Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML15261A468 | 4 September 1998 | Safety Evaluation Supporting Amends 232,232 & 231 to Licenses DPR-38,DPR-47 & DPR-55,respectively | Safe Shutdown Probabilistic Risk Assessment Maintenance Rule Program |
ML20198J765 | 15 October 1997 | Safety Evaluation Accepting 10-yr Interval Insp Program Plan Alternatives for Listed Plants Units | VT-2 Incorporated by reference |
ML20148H250 | 5 June 1997 | Safety Evaluation Accepting Proposed Restructuring of Util Through Acquisition Of,& Merger W/Panenergy Corp | |
ML20134N712 | 20 February 1997 | Safety Evaluation Accepting Relief Request 96-04 for Plant | Hydrostatic |
ML20236L597 | 29 December 1994 | SER in Response to 940314 TIA 94-012 Requesting NRR Staff to Determine Specific Mod to Keowee Emergency Power Supply Logic Must Be Reviewed by Staff Prior to Implementation of Mod | Backfit |
ML20236Y022 | 8 July 1987 | Safety Evaluation Clarifying Determination of Acceptability of Test Duration for Performance of Integrated Leak Rate Test at Plant | Boric Acid |
ML20214S873 | 26 November 1986 | Safety Evaluation Re LER 269/86-006 Concerning Moderator Temp Coefficient.Concurs W/Licensee Assessment,Actions Taken or to Be Taken.Four Impacted FSAR Events All Remained within Respective Safety Criteria | Shutdown Margin |
ML20236X694 | 5 August 1986 | Supplemental Safety Evaluation Supporting Seismic Qualification of Auxiliary Feedwater Sys (Multi-Plant Action C-14).SALP Input & 861029 Fr Re Proposed Rules Section Encl | Safe Shutdown Safe Shutdown Earthquake Exemption Request Earthquake Backfit |
ML20236X537 | 22 October 1985 | SER Re Seismic Qualification of Plant Auxiliary Feedwater Sys.Nrr Request for Addl Info Encl | Safe Shutdown High winds Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Earthquake |
ML20134N776 | 15 May 1985 | Safety Evaluation Accepting Util 831104 Response to Generic Ltr 83-28 Item 1.1 Re post-trip Review Program & Procedures | |
ML20236X577 | 29 December 1982 | SER Addressing Concerns of Safe Shutdown of Plant Following Fire,Internal Flooding of Turbine Bldg & Security Incidents | Safe Shutdown Shutdown Margin Fire Barrier Tornado Missile Internal Flooding Earthquake |
ML20126M501 | 22 May 1981 | Safety Evaluation for Unit 2 Concluding That Conformance W/Requirements & Completion of Corrective Actions by 820630 Will Ensure Compliance w/800523 Memorandum & Order.Info Re Deficiencies Noted Requested within 90 Days | Boric Acid |
ML20214J291 | 20 December 1979 | Safety Evaluation Re Preliminary Design for safety-grade Anticipatory Reactor Trips on Loss of Main Feedwater &/Or Turbine Trip |