L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report26 October 2022and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report
SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program30 September 2021Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program
L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds19 March 2019Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic WeldsNondestructive Examination
Dissimilar Metal Weld
ML18012A56812 January 2018Technical Evaluation Report: Storm Surge_Seabrook_January2018High winds
Hydrostatic
SBK-L-17136, Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard Information28 August 2017Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard InformationProbabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML16216A24231 July 2016MPR-4273, Revision 0, Seabrook Station - Implications of Large-Scale Test Program Results on Reinforced Concrete Affected by Alkali-Silica Reaction, July 2016Commercial Grade Dedication
Hydrostatic
Aging Management
ML16216A24131 July 2016MPR-4288, Revision 0, Seabrook Station: Impact of Alkali-Silica Reaction on Structural Design Evaluations, July 2016
ML16279A05031 July 2016Enclosure 3: MPR-4153, Revision 2, Seabrook Station-Approach for Determining Through-Thickness Expansion from Alkali-Silica Reaction, July 2016 (Seabrook Fp# 100918) (Non-proprietary)Commercial Grade Dedication
ML16279A04931 July 2016Enclosure 2: Simpson Gumpertz & Heger, Inc., Evaluation and Design Confirmation of As-Deformed Ceb, 150252-CA-02, Revision 0, July 2016 (Seabrook FP#100985)Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Tornado Generated Missile
Earthquake
SBK-L-16071, Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 027 July 2016Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 0Safe Shutdown Earthquake
Operating Basis Earthquake
Incorporated by reference
Earthquake
ML16068A13527 February 2016Attachment 3 - Clean Copy of Seabrook Emergency Action Levels - Initiating Conditions, Threshold Values and BasisSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Backfit
ML16068A13927 February 2016Attachment 5 - Technical Information for Proposed Initiating Conditions and Emergency Action LevelsSafe Shutdown
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
FLEX
Surveillance Frequency Control Program
Spent Fuel Pool Instrumentation
Battery sizing
Earthquake
ML16068A13127 February 2016Attachment 2 - Markup of Seabrook Station Emergency Action Levels -Initiating Conditions, Threshold Values and Basis
ML16068A13727 February 2016Attachment 4 - NEI 99-01, Rev. 6, Deviations and Differences, Seabrook Station Nuclear Power Plant - Unit 1Safe Shutdown
High winds
Operating Basis Earthquake
Earthquake
Pressure Boundary Leakage
ML14216A40624 July 2014Attachment 5, WCAP-17444-NP, Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Seabrook Unit 1, (Non-proprietary)Hydrostatic
Finite Element Analysis
Aging Management
ML14216A40524 July 2014Attachment 3, WCAP-17441-NP, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal OperationHydrostatic
Aging Management
Exemption Request
ML14030A55225 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Severe Accident Management Guideline
Frazil ice
B.5.b Mitigating Strategies
Earthquake
ML14049A19714 February 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Seabrook Station, TAC No.: MF0836Safe Shutdown
Boric Acid
High winds
Ultimate heat sink
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Severe Accident Management Guideline
Frazil ice
B.5.b Mitigating Strategies
Earthquake
ML13260A16131 July 2013ANP-3243NP, Rev. 0, Seabrook Station Unit I Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report
ML13099A01919 March 2013Attachment 5 to SBK-L-13061, Holtec Non-Proprietary Licensing Report HI-2114996, Rev. 3, Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses.Fuel cladding
ML12340A48721 November 2012Enclosure to SBK-L-12242, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: SeismicUnanalyzed Condition
Boric Acid
High winds
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
ML12339A27413 September 2012Concrete Summary 4-12
ML12038A03830 January 2012Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses (Holtec International Document HI-2114996, Revision 2Shutdown Margin
FLEX
Fuel cladding
SBK-L-12256, WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation31 October 2011WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal OperationHydrostatic
Aging Management
ML11097026028 March 2011Nwt 817, Chemistry Control in the Seabrook Thermal Barrier Loop, FinalBoric Acid
ML10337016723 November 2010Attachment 3 to SBK-L-10185 -Seabrook Station Response to Request for Additional Information, NextEra Energy Seabrook License Renewal Environmental Report
ML09153054030 April 2009Attachment 5, WCAP-17071-NP, H: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F), Non-ProprietaryHydrostatic
Finite Element Analysis
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Power change
ML07092014231 January 2007LTR-SCS-07-14-NP, Revision 0, Engineering Report, Seabrook, Turbine Trip Without Reactor Trip Transient from the P-9 Setpoint Analysis.Stretch Power Uprate
Affidavit
SBK-L-05185, Limited Inspection of the Steam Generator Tube Portion within the Tubesheet at Seabrook Generating Station.31 August 2005Limited Inspection of the Steam Generator Tube Portion within the Tubesheet at Seabrook Generating Station.Nondestructive Examination
Finite Element Analysis
ML05122010922 April 2005Slides & Handouts from Meeting with FPL Energy Seabrook, LLC, Regarding Implementation of Technical Specification 3/4.8.1.1Offsite Circuit
ML03056044714 February 2003Submittal of Investigation Report on Blind Performance Test Samples
ML03036043123 January 2003Submittal of Investigation Report on Blind Performance Test Samples
ML0234702232 December 2002Response to Request for Corrected Information - Steam Generator Tube
ML0232405128 November 2002Part 2 of 2, FPL Energy, Seabrook Station, Root Cause Analysis for CR 02-08166 Evaluation of D Steam Generator Tube CrackingFinite Element Analysis
ML0232404935 November 2002Part 1 of 2, FPL Energy, Seabrook Station, Root Cause Analysis for CR 02-08166 Evaluation of D Steam Generator Tube CrackingNondestructive Examination
Finite Element Analysis
ML02077023112 March 2002Decommissioning Update March 2002
ML20248L40931 May 1998Analysis of Seabrook Stations Unit 1,Reactor Vessel Surveillance Capsules U & YAnticipated operational occurrence
Hydrostatic
ML20099J20316 July 1992Analysis of Seabrook Station Unit 1 Reactor Vessel Surveillance Capsule U