ML20203H88230 September 1998Technical Evaluation Rept on Second 10-year ISI Program Plan:Entergy Operations,Waterford-3 Steam Electric StationVT-2
Incorporated by reference
ML20135E58426 February 1997Revised, TER of IPE Submittal & RAI Responses for Waterford-3 Steam Electric StationSafe Shutdown
Boric Acid
Ultimate heat sink
Mission time
Internal Flooding
ML20082S93730 September 1991Trip Rept:Onsite Analysis of Human Factors of Event at Waterford 3 on 910624 (Manual Reactor Trip W/Excess Steam Demand)Boric Acid
Stroke time
ML20082N09218 June 1991Draft Assessment of Intersystem LOCA Risks - Methodology & Application:C-E Plant
ML20070Q76731 December 1988Nuclear Power Plant Sys Sourcebook,Waterford 3Safe Shutdown
Boric Acid
Ultimate heat sink
Emergency Lighting
B.5.b Mitigating Strategies
ML20235C47231 October 1988Pump & Valve Inservice Testing Program,Waterford Steam Electric Station,Unit 3Boric Acid
Stroke time
Power-Operated Valves
Power Operated Valves
ML20148M06931 March 1988Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at Waterford Unit 3
ML20236F79330 September 1987Structural Adequacy of Waterford 3 Basemat, Technical Evaluation Rept
ML20195G54530 September 1987TMI Action-NUREG-0737 (II.D.1) Relief & Safety Valve Testing Waterford Steam Electric Station,Unit 3, Technical Evaluation ReptLoop seal
Anticipated operational occurrence
ML20235L84330 June 1987Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Waterford 3, Informal Rept
ML20214Q93130 April 1987Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Waterford-3, Informal Rept
ML20214R74331 March 1987Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3
ML20215G27431 March 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3
ML20214R15331 March 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept
ML20210Q4489 January 1987Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept
ML20215N80723 October 19863 Emergency Preparedness Exercise on 861015Earthquake
ML20215K45930 September 1986Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Waterford Unit 3,Washington Nuclear Plant Units 1 & 3
ML20197C60230 April 1986Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,St Lucie Units 1 & 2 & Waterford Unit 3
ML20137Z31721 October 1985Design Verification & Design Validation Audit of SPDS for Louisiana Power & Light Waterford Unit 3Reactor Vessel Water Level
ML20138N84430 September 1985Dcrdr for Waterford Unit 3, Technical Evaluation Rept
ML20138C19415 August 1985Rev 1 to Project & Budget Proposal for NRC Work: Evaluation of Selected NRC Open Items Before Plant Fuel Load
ML20244D38710 July 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant.
ML20244D43830 June 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities
ML20117C18830 April 1985III Project I Rept, Informal Rept
ML20113D2224 January 1985Comments on Detailed Control Room Design Review Program Plan
ML20107H75518 July 1984Review of Waterford III Basemat AnalysisFinite Element Analysis
Earthquake
ML20107H73221 June 1984Review of Waterford III Basemat AnalysisFinite Element Analysis
Earthquake
ML20107H67316 April 1984Review of Waterford III Basemat AnalysisFinite Element Analysis
Earthquake
ML20024B95731 July 1983Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant.
ML20076A76831 May 1983Draft Control of Heavy Loads at Nuclear Power Plants, Waterford Generating Station,Unit 3,Louisiana Power & Lighting Co (Phase 1), Technical Evaluation ReptSafe Shutdown
Boric Acid
Coatings
Control of Heavy Loads
ML20112J41031 March 1983Audit of Environ Qualification of Safety-Related Electrical Equipment at Waterford Steam Electric Station,Unit 3
ML20062A93730 April 1982Control of Heavy Loads at Nuclear Power Plants,Waterford Generating Station,Unit 3, Draft Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads