Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000089/1998202 | 11 June 1998 | Insp Repts 50-089/98-202 & 50-163/98-202 on 980504-07. Violations Noted.Major Areas Inspected:Organization & Staffing,Review & Audit Functions,Emergency Preparedness, Safeguards & Security | License Renewal |
ML20249A700 | 11 June 1998 | Notice of Violation from Insp on 980504-07.Violations Noted: on 970712,drill Was Documented as Completed But Not Qualify as Drill Since No One Was Told About Drill & Key Locks for Reactor Controlled Access Area Not Changed | |
IR 05000089/1998201 | 18 March 1998 | Insp Repts 50-089/98-201 & 50-163/98-201 on 980217-18.No Violations Noted.Major Areas inspected:on-site Review of Selected Aspects of Licensee Class III Nonpower Reactor Including;Organization & Staffing & Radiation Protection | |
IR 05000089/1993001 | 1 September 1993 | Partially Withheld Insp Repts 50-089/93-01 & 50-163/93-01 on 930803-06.Non-cited Violations Identified.Major Areas Inspected:Reactor Operations,Review & Audit,Experiments, Transportation Activities & EP Program & Drills | |
ML20062G293 | 8 November 1990 | Exam Rept 50-089/Ol-90-01 on 901023-24.Exam Results:One Senior Reactor Operator (RO) & One RO Passed Exam | |
PNO-V-89-021, on 890330,control Rod 5 Failed to Insert on Manual Scram Following Anomalous Reactivity Indications During Calibr.Caused by 2-inch Spacer Between Connecting Rod & Control Rod Not Included When Drive Assembly Changed | 3 April 1989 | PNO-V-89-021:on 890330,control Rod 5 Failed to Insert on Manual Scram Following Anomalous Reactivity Indications During Calibr.Caused by 2-inch Spacer Between Connecting Rod & Control Rod Not Included When Drive Assembly Changed | |
IR 05000089/1989001 | 24 March 1989 | Insp Rept 50-089/89-01 on 890314-16.No Violations,Deviations or Safety Concerns Noted.Major Areas Inspected:Training for Computer Control Console,Associated Training Records,Console Operation by Operators & Exit Interview | |
IR 05000089/1987003 | 7 January 1988 | Insp Rept 50-089/87-03 on 871217.No Violations or Deviations Noted.Major Areas Inspected:Bypassing of Reactor Safety Interlock & Insp Procedures 40750,90712 & 92700 Addressed | |
ML20234F315 | 23 December 1987 | Exam Repts 50-089/OL-87-03 & 50-163/OL-87-03 on 871214.Exam Results:One Senior Reactor Operator Candidate Passed Written Exam.Oral Portion of Exam Waived Due to Prior Passing Evaluation by Candidate | |
PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted | 24 November 1987 | PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted | Earthquake |
ML20238D615 | 13 August 1987 | Exam Rept 50-089/OL-87-02 on 870804-05.Exam Results:All Candidates Passed Oral Exams & Two Candidates Passed Senior Reactor Operator (SRO) Written Exams.Two SRO Licenses Issued | |
ML20234E208 | 11 June 1987 | Exam Rept 50-089/OL-87-01 on 870519-20.Exam Results:All Reactor Operator Candidates Passed Oral & Written Exams. Written Exam & Answer Key Encl | |
IR 05000089/1987001 | 13 March 1987 | Insp Repts 50-089/87-01 & 50-163/87-01 on 870227.No Violations & Deviations Noted.Major Areas Inspected:Followup on Allegations Pertaining to Release of Irradiated Matl from Facility W/O Radiation Surveys & Followup on LER | |
IR 05000089/1986002 | 5 November 1986 | Insp Repts 50-089/86-02 & 50-163/86-02 on 861007-10.No Violations or Deviations Noted.Major Areas Inspected: Organization,Review & Audit,Experiments,Qualification Training,Lers & Emergency Preparedness Program | |
ML20213G982 | 30 October 1986 | Exam Rept 50-089/OL-86-02 on 861021 & 22.Exam Results:One Senior Reactor Operator Candidate Administered & Passed Oral & Written Exams & License Granted.Written Exam & Answer Key Encl | Shutdown Margin |
PNO-V-86-041, on 860713,earthquake Measuring 5.7 on Richter Scale & Aftershocks Occurred Actuating Seismic Alarms.Insp Procedures Implemented.No Abnormal Condition Noted.Effects Also Felt at Listed Nonpower Reactors | 14 July 1986 | PNO-V-86-041:on 860713,earthquake Measuring 5.7 on Richter Scale & Aftershocks Occurred Actuating Seismic Alarms.Insp Procedures Implemented.No Abnormal Condition Noted.Effects Also Felt at Listed Nonpower Reactors | Earthquake |
PNO-V-86-029, on 860527,electrical Pressure Sensing Device Used for Detecting Leaks in Secondary Containment W/Experimental Capsule of U-235,failed.Caused by Short in Sys.Sensing Device Repaired | 29 May 1986 | PNO-V-86-029:on 860527,electrical Pressure Sensing Device Used for Detecting Leaks in Secondary Containment W/Experimental Capsule of U-235,failed.Caused by Short in Sys.Sensing Device Repaired | |
ML20198H986 | 13 May 1986 | Exam Rept 50-089/OL-86-01 on 860429-30.Exam Results:Three Reactor Operator Candidates Passed Oral & Written Exams & Granted Licenses |