Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
M180068, GE-Hitachi Nuclear Energy Americas, LLC - Advanced Boiling Water Reactor Design Certification Rule Renewal Application - Additional Information for Response to Rals 06.03-4 Through 06.03-9 | 28 March 2018 | GE-Hitachi Nuclear Energy Americas, LLC - Advanced Boiling Water Reactor Design Certification Rule Renewal Application - Additional Information for Response to Rals 06.03-4 Through 06.03-9 | Boric Acid Mission time Coatings Incorporated by reference Foreign Material Exclusion |
ML16120A032 | 29 April 2016 | GE-Hitachi Nuclear Energy Americas, LLC - Supplemental Information for Response to Item No. 26 - Fukushima Recommendation 4.2 Mitigation Strategies of NRC Suggested U.S. Advanced Boiling Water Reactor Design Changes | FLEX Earthquake Backfit |
ML16120A044 | 29 April 2016 | Mfn 15-069, Supplement 1 - Geh'S Response to Nrc'S Request for Supplemental Information to Item #26 - Fukushima Recommendation 4.2 - Mitigation Strategies ABWR DCD Revision 6 Markups | Safe Shutdown Unanalyzed Condition Reactor Vessel Water Level Ultimate heat sink FLEX Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Hardened vent |
ML16120A043 | 29 April 2016 | Mfn 15-069, Supplement 1 - GEH Proposed Resolution and Response to Nrc'S Request for Supplemental Information to Item #26 - Fukushima Recommendation 4.2 - Mitigation Strategies | FLEX |
ML16120A042 | 29 April 2016 | Supplemental Information for Geh'S Response to Item #26 - Fukushima Recommendation 4.2 Mitigation Strategies of NRC Suggested U.S. Advanced Boiling Water Reactor Design Changes | Earthquake Backfit |
ML16120A033 | 29 April 2016 | GE-Hitachi Nuclear Energy Americas, LLC - Response to NRC Post-Fukushima Recommendations | Safe Shutdown Unanalyzed Condition Reactor Vessel Water Level Ultimate heat sink FLEX Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Hardened vent |
ML16102A348 | 11 April 2016 | Enclosure 2 to Mfn 15-064, Revision 1, Supplement 1: Geh'S Supplemental Response to RAI 09.05.01-1 - ABWR DCD Revision 6 Markups | Safe Shutdown Fire Barrier Multiple Spurious Operation |
ML16102A346 | 11 April 2016 | Enclosure 1 to Mfn 15-064, Revision 1, Supplement 1: Geh'S Revised Response and Supplemental Information RAI 09.05.01-1 | Safe Shutdown Multiple Spurious Operation |