Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20247Q808 | 13 September 1989 | Comments on NRC Re Final Survey Repts for Unc Recovery Sys Operation in State of Ri.Addl Excavation of Area Conducted & Addl Samples Taken,Per NRC Request.Residual Matl in Area of Sample 7 Will Be Removed | |
ML20245D410 | 16 May 1988 | Discusses Decommissioning & License Termination for Rhode Island Facility & Forwards Preliminary Assessment of United Nuclear Corp Wood River Junction,Ri. Concern Expressed Re Applicability of Super Fund After License Termination | |
ML20154K796 | 3 May 1988 | Forwards Complete Sets of Well Analyses for 1986 & 1987,per 880426 Request | |
ML20154G299 | 2 May 1988 | Forwards Soil Analysis Results for Grid Block B-126,per 880426 Request.Scheduling of Verification Survey Requested as Soon as Possible Since Results Constitute Analysis of Last Grid Block of Concern | |
ML20149D304 | 4 January 1988 | Submits Updated Chain of Communications for Licensee,Per NRC Request | |
ML20235F061 | 12 June 1987 | Forwards Clarifying Info Re Deletion of Wells from Sampling Requirements,Per 870512 Request | |
ML20215L191 | 13 April 1987 | Forwards Nitrate & Radiological Analysis for Nov 1986,per 870304 Request for All Well Data for 1986.All Data Not Sent for Reasons Listed | |
ML20205E971 | 16 March 1987 | Notifies of Proposed Activities to Review & Further Decontaminate Grid Blocks Identified by NRC at Feb 1987 Meeting.Nrc Concerns Re Status of Listed Grid Blocks Arising from Results of Soils Analyses Ack & Addressed | |
ML20207S146 | 3 March 1987 | Informs That J Velasquez Assigned by Unc Corporate to Complete Remainder of Work Leading to Termination of License.Site Continues Under Day to Day Operational Mgt of K Helgeson | |
ML20211D572 | 28 January 1987 | Forwards Proposed Agenda for 870204 Meeting in Silver Spring,Md & Analytical Results of Soil Samples Taken from Areas of Addl Decontamination Since 850906 Meeting.Areas in Question Now Meet NRC Decontamination Guidelines for Soil | |
ML20198D830 | 2 May 1986 | Responds to NRC Re Soil Sample Isotopic U Analysis & Request for Action & Schedule for Completion of Soil Decontamination Efforts.Addl Soil Removal Being Conducted.Details of Effort Encl.W/O Schedule | |
ML20137X458 | 20 November 1985 | Forwards Abbreviated History of Recovery Sys Facility from 1964 to Present,In Response to Request | |
ML20198D947 | 2 October 1985 | Provides New Address | |
ML20132A361 | 27 August 1985 | Forwards Selected Papers in Hydrologic Sciences,1985, Dealing W/Usgs Studies Performed at Unc Recovery Sys Site | |
ML20054M814 | 22 June 1982 | Forwards Attachment to United Nuclear Corp | |
ML20126J576 | 6 February 1981 | Responds to NRC Re Violations Noted in IE Insp Rept 70-0820/80-14.Disputes Violation.Presents Seven Reasons for Considering U Scrap to Have Been Unirradiated Matl | |
ML20148P954 | 12 December 1980 | Submits List of Drums & Contents for Waste Shipment from Facility to Sc Burial Site | |
ML20148D408 | 9 July 1980 | Requests Consideration in Establishing Realistic Background Radiation Basis.Excerpt from Data Taken in Apr 1963 Encl | |
ML20147B690 | 2 November 1978 | Requests 10 Day Extension for Resolution of 781002 Inventory Since Contractor Labs Mass Spectrometer Unit Failed | |
ML20148A138 | 1 November 1978 | Forwards Response to 781012 NRC Ltr Re Deviation Noted in Inspec Rept 70-820/78-21.Corrective Actions:Assurance of Compliance W/Contamination Control Requirements,Institution of Vehicle Surveys,Formalization of Draft Procedures | |
ML20148A133 | 1 November 1978 | Provides Addl Info on Corrective Measures Taken in Response to IE Inspec 70-820/78-21.Oper Procedures for Contamination Control &/Or Health Physics Will Incl Handling Procedures for Contaminated Gloves | |
ML20148L150 | 27 October 1978 | Forwards List of Current Pages Now in Review Re Subj Facil, Formal Statements That Info Is No Longer Proprietary,Added Pages to Section 925.17 Re Fire Safety Aspects of Extraction Process & Revised Page for Section 407.1 | |
ML20197B618 | 23 October 1978 | Submits Addl Info & Action Plan in Response to 781016 NRC Ltr Re Physical Protec Plan.Corrective Actions:Firearms Requalification,Security Guard Training Record Audit,Maint of Journl,Unc Audit,Immediate Personnel Changes Made | |
ML20197B644 | 20 October 1978 | Forwards Lic Fee of $150,under Protest,To Amend Lic SNM-777 to Raise the Source Matl Possession Limits to Add 80,000 Lbs of Depleted U | |
ML20197B657 | 18 October 1978 | Responds to 781016 NRC Ltr Re Physical Protection Program at Subj Facil.Finds No Evidence of Deficiency.Forwards Established Procedures Which Are Believed Adequate.Sees No Need to Change Procedures | |
ML20148F595 | 13 October 1978 | Forwards Addl Info Re an Alternate Form of Constr of Sidewall of a Lagoon Using Ring of Sheet Steel Braced by Steel Posts & Supported W/An Impermeable Barrier of Betonite Clay.Additions Do Not Constitute Any Basic Changes | |
ML20147A969 | 21 September 1978 | Request Admin Amend to Lic SNM-777,clarifying Language in Health Physics Section to Assure Compliance During Planned Shutdown of Ventilation Equip.Forwards Check for $150 | |
ML20141E523 | 16 May 1972 | Requests Registration as Users of Model BB-250-2,GE Models BU-4 & BU-5,Kerr Mcgee Corp Model NPd-1-528 & United Nuclear Models UNC-2400 & UNC-2901 |