Issue date | Title | Topic | |
---|---|---|---|
ML24016A232 | 31 January 2024 | NEI White Paper: Summary of Recommendations - NEI White Paper: Assessment of the NRC Environmental Requirements for Siting | |
ML23257A093 | 31 August 2023 | Draft White Paper Selection of Seismic Scenario for EPZ Determination-Rev 0 | Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Design basis earthquake Earthquake |
ML23060A215 | 31 March 2023 | NEI, Enabling a Remote Response by Members of an Emergency Response Organization, Revision 0 | Fitness for Duty Cyber Security Job Performance Measure |
ML23136A607 | 27 December 2022 | ROP Whitepaper Modification of the Description of Unplanned Scrams with Complications Performance Indicator to Reflect AP1000 Design | Shutdown Margin |
ML22152A271 | 1 June 2022 | Digital Instrumentation and Control Common Cause Failure Policy Considerations, Revision 1 | Probabilistic Risk Assessment |
ML21208A021 | 27 July 2021 | Wp on Erfer PI (to NRC) Rev July 21 | Time of Discovery Significance Determination Process |
ML20353A133 | 18 December 2020 | NRC Review of NEI White Paper, Changes to NEI 10-04 and NEI 13-10 Guidance for Identifying and Protecting Digital Assets Associated with Security, Dated December 2020 | Cyber Security |
ML20199M368 | 17 July 2020 | NRC Review of NEI White Paper, Changes to NEI 10-04 and NEI 13-10 Guidance for Identifying and Protecting Digital Assets Associated with Safety-Related and Important-to-Safety Functions, Dated July 2020 | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Cyber Security Fire Protection Program |
ML19318D971 | 8 November 2019 | NEI White Paper - Defining Spent Fuel Performance Margins | Aging Management Low Safety Significance Issue Resolution Earthquake Fuel cladding |
ML19260G281 | 9 September 2019 | NEI White Paper, Implementing a 24-Month Frequency for Emergency Preparedness Program Reviews Rev. D, September 2019 | |
ML19122A321 | 30 April 2019 | May 7, 2019 Open Phase Condition Public Meeting Handout: NEI 19-02 - Guidance for Assessing Open Phase Condition Implementation Using Risk Insights | Safe Shutdown High winds Mission time Probabilistic Risk Assessment Operator Manual Action FLEX Open Phase Condition Offsite Circuit |
ML19079A281 | 28 February 2019 | 02-28-19_Summary of Recommended Changes to Regulatory Guides 1.226 and 1.228 to Support Issuance of Final Mitigation of Beyond Design Basis Events Rule | FLEX Spent Fuel Pool Instrumentation Severe Accident Management Guideline B.5.b Mitigating Strategies |
ML21259A191 | 28 February 2019 | NEI White Paper: the Economic Benefits and Challenges with Utilizing Increased Enrichment and Fuel Burnup for Light-Water Reactors - Prepared by the Nuclear Energy Institute, February 2019 | Shutdown Margin Safeguards Contingency Plan License Renewal Exemption Request Fuel cladding Uranium Hexafluoride Accident Tolerant Fuel |
ML19050A355 | 15 February 2019 | Meeting Handout: NEI White Paper - Guidance for Assessing Open Phase Condition Implementation Using Risk Insights | Safe Shutdown High winds Mission time Probabilistic Risk Assessment Operator Manual Action FLEX Open Phase Condition Offsite Circuit |
ML18305B421 | 23 October 2018 | White Paper: Assessment of Licensing Impacts on Construction -Experience with Making Changes During Construction Under Part 52 | Incorporated by reference |
ML18103A250 | 31 January 2018 | NEI White Paper: Addressing the Challenges with Establishing the Infrastructure for the front-end of the Fuel Cycle for Advanced Reactors | |
ML17341A604 | 1 December 2017 | Draft NEI White Paper Addressing the Challenges with Establishing the Infrastructure for the Front-End of the Fuel Cycle for Advanced Reactors | |
ML17235A593 | 30 June 2017 | First Principles for Use in Developing Design Certification Tier 1 Information and Inspections, Tests, Analyses and Acceptance Criteria | Safe Shutdown Fire Barrier Stroke time Nondestructive Examination Incorporated by reference Maintenance Rule Program |
ML17101A323 | 11 April 2017 | NEI Rev 0 Draft Fundamental I and C Design Principles White Paper for MP4 | Commercial Grade Dedication Cyber Security Fuel cladding |
ML12059A462 | 28 February 2012 | NRC Concerns Associated with NRC Release of RIS 2011-12, Revision 1, Attachment | |
RIS 2011-12, Response to Public Comments on Docket Id NRC-2011-0013-NRC Regulatory Issue Summary 2011-12, Revision 1, Adequacy of Station Electric Distribution System Voltages | 29 December 2011 28 February 2012 | Response to Public Comments on Docket Id NRC-2011-0013-NRC Regulatory Issue Summary 2011-12, Revision 1, Adequacy of Station Electric Distribution System Voltages Rev. 1 - Adequacy of Station Electric Distribution System Voltages (Track Changes) NRC Concerns Associated with NRC Release of RIS 2011-12, Revision 1, Attachment | Safe Shutdown Anticipated operational occurrence Operator Manual Action Offsite Circuit Backfit |
ML103560320 | 19 July 2011 | Enclosure - NRC Comments on NEI 05-10 Security Frequently Asked Questions Process, Rev 3 | Cyber Security |
ML081690011 | 13 June 2008 | U.S. Commercial Nuclear Power Plant Digital I&C System Operating Experience Revision 0, June 13, 2008 | Post Accident Monitoring Temporary Modification |