ML0909200929 April 2009GinnaRequest for Extension of Submittal of Reactor Vessel Material Surveillance Capsules Report R.E. Ginna Nuclear Power Plant
ML0909200778 April 2009Calvert CliffsSafety Evaluation for Relief Requests ISI-020 & 021 Reactor Vessel Weld Examination Extension - Calvert Cliffs Nuclear Power Plant, Unit No. 2 (TAC Nos. MD9773 and MD9774)
ML0907100081 April 2009FitzPatrickRequest for Alternative Jaf RR-7, Rev 1 to Install a Weld Overlay on N2C Nozzle to Recirculation Inlet Piping Safe-end Dissimilar Metal Weld
ML09070025524 March 2009Beaver ValleyRelief Request No. 1 - TYP-3-IWB-2412 Regarding the Third 10-Year Interval Inservice Inspection Plan
ML09054042311 March 2009GinnaRelief Requests Nos. 20 and 21 Request to Extend the Fourth 10-Year Inservice Inspection Program Interval - R. E. Ginna Nuclear Power Plant (TAC Nos. MD8734 and MD8735)
ML09058029510 March 2009GinnaFourth Interval Inservice Testing Program Relief Request No. VR-14 R. E. Ginna Nuclear Power Plant
ML09033030017 February 2009GinnaForth Interval Inservice Inspection Program Relief Request No. 19 - Deferral of Reactor Pressure Vessel Category B-F Exams from 2009 to 2011-R. E. Ginna Nuclear Power Plant
ML09028028212 February 2009Calvert CliffsRelief Request PT-3-01 on End-Of-Interval System Pressure Test for Class 1 Components-Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2
ML0835107408 January 2009SusquehannaRequest for Relief from the Requirements of the ASME OM Code
ML08350003929 December 2008Nine Mile PointSafety Evaluation of Relief Requests for Fourth and Third 10-Year Pump and Valve IST Program
ML0831904941 December 2008Nine Mile PointRelief Request 2ISI-007 and 2ISI-009 for Third 10-Year ISI Interval
ML08295044227 October 2008Calvert Cliffs
Nine Mile Point
Ginna
Request for Additional Information Increased Ownership of Constellation Energy Group, Inc. by Electricite DE France-Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, R.E. Ginna Nuclear Power Plant, Nine Mile Point (TAC Nos. MD9634-MD96
ML08291023323 October 2008Calvert Cliffs
Nine Mile Point
Ginna
Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
ML08255003622 September 2008Calvert CliffsY020080163 - Board of County Commissioner for Calvert County, Maryland Letter Forwarded Regarding the Feasibility of a Trash Burning Facility in Southern Maryland
ML08255031515 September 2008Beaver ValleyGeneric Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Proposed Alternative Course of Action (TAC MD7795 and 7796)
ML08207012027 August 2008PilgrimFourth 10-Year Interval Inservice Inspection Program Plan Request for Relief No. PR-03, Revision 3- Pilgrim Nuclear Power Station
ML0816802164 August 2008Calvert CliffsGeneric Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray System, Proposed Alternative Course of Action
ML08130041527 June 2008PilgrimThird 10-Year Interval Inspection Program Plan Request for Relief No. PRR-42, Revision 1
ML08141007018 June 2008Calvert CliffsRelief Requests for the Fourth 10-Year Interval Inservice Testing Program for Pumps and Valves (TAC Nos. MD5998 to MD6018)
ML08102035318 June 2008Calvert CliffsThird 10 Year Internal Inservice Inspection Request for Relief Nos. ISI-08 and ISI-14
ML08130040827 May 2008PilgrimRelief Request No. RV-07, Alternate to the ASME OM Code 5-Year Test Interval for Main Steam Safety Relief Valves - Pilgrim Nuclear Power Station
ML08136057420 May 2008Nine Mile PointCorrection to Safety Evaluation Use of the 1995 ASME Code and Perform Flaw Evaluation of Recirculation Inlet Nozzle-to-Safe End Weld
ML0812000015 May 2008Nine Mile PointUse of the 1995 ASME Code and Perform Flaw Evaluation of the Recirculation Inlet Nozzle-to-Safe End Weld Indication (TAC Nos. MD5700 and MD5709)
ML08039022313 March 2008FitzPatrickRelief Request No. 5, Use of Performance Demonstration Initiative in Lieu of ASME Code Section XI, Appendix Viii, Supplement 11 Requirement
ML08030030728 February 2008FitzPatrickRelief Request No. RR-6, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals Components Inspection
ML08037008025 February 2008FitzPatrickRelief Request No. 2 (RR-2) from the Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Appendix Viii, Supplement 10
ML08042042722 February 2008FitzPatrickRelief Request No. 3 (RR-3) Risk-Informed Inservice Inservice Inspection Program
ML08050016921 February 2008FitzPatrickProject Manager Reassignment - James A. FitzPatrick Nuclear Power Plant
ML08039013321 February 2008Susquehanna(SSES 1 and 2) - Project Manager Reassignment
ML08036028121 February 2008Nine Mile PointProject Manager Reassignment
ML08044015120 February 2008SusquehannaThird 10-Year Inservice Inspection Interval Program Relief Request No. 3RR-14
ML08014029914 February 2008Beaver ValleyRelief Request Nos. PRR1, PRR2, PRR3, PRR5, PRR6, PRR7, PRR8, PRR9, and VRR1 Regarding the Third 10-Year Inservice Testing Program Relief Requests
ML07353047731 January 2008Vermont YankeeRelief Request No. ISI-PT-01, Alternate Pressure Testing for Buried Piping Components, Fourth Inservice Inspection Interval
ML07320045520 December 2007Calvert CliffsLicense Amendment, Amendment Use of Lead Fuel Assemblies & Change to Core Operating Limits Report Analytical Methods (TAC Nos. MD4646, MD4647, MD4648, & MD4649)
ML07291042227 November 2007FitzPatrickRelief Requests for the Fourth Interval Inservice Testing Program (TAC Nos. MD5396, MD5398, MD5399, MD5400, MD5401, MD5402, MD5403, and MD5404)
ML07323015820 November 2007Indian PointUnit No.3 - Denial of Extension Request for Corrective Actions Required by Generic Letter 2004-02
ML07323016920 November 2007Indian PointApproval of Extension Request for Corrective Actions Required by Generic Letter 2004-02
ML0728300475 November 2007Nine Mile PointAuthorization Under 10 CFR 50.55(a)(3)(i) for Proposed Alternative Reactor Pressure Vessel Circumferential Shell Weld Volumetric Examinations (Tac No. MD3696)
ML07248024929 October 2007Indian PointRelief Request (RR) No. RR-06
ML0726001953 October 2007Nine Mile PointUnit No .1 - Authorization Under 10 CFR 50.55a(a)(3)(i) for Modification of Core Shroud Stabilizer Assemblies
ML07242016127 September 2007PilgrimRelief for the Reactor Core Shroud Stabilizer Assemblies
ML07242037627 September 2007Beaver ValleyFourth 10-Year Pump and Valve Inservice Testing Program Relief Requests (TAC Nos. MD5118, MD5119, MD5120, MD5121, MD5122, MD5123, MD5124, MD5125, MD5126, MD5127, MD5128, MD5129, MD5130, and MD5131)
ML07222029526 September 2007Indian PointRelief Request No. RR-04
ML07241026718 September 2007Indian PointIndian, Unit 2 - Relief Request No. RR-02
ML07205048817 September 2007Beaver ValleyRelief Request No. BV1-PZR-01 Regarding Weld Overlay Repairs on Pressurizer Nozzle Welds
ML0721304875 September 2007Indian PointRelief Request No. RR-01
ML07184090417 August 2007Beaver ValleyRelief Request No. BV3-PT-3 Regarding Hydrostatic Pressure Testing
ML0716501223 August 2007Beaver ValleyRelief Request No. BV3-PT-1 Regarding Hydrostatic Pressue Testing (TAC Nos. MD2936) and MD2937)
ML07173028118 July 2007Beaver ValleyRelief Request No. BV3-PT-2 Regarding Hydrostatic Pressure Testing
ML07059055530 April 2007Beaver ValleyRelief, Relief Request No. BV2-PZR-01 Regarding Weld Overlay Repairs on Pressurizer Nozzle Welds