ML10194044623 July 2008Catawba
Summer
Robinson
Email from John Zeiler to Heather Gepford and Ruben Hamilton CC: Mark Bates Subject: FW: DHEC Follow Up Testing
ML20155B08628 September 1998BrunswickForwards Insp Rept 50-324/98-08 & 50-325/98-08 on 980719- 0829.No Violations Noted
ML20153F48921 September 1998BrunswickDiscusses 980917 Meeting Re Licensee Status of Fire Protection Improvement Plan.List of Attendees & Copy of Util Presentation Handout Encl
ML20239A3572 September 1998BrunswickConfirms Telcon Between M Turkal & G Wiseman Re Meeting Requested by Mgt to Discuss Status of Fire Protection Improvement Plan.Meeting Originally Scheduled for 980901 Was Postponed.New Meeting Date Scheduled for 980917 in Atlanta
IR 05000413/199302629 October 1993CatawbaInsp Repts 50-413/93-26 & 50-414/93-26 on 930905-1002. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observations,Maintenance Observations & LER
IR 05000413/199302424 September 1993CatawbaInsp Repts 50-413/93-24 & 50-414/93-24 on 930808-0904.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observations,Maint Observations & LERs
ML20058N8208 September 1993CatawbaPackage Consisting of Attachment to Employee Concerns Program
IR 05000413/199302127 August 1993CatawbaInsp Repts 50-413/93-21 & 50-414/93-21 on 930704-0807.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observations,Maint Observations,Installation & Testing of Mods & Plant Procedures
IR 05000413/199301826 July 1993CatawbaInsp Repts 50-413/93-18 & 50-414/93-18 on 930606-0703.No Violations Noted.Major Areas Inspected:Review of Plant Operations,Engineered Safety Features Walkdown,Surveillance & Maint Observations
IR 05000413/199203129 January 1993CatawbaInsp Repts 50-413/92-31 & 50-414/92-31 on 921213-930109.No Violations Noted.Major Areas Inspected:Plant Operations Review,Engineered Safety Features,Sys Walkdowns,Cold Weather Protection Review & Surveillance Observation Review
IR 05000413/19920296 January 1993CatawbaInsp Repts 50-413/92-29 & 50-414/92-29 on 921108-1212. Violations Noted.Major Areas Inspected:Plant Operations, Auxiliary Feedwater CA Sys Design Problem,Improper Use of Chemistry Procedure & Containment Temp Deviation
IR 05000413/199002427 September 1990CatawbaInsp Repts 50-413/90-24 & 50-414/90-24 on 900803-0905. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation,Review of LERs & Followup of Previously Identified Items
IR 05000413/199001930 August 1990CatawbaInsp Repts 50-413/90-19 & 50-414/90-19 on 900624-0802. Violations Noted.Major Areas Inspected:Plant Operations, Refueling Activities,Surveillance/Maint Observations,Review of LERs & Followup of Previously Identified Items
ML20056A51019 July 1990CatawbaInsp Repts 50-413/90-15 & 50-414/90-15 on 900527-0623. Violation Noted.One Noncited Violation Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation & Maint Observation
IR 05000369/198902016 August 1989Mcguire
McGuire
Insp Repts 50-369/89-20 & 50-370/89-20 on 890717-21.No Violations Noted.Major Areas Inspected:Containment Local Leak Rate Testing & Verification of Containment Integrity
IR 05000425/198902225 June 1989VogtleInsp Rept 50-425/89-22 on 890612-16.No Violations Noted. Major Areas Inspected:Review of Completed Startup Tests & Closeout of Startup Test Insp Program
ML20245D41914 June 1989SequoyahInsp Repts 50-327/89-16 & 50-328/89-16 on 890508-12. Violation Noted.Major Areas Inspected:Review of Completed Unit 2,Cycle 4 Initial Criticality & Post Refueling Start Up Tests & Evaluation of Thermal Power Measurements for Unit 1
IR 05000425/19890164 May 1989VogtleInsp Rept 50-425/89-16 on 890327-31 & 0410-13.No Violations or Deviations Noted.Major Areas Addressed:Review of Completed,Precritical Tests,Witnessing of Initial Criticality & of Shutdown from Outside Control Test Room
IR 05000424/19890022 March 1989VogtleInsp Repts 50-424/89-02 & 50-425/89-02 on 890208-14.No Violations or Deviations Noted.Major Areas Inspected: Witnessing Initial Fuel Load of Unit 2 & Review of Proposed Startup Tests for Unit 2
IR 05000425/198900828 February 1989VogtleInsp Rept 50-425/89-08 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Testing,Preoperational Test Results Evaluation & Followup on NRC Bulletins 88-004 & 81-02
IR 05000425/198806530 November 1988VogtleInsp Rept 50-425/88-65 on 881024-28.No Violations or Deviations Noted.Major Areas Inspected:Containment Local Leak Rate Preoperational Test Program Review & Reactor Protection Sys Preoperational Test Procedure Review
IR 05000425/198805717 November 1988VogtleInsp Rept 50-425/88-57 on 881003-07 & 11-14.No Violations or Deviations Noted.Major Areas Inspected:Preoperational & Hot Functional Test Witnessing,Preoperational Test Procedure Review & Licensee Action on Previous Insp Findings