Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20211G33030 June 1999Annual Rept on Operation of Washington State Univ Triga Reactor,980701-990630. with sHigh winds
ML20151R35030 June 1998Annual Rept on Operation of Wa State Univ Triga Reactor for Reporting Period of Jul 1997-June 1998
ML20216E76013 April 1998Safety Evaluation Supporting Amend 16 to License R-76
ML20217N2203 April 1998Safety Evaluation Supporting Amend 17 to License R-76
ML20210J64930 June 1997Annual Rept on Operation of Wa State Univ Triga Reactor for Reporting Period Jul 1996-June 1997
ML20117K90430 June 1996Annual Rept on Operation of Washington State Univ Triga Reactor for Period of 950701-960630High winds
ML20091S26830 June 1995Annual Rept on Operation of Washington State University Triga Reactor, for Period of 940701-950630
ML20081L68823 March 1995Ro:On 950317,noted That Last Sewer Release on 950111 Exceeded New 10CFR20 Limits.Suspects Pump Mistakenly Left on or Valve Used to Control Degree of Dilution Not Set Properly
ML20073E09419 August 1994Treatment Room Study for Washington State Univ Boron Neutron Capture Therapy
ML20073E10131 July 1994Feasibility Study for Epithermal Neutro-Beam Facility at Washington State Univ Radiation Ctr
ML20072D19530 June 1994Annual Rept on Operation of Washington State Univ Triga Reactor for Reporting Period 930701-940630High winds
ML20064G8392 March 1994Special Rept:On 940224,reactor Scram Occurred Due to Excessive Control Blade Withdrawal.Signed Scram Record in Reactor Log & Restarted Reactor
ML20056E13630 June 1993Annual Rept on Operation of Washington State Univ Triga Reactor for Jul 1992 - Jun 1993
ML20099G79930 June 1992Annual Rept on Operation of Washington State Univ Triga Reactor for 910701-920630High winds
ML20105B52230 June 1992Annual Rept on Operation of Washington State Univ Triga Reactor, Facility License R-76 for Reporting Period Jul 1991 to June 1992High winds
ML20077R88730 June 1991Annual Rept on Operation of Wa State Univ Triga Reactor - 900701-910630
ML20024F79030 June 1990Amend to Annual Rept on Operation of Washington State Univ Triga Reactor, Covering Jul 1989 to June 1990,consisting of Info Re Environ Monitoring Program & Average Quarterly Exposure
ML20059B57130 June 1990Annual Rept on Operation of Washington State Univ Triga Reactor for Jul 1989 - June 1990
ML20247H87530 June 1989Amend to Annual Rept on Operation of Washington State Univ Triga Reactor for Jul 1988 - June 1989
ML20246A82130 June 1989Annual Rept on Operation of Washington State University Triga Reactor for Jul 1988 - June 1989
ML20106B8904 November 1988Rept on Receipt of 8,049 Ci of Sealed Sources of Co-60 at Washington State Univ on 880929
ML20214J66530 June 1986Annual Rept on Operation of Washington State Univ Triga Reactor,Jul 1985 - June 1986
ML20134D65930 June 1985Annual Rept on Operation of Washington State Univ Triga Reactor,Jul 1984 - June 1985
ML20095L50030 June 1984Annual Rept on Operation of Washington State Univ Triga Reactor,Jul 1983 - June 1984
ML20106J78730 June 1984Amend to Annual Rept on Operations of Washington State Univ Triga Reactor, for Reporting Period of Jul 1983 - June 1984
ML20087N30516 March 1984Part 21 Rept Re Failure of Siemens Health Physics Svcs Solid State Neutron Dosimeters to Measure Fast Neutrons.Exposure Test Program Procedure Valid.Test Results & Supporting Documentation Encl
ML20082E57521 November 1983Corrections to Annual Rept for Jul 1982 - June 1983
ML20077J39312 August 1983Annual Rept on Operation of Washington State Univ Triga Reactor,Jul 1982 - June 1983
ML20054H40731 May 1982Safety Evaluation Report Related to the Renewal of the Operating License for the Washington State University Triga Reactor.Docket No. 50-27Safe Shutdown
Shutdown Margin
Emergency Lighting
License Renewal
Earthquake
Fuel cladding
ML19331D75125 August 1980Annual Rept on Operation of Washington State Univ Triga Reactor,Jul 1979-June 1980.
ML19242D2308 August 1979Annual Operating Rept for Period 780701-790630
ML19269E30131 May 1979Wa State Univ Modified Triga Nuclear Reactor SAREarthquake
Fuel cladding