Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-96-034, TER on Third 10-Yr Interval ISI Program Plan:Nppd Cns31 March 1997TER on Third 10-Yr Interval ISI Program Plan:Nppd CnsBoric Acid
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Pressure boundary leak
Through Wall Leak
ML20097F71231 May 1995Plant Technical Evaluation Rept on IPE Back-End SubmittalProbabilistic Risk Assessment
Hardened vent
ML20097F72731 May 1995Plant Technical Evaluation on IPE Submittal Human Reliability Analysis, Final ReptInternal Flooding
Job Performance Measure
Hardened vent
ML20097F68718 May 1995Plant Technical Evaluation Rept on IPE Front End AnalysisMission time
Internal Flooding
Probabilistic Risk Assessment
ML20083A32130 June 1993Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01, Technical Evaluation Rept
ML20082G25231 May 1991Technical Evaluation Rept,Cooper Nuclear Station,Station Blackout Evaluation, Final ReptSafe Shutdown
Reactor Vessel Water Level
Battery sizing
ML19327A67631 May 1989Conformance to Generic Ltr 83-28,Item 2.2.1-Equipment Classification for All Other Safety-Related Components: Cooper, Technical Evaluation Rept
ML20070Q77831 December 1988Nuclear Power Plant Sys Sourcebook,Cooper
ML20151T5839 November 1987Technical Evaluation Rept for Spds
ML20214R53831 March 1987Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, Cooper, Informal Rept
ML20215N59829 September 1986Technical Evaluation Rept of Dcrdr for Cooper Nuclear StationEmergency Lighting
ML20212A82424 July 1986Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Cooper Nuclear Station, Supplementary Technical Evaluation Rept
ML20214G40831 March 1986Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Selected GE BWR Plants (Cooper,Dresden 2 & 3,Fermi 2 & Fitzpatrick)
ML20215M50431 January 1986Conformance to Reg Guide 1.97,Cooper Nuclear StationSquib
Fuel cladding
ML20151Y28030 September 1985Second Interval Inservice Insp Program,Cooper Nuclear Station, Technical Evaluation ReptHydrostatic
Dissimilar Metal Weld
ML20132G03326 March 1985Dcrdr,Nebraska Public Power District Cooper Nuclear Station, Technical Evaluation Rept
ML20112B74731 December 1984Conformance to Reg Guide 1.97,Cooper Nuclear Station, Interim ReptShutdown Margin
Squib
ML20106F39128 December 1984Human Factors Engineering Detailed Control Room Design Review In-Progress Audit,Cooper Nuclear Station
ML20077M1008 September 1983Control of Heavy Loads (C-10),Cooper Nuclear Station, Technical Evaluation ReptSafe Shutdown
Nondestructive Examination
Finite Element Analysis
Control of Heavy Loads
Liquid penetrant
ML20093M79431 July 1983Technical Evaluation of Integrity of Cooper Nuclear Station Reactor Coolant Boundary Piping Sys
ML20072A15830 December 1982Control of Heavy Loads (C-10),Nebraska Public Power District,Cooper Nuclear Station, Draft Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20126E9947 December 1982Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982
ML20127A2895 October 1982Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982
ML20076B66028 September 1982ECCS Repts (F-47) TMI Action Plan Requirements,Cooper Nuclear Station, Technical Evaluation Rept
ML20023D7172 September 1982Inservice Insp Program, Technical Evaluation ReptHydrostatic
Nondestructive Examination
Incorporated by reference
Liquid penetrant
ML20126F25426 August 1982Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982
ML20065U2751 July 1982Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1) for Cooper Nuclear Station, Final Technical Evaluation Rept
ML20054E85130 June 1982Technical Evaluation of Electrical Instrumentation & Control Design Aspects of Overside of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Cooper Nuclear Power Station
ML20052F6662 March 1982Technical Evaluation of Monitoring of Electric Power to Reactor Protection Sys for Cooper Nuclear Station.
ML20038A76931 October 1981Aquatic Impacts from Operation of Three Midwestern Nuclear Power StationsGrab sample
Biofouling
ML19341A33331 October 1980Examination of Cracked Turbine Disc from Cooper Nuclear Power Station, Informal Rept
ML19269C66631 August 1978Recommendations to NRC on SER for Inservice Insp & Testing Program,Revision 1. Discusses Relief Requests & Specific Evaluations.Concludes Program,As Modified by Rept,Complies W/Asme StandardsSafe Shutdown
Loop seal
Hydrostatic
Exemption Request
Liquid penetrant