Issue date | Title | Topic | |
---|---|---|---|
ML20205L243 | 5 April 1999 | SFP Soluble Boron Credit Dilution Analysis (Summary of Applicable Portions) | |
ML20205L253 | 5 April 1999 | Boraflex Degradation Analysis | |
ML20210K928 | 31 August 1997 | Cycle 12 Startup Rept | |
ML20216B817 | 25 August 1997 | Rev 0 to PE-9778-1, Test Rept-Grinnell Hydraulic Snubber Freedom of Motion Test Under Duke Powers McGuire Nuclear Station MSLB Accident Temp Condition | |
ML20046D383 | 3 August 1993 | Cycle 9 Startup Rept. | |
ML20059L772 | 31 May 1993 | Reactor Containment Building Integrated Leakage Rate Test Rept | Local Leak Rate Testing Backfit |
ML20100Q139 | 31 January 1992 | Cycle 8 Startup Rept | Shutdown Margin |
ML20076N024 | 28 February 1991 | Cycle 7 Startup Testing Rept | Boric Acid |
ML20196F014 | 9 February 1988 | Cycle 5 Startup Rept | |
ML20203N810 | 9 October 1986 | ECCS Pump Room Pressure Verification | Boric Acid |
ML20214J959 | 17 August 1986 | Reactor Containment Bldg Integrated Leak Rate Test Conducted 860814-17 | Local Leak Rate Testing |
ML20099E656 | 18 February 1985 | Rev 1 to Reactor Vessel Cavity Seal Test Results,Catawba Nuclear Station,Units 1 & 2,McGuire Nuclear Station,Units 1 & 2 | Hydrostatic |
ML20104A960 | 18 January 1985 | Reactor Vessel Cavity Seal Test Results | Hydrostatic |
ML20024E651 | 5 August 1983 | Duke Power Co McGuire Nuclear Station,Unit 1,Reactor Containment Bldg Integrated Leak Rate Test Conducted 830415-18. W/830805 Ltr | |
ML20028B536 | 18 November 1982 | Reactor Containment Bldg Integrated Leak Rate Test,Suppl 2. | |
ML20081F508 | 15 November 1982 | Suppl 3 to Startup Rept | |
ML20066K783 | 10 September 1982 | Analysis of Cables & Connectors Following Accident Test Conducted on 820331 & Extended Accident Test Conducted 820510-18 on Electrical Penetration Assembly,Type B-M, Vol 2 | Boric Acid |
ML20066K756 | 21 July 1982 | Environ Qualification Test Rept on Electrical Penetration Assembly,Type B-M, Vol 1 | |
ML20049J333 | 15 February 1982 | Startup Rept. | |
ML19341C549 | 27 February 1981 | Reactor Containment Bldg Integrated Leak Rate Test Suppl 1. | |
ML19341A114 | 5 January 1981 | Analysis of Hydrogen Control Measures at McGuire Nuclear Station, Vol 3 | |
ML19257A911 | 3 January 1980 | Reactor Containment Bldg Integrated Leak Rate Test. | |
ML20064E989 | 20 November 1978 | Test Procedure for Qual of Joy Manufacturing Co Axial Fan/Motor Units for Class I Svc in Nuc Pwr Stations of Both BWR & PWR Types.Test Conducted to Document & Qual Fan Motor Unit | |
ML19305D310 | 6 July 1978 | Qualification Test Rept on Three Model 386A Differential Pressure Transmitters & Remote Sensors, Vol 1,Revision B | Coatings |
ML19305D313 | 6 July 1978 | Qualification Test Rept on Three Model 386A Differential Pressure Transmitters & Remote Sensors, Vol 2,Revision C |