Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
ML22168A16123 June 2022NRC Presentations for the 30th Annual NUPIC Vendor Conference
ML22038A9607 February 2022Nuclear Regulatory Commission February 2022 EPRI Joint Utility Task Group Presentation
ML21231A29817 August 2021Nuclear Regulatory Commission Aug 2021 EPRI Joint Utility Task Group Virtual Presentation
ML21155A0224 June 2021Audit Plan for the Remote Audit of Argonne National Laboratory
ML19226A36919 August 201999901476L&S Machine Company, Response to the U.S. Nuclear Regulatory Commission Inspection Report No. 99901476/2019-201 and Notice of Nonconformance
ML19056A41922 February 2019Nuclear Regulatory Commission February 2018 EPRI Joint Utility Task Group Presentation
ML18150A36430 May 2018Vendors' Safety Culture (Paul Prescott)
ML17338A07230 April 2018Regulatory Guide (RG)1.234, Rev. 0, Evaluating Deviations and Reporting Defects and Noncompliance Under 10 CFR Part 21
ML1115400353 June 2011University of Missouri-ColumbiaAcceptance of Route Approval Application from University of Missouri to DOE Savannah River Site, NRC Routes No. 182C
PNO-III-99-024, on 990416,licensee Commenced Controlled Power Reduction to Approx 10% to Identify & Repair Main Generator Field Ground.Troubleshooting Efforts Are Still in Progress. Ris Monitored SD & Troubleshooting & Will Review Activities19 April 1999Duane ArnoldPNO-III-99-024:on 990416,licensee Commenced Controlled Power Reduction to Approx 10% to Identify & Repair Main Generator Field Ground.Troubleshooting Efforts Are Still in Progress. Ris Monitored SD & Troubleshooting & Will Review Activities
PNO-III-99-020, on 990409,Unit 2 Had Been Shut Down Since Sept 1996 for Refueling Outage That Was Extended in Order to Address Extensive Equipment Condition.Util Completed Comprehensive Corrective Action Program13 April 1999LaSallePNO-III-99-020:on 990409,Unit 2 Had Been Shut Down Since Sept 1996 for Refueling Outage That Was Extended in Order to Address Extensive Equipment Condition.Util Completed Comprehensive Corrective Action Program
ML20134H0744 November 1996MillstoneComments on Stakeholder Input for DSI-11, Strategic Assessment Issue Paper Response for Operating Reactor Program Oversight
ML20154G86416 September 1988Wolf CreekInsp Rept 50-482/88-200 on 880606-17.Potential Enforcement Findings & Observations Noted.Major Areas Inspected:Line Organization Support & Contribution to Plant Quality & Quality Verification Organization Abilities Re Deficiencies
IR 05000285/198702217 December 1987Fort CalhounInsp Rept 50-285/87-22 on 870817-21.Major Areas Inspected: Maint & Testing Records,Insp & Testing Procedures,Valve Location & Sys Drawings
ML20237B35814 December 1987Insp Rept 99900317/87-02 on 871005-09.Violations, Nonconformances & Unresolved Item Noted.Major Areas Inspected:Several Recent 10CFR21 & 10CFR50.55(e) Repts Re Cooper Standby Diesel Generators
ML20235K32825 September 1987Insp Rept 99900300/87-01 on 870727-31.No Violations & Noncompliance Noted.Major Areas Inspected:Part 21 Rept Issued Re Potential Overspeed Problem on Colt Series PC-2 Engine & Main Bearing Failures in Late 1985 & Early 1986
ML20237G01111 August 1987Summarizes 870723 Conference Call Re Emergency Diesel Generators.Topics Discussed Include Comparison of Vendor Engine Failures W/Other Diesel Mfg in Industry.Vendor Branch Should Perform Insp at Vendor Facility
ML20235F87030 June 1987Insp Rept 99900317/87-01 on 870330-0403.Major Areas Inspected:Exam of Procedures & Representative Records, Interviews W/Personnel & Observations by Inspector Due to Two 10CFR50.55(e) Repts Re Standby Diesel Generators
IR 05000245/198700922 June 1987MillstoneInsp Rept 50-245/87-09 on 870420-24.Potential Enforcement Findings Noted:Failure to Make Repts to NRC Per 10CFR50.72 & 50.73,to Take Corrective Action Per 10CFR50,App B,Xvi & to Control Testing Procedures Per 10CFR50,App B,Vi