Reactor Containment Bldg Integrated Leak Rate Test,Suppl 2.
ML20028B536
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 11/18/1982
From:
DUKE POWER CO.
To:
Shared Package
ML20028B535 List:
References
NUDOCS 8212030003
Download: ML20028B536 (5)


Text

--

9

-4..-

i 1

i 4

l I

^

DUKE POWER COMPANY i McGUIRE NUCLEAR STATION

! UNIT 1

  • f i

Reactor Containment Building ,

Integrated Leak Rate Test 4

Supplement 2 1

i 4

l i

1 l

i I

i i -

4 i

j 1

I i-;

,i i

l i

1-8212030003 821118 PDR ADOCK 05000369 P PDR t__ _ . . _ _ _ . , _ _ _ _ _ _ _

. l i

TABLE OF CONTENTS i Introduction 1 Testing of New Piping Penetration 2 Test of New Instrument Penetrations 3

s

, . .I.

\

i

-)

I l

l

- Introduction This report is issued as a followup.to the " Reactor Containment Buidling i Integrated Leak Rate Test Supplement 1" sent to Harold Denton on 2/27/81.-

Its purpose is to document leak rate testing that has been performed since the previous report was written.

i

?

4 l

I l

l i

i 1

l h

,c- . -. . . _ - + , _ . , - - _ _ _ _ _ . - - _ _ . . -. e-, , , _ , . - - , , , - - _ ~ . . ..._._-.-_ -.._ , ., _ -. - _ _ - , - -

Testing of New Piping Penetration A new piping penetration has been added to containment since the last ILRT.

Penetration M383 (Water Addition to the Ice Condenser) was tested using

- PT/1/A/4200/01C, Isolation Valve Leak Rate Test, on 7/8/82. The measured

-5 leakage of the penetration was 5 SCCM or 5.5 x 10 La. This penetration will not be tested on a periodic basis since it is not a source of bypass leakage.

J m

J f

Testing of New Instrument Penetrations Several new instrument penetrations have been added to containment since the ILRT. Those not previously reported were tested using PT/1/A/4200/21, Instrument Penetration Structural Integrity and Leak Rate Test. This test verified the structural integrity of the weld at the inside of the contain-ment vessel by pressurizing the weld to structural integrity test pressure, holding for 10 minutes, reducing pressure to 14.8 psig, and verifying no

, measurable leakage. The instrument line numbers that were added and tested in this manner art:

1NILT6630 - tested 3/24/81 INILT6640 - tested 3/24/81 l 1NILT6650 - tested 3/24/81 INILT6660 - tested 3/24/81 1NILT6670 - tested 3/25/81 INILT6680 - tested 3/24/81 1RVFE5030 - tested 3/7/82 1RVFE5040 - tested 3/7/82 1RVFE5050 - tested 3/8/82 1RVFE5060 - tested 3/7/82 f

4

< _ . _ . . _ _ __._.___ _ _ _ _ __ - . _ _ - - . . _ _ _ _ _ _ __ . _ _ _ . -