I
[o UNITED STATES g
8 NUCLEAR REGULATORY COMMISSION x.
g 7;
- E WASHINCTON, D. C. 20555
\\*****/
August 11, 1987 Docket No. 99900317
?
NOTE TO:
Ellis W. Nerschoff, Acting Chief l
Vendor Inspection Branch l
Division of Reactor Inspection and Safeguards i
THROUGH:
James C. Stone, Chief Program Development and Reactive Inspection Section Vendor Inspection Branch Division of Reactor Inspection and Safeguards FROM:
Peter J. Prescott Program Development and Reactive Inspection Section Vendor Inspection Branch Division of Reactor Inspection and Safeguards
SUBJECT:
PALO VERDE EDG CONFERENCE CALL ON JULY 23, 1987 Topics Discussed:
1.
Cooper engine failures as compared with others diesel manufactures in the nuclear industry.
2.
Specific EDG programs at Palo Verde Unit III a.
Bearing problems b.
- 2 journal problems c.
Turbo eutectic d.
Crank case explosion 3.
Are Palo Verde's problems field related or do they stem from a poor Q.A.
program at the Vendor (Cooper).
4.
Should the Vendor Branch perform inspections at Cooper or Palo Verde (or both).
Results/ Commitments:
1.
Vendor Branch should perform an inspection first at Cooper (September time frame) focusing on the following:
a.
Cooper's QA program b.
,Palo Verde's Unit 3 diesel (design criteria) c.
Cooper's field installation procedures d.,
Specific Cooper problems in the industry which may be generic e.
Component manufacturing process 9709130273 870811 Igf/
PDR G A999 EMVCOIN 99900317 PDR
m 4-lY Ellis'W. Merschoff: August 11, 1987
'2.
, Proposed Inspection Team:.
q a.
P. Prescott I
b.
E. Tomlinson J. Conway c.
. Region V Inspector d.
e.
Consultant with strong design background
-3.-
Possible Follow-up Inspection at'Palo Verde to' Review:
a.
Licensee QA program
,c
.b.
Field installation procedures c.
Work order packages d.
Vendor licensee interface (at site) e.
Maintenance procedures f.
Test procedures 4.
Other Comments:
a.'
No urgent need for; task. force team as yet b.
Cooper has a limited history in the nuclear industry which could lead to incorrect assumptions concerning their failure-data (HUREG 4440) t ff W
l Peter J. Prescott Program Development and Reactive Inspection Section.
Vendor Inspection Branch Division of Reactor Inspecticn and Safeguards cc:
R. Pate, RV E. Tomlinson, NRR/PD4 T. Sullivan, NRR J. Rajan, NRR l
\\
i i
i d
1 J.arma msman
I Ellis W. l%rschoff August 11, 1987 2.
Proposed Inspection Team:
a.
P. Prescott b.
E. Tomlinson c.
J. Conway i
d.
Region V Inspector i
e.
Consultant with strong design background l
3.
Possible Follow-up Inspection at Palo Verde to Review:
a.
Licensee QA program b.
Field installation procedures c.
Work order packages d.
Vender licensee interface (at site) e.
Maintenance procedures f.
Tert procedures 4.
Other Comments:
a.
No urgent need for task force team as yet b.
Cooper has a limited history in the nuclear industry which could lead to incorrect assumptions concerning their failure data (NOREG 4440)
W7 Peter J. Prescott Program Developmer+ and Reactive Inspection Section Vendor Inspection Branch Division of Reactor Inspection and Safeguards cc:
R. Pate, RV E. Tomiiason, NRR/PD4 T. Su llivan, NRR J. Rajan, NRR DIST_RIBUTION:
L MD5 Code IC:09 VIB Reading DRIS Reading EMerschoff f,+ oq JStone j
PPrescott r
OFC :VIB:DRIS
- 5C/ B:
.IS
..... :.. _ _ _........g.. f
_7 NAME :PPrescott:ttO fJS one DATE :(/7/87
- 8 2/67
1 q.
e
.E111s'W. Merschoff. August 11, 1987
'. 2.
Proposed: Inspection Team:
-a.
P. Prescott-b.
E. Tomlinson c.
J.:Conway Region V Inspector e.
Consultant with strong design background 3.
Possible' Follow-up Inspection at Palo Verde to' Review:
a.
Licensee QA program b.
Field' installation procedures c.-
Work order packages d.
Vendor. licensee interface (at site)
.e.
Maintenance procedures f.
. Test procedures 4.
Other Comments:
a..
.No urgent need for task force team as yet b.
Cooper has a limited history in the' nuclear industry which could lead to incorrect' assumptions concerning their failure data (N.UREG 4440) p [_
Peter J. Prescott Program Development and Reactive Inspection Section Vendor Inspection Branch Division of Reactor Inspection and Safeguards cc:
R. Pate,-RV E. Tomlinson, NRR/PD4
.T. Sullivan, NRR J. Rajan NRR DISTRIBUTION:
RID 5 Code IE:09 VIB Reading-DRIS Reading EMerschoff j
JStone PPrescott
~