Issue date | Title | Topic | |
---|---|---|---|
ML20212G104 | 6 January 1987 | Cycle 9 Startup Test Rept | |
ML20198S514 | 29 May 1986 | Station,Oconee 3,Cycle 9 Startup Testing Rept,Part 1 Zero Power Physics Test,Part II Power Escalation Test | Power change |
ML20094C151 | 12 July 1984 | Extension of Retainer Lifetime to 4 Cycles | Flow Induced Vibration |
ML20087M443 | 26 March 1984 | Cycle 7 Startup Testing Rept | Power change |
ML20040B071 | 31 December 1981 | Analysis of Capsule OCII-A from Duke Power Co Oconee Nuclear Station,Unit 2,Reactor Vessel Matl Surveillance Program. | Hydrostatic |
ML20040B068 | 31 October 1981 | Analysis of Capsule OCIII-B from Duke Power Co Oconee Nuclear Station,Unit 3,Reactor Vessel Matls Surveillance Program. | |
ML20147B668 | 29 September 1978 | Integrated Leak Rate Test of Reactor Containment Bldg | |
ML19340A135 | 31 May 1978 | Unit 3,Cycle 3,Startup Testing Summary. | |
ML19316A543 | 30 April 1978 | Cycle 3 Startup Testing Summary. | |
ML19312C807 | 6 October 1977 | Integrated Leak Rate Test of Reactor Containment Bldg. | |
ML19340A166 | 1 March 1977 | Unit 3,Cycle 2,Startup Testing Summary. | Shutdown Margin |
ML19312C848 | 1 October 1976 | Jocassee Dam QA Test Results. List of Info Submitted on 761001 Encl | |
ML19316A115 | 22 June 1976 | Integrated Leak Rate Test of Reactor Containment Bldg. | |
ML19312C926 | 20 March 1975 | Reactor Bldg Post-Tensioning Sys Initial Surveillance. | |
ML19322C130 | 14 March 1975 | Startup Rept,Unit 3,for 750314. | |
ML19317F281 | 29 October 1974 | Reactor Bldg Post-Tensioning Sys,End Anchorage Surveillance. | |
ML19322C171 | 9 August 1974 | Startup Rept. | |
ML19322C129 | 5 August 1974 | Structural Integrity Test Rept of Reactor Containment Bldg. Prepared for Util | |
ML19316A458 | 16 November 1973 | Startup Rept. | |
ML19317E479 | 12 October 1973 | Rept of Testing of Two Atmosphere Supplying Suits. | |
ML19322C168 | 20 September 1973 | Structural Integrity Test Rept of Reactor Containment Bldg. Prepared for Util | |
ML19317F081 | 23 August 1973 | Reactor Coolant Flow Evaluation, Preliminary Rept | |
ML19322C180 | 15 February 1973 | Results of Oconee 1 Hot Functional Testing,Internals Vibration Monitoring Program. | |
ML19316A240 | 29 October 1971 | Structural Integrity Test Rept of Reactor Containment Bldg. Prepared for Util | |
ML19317F245 | 5 August 1971 | Integrated Leak Rate Test of Reactor Containment Bldg. | |
ML19316A227 | 14 July 1970 | Integrated Leak Rate Test of Reactor Containment Bldg. Prepared W/Technical Assistance by Bechtel Corp | |
ML19317E774 | 26 February 1968 | Keowee-Toxaway Project Jocassee Development;Summary of Matls Testing & Stability Design. |