230, Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components |
ML21173A178 | 22 June 2021 | Summer | NRR E-mail Capture - Acceptance Review - Summer LAR Unit Staff Qualification Relocation TS to Quality Assurance Program Description (QAPD) |
ML21105A013 | 14 April 2021 | Hatch Vogtle Farley | NRR E-mail Capture - Acceptance Review - SNC Fleet LAR to Change TS 5.7, High Radiation Area (L-2021-LLA-0052) |
ML21020A132 | 19 January 2021 | Surry | NRR E-mail Capture - RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) |
ML21020A133 | 13 January 2021 | Surry | NRR E-mail Capture - Draft RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) |
ML21012A324 | 12 January 2021 | Farley | NRR E-mail Capture - Request for Additional Information - Farley, 1 and 2 - Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors |
ML20351A404 | 16 December 2020 | Farley | NRR E-mail Capture - Draft RAIs for Farley 50.69 (ML20170B114) |
ML20316A019 | 10 November 2020 | Surry | NRR E-mail Capture - Surry Unit 1 Proposed Alternative S1-I5-ISl-05 |
ML20316A020 | 10 November 2020 | Surry | NRR E-mail Capture - Surry Unit 2 Proposed Alternative S2-I5-ISl-06 |
ML20289A115 | 9 October 2020 | Farley | NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Acceptance of Requested Licensing Action Request for One-Time Exemption from 10 CFR 50, Appx E, Biennial EP Exercise Requirements Due to COVID-19 Pandemic |
ML20199M257 | 17 July 2020 | Farley | NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Acceptance of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors |