Issue date | Title | Topic | |
---|---|---|---|
ML16007A034 | 4 February 2016 | Request for Additional Information Related to Benchmarks for Quantifying Fuel Reactivity Depletion Uncertainty and Utilization of the EPRI Depletion Benchmarks for Burnup Credit Validation. | |
ML14238A517 | 22 September 2014 | RAIs for EPRI Reports 1022909 and 1025203 Referenced in NEI 12-16 Rev 2 | |
ML14197A171 | 22 July 2014 | Request for Additional Information Regarding the Review of Nuclear Energy Institute 14-05, Guidelines for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services, Revision 0 | Commercial Grade Dedication |
ML120730659 | 19 March 2012 | Request for Additional Information #2 for Nuclear Energy Institute TR 09-10, Rev 1, Gas Management | High Radiation Area Functionality Assessment |
ML120370202 | 8 February 2012 | Request for Additional Information Regarding the Review of NEI 11-04, Nuclear Generation Quality Assurance Program Description, Draft Revision 0 | |
ML112140617 | 4 August 2011 | Request for Additional Information on Topical Report 09-10, Revision 1, Guidelines for Effective Prevention and Management of System Gas Accumulation | |
ML103010115 | 3 February 2011 | Request for Additional Information, Related to NEI 10 01, Industry Guideline for Developing a Plant Parameter Envelope in Support of an Early Site Permit, Revision 0 (Project No. 689; TAC Q00341) | Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile |
ML093340541 | 3 December 2009 | Request for Additional Information Nuclear Energy Institute (NEI) Topical Report 94-01, Revision 2-A Supplement 1, Industry Guideline for Implementing the Performance-Based Option of 10 CFR Part 50, Appendix J. | Grace period |
ML092370095 | 28 August 2009 | Request for Additional Information Nuclear Energy Institute Topical Report Material Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169), (MRP-169) (TAC | Weld Overlay Nondestructive Examination Dissimilar Metal Weld DM weld |
ML091210549 | 13 May 2009 | Request for Additional Information (RAI) Regarding Nuclear Energy Institute Topical Report Material Reliability Program (MRP) Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169) | Weld Overlay Stress corrosion cracking Dissimilar Metal Weld |
ML091140483 | 30 April 2009 | Supplemental Request for Additional Information Regarding Nuclear Energy Institute Technical Report 06-14A, Quality Assurance Program Description, Revision 6 (Project No. 689; TAC Q00014) | Commercial Grade Dedication |
ML082740382 | 23 October 2008 | Request for Additional Information, Topical Report WCAP-16294-NP, Revision 0, Risk-Informed Evaluation of Changes to Technical Specification Required Endstates for Westinghouse NSSS PWRs | |
ML082460783 | 17 September 2008 | Enclosure - Request for Additional Information Regarding the Nuclear Energy Institute Quality Assurance Program Description Topical Report No. NEI-06-14A, Revision 5 | Commercial Grade Dedication |
ML081130133 | 3 June 2008 | Request for Additional Information Nuclear Energy Institute (NEI) Topical Report (TR) - 103237, EPRI (EPRI Power Research Institute) MOV (Motor-operated Valve) Performance Prediction Program - Topical Report | Stroke time |
ML081400205 | 19 May 2008 | Request for Additional Information Regarding Nuclear Energy Institute Topical Report 07-03, Generic Final Safety Analysis Report Template Guidance for Radiation Protection Program Description, Revision 5 (Project No. 689; TAC MD5248) | |
ML080940250 | 6 May 2008 | Request for Additional Information Regarding Nuclear Energy Institute Topical Report 07-10, Generic Final Safety Analysis Report Template Guidance for Process Control Program, Revision 2 (Project No. 689; TAC MD6860) | Incorporated by reference Process Control Program |
ML080870117 | 28 April 2008 | Request for Additional Information Regarding Nuclear Energy Institute Topical Report Number 07-09, Generic Final Safety Analysis Report Template Guidance for Offsite Dose Calculation Manual Program Description, Revision 1 (Project No. 689; | Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report |
ML080940280 | 7 April 2008 | Request for Additional Information, Topical Report Material Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169) | Weld Overlay Finite Element Analysis Dissimilar Metal Weld |
ML072550505 | 21 September 2007 | NEI, Second Request for Additional Information Regarding Topical Report NEI 07-02, Generic FSAR Template Guidance for Maintenance Rule Program Description Guidance for Plants Licensed Under 10 CFR Part 52, Revision 1 | Maintenance Rule Program |
ML072220129 | 27 August 2007 | Request for Additional Information (RAI) Regarding Nuclear Energy Institute Topical Report (TR) WCAP-16308-NP, Pressurized Water Reactor Owners Group 10 CFR 50.69 Pilot Program - Categorization Process - Wolf Creek Generating Station. | Safe Shutdown Probabilistic Risk Assessment Large early release frequency Severe Accident Management Guideline |
ML072150417 | 23 August 2007 | Request for Additional Information Regarding Transmittal of NEI 07-02, Generic FSAR Template Guidance for Maintenance Rule Program Description for Plants Licensed Under 10CFR Part 52, Revision 1 | Maintenance Rule Program |
ML071450414 | 9 July 2007 | Request for Additional Information (RAI) Regarding Topical Report No. NEI 07-03, Generic FSAR Template Guidance for Radiation Protection Program Description, Revision 0 (Project No. 689; TAC MD5248) | High Radiation Area |
ML071550116 | 13 June 2007 | Request for Additional Information (RAI) Regarding Nuclear Energy Institute Topical Report (TR) WCAP-16294-NP, Rev. 0, Risk-Informed Evaluation of Changes to Technical Specification Required Action Endstates for Westinghouse NSSS PWRs.(MD51 | Mission time |
ML071450480 | 25 May 2007 | Electronic Mail - Starefos, J L to Andersen R; 05/25/2007; RAI - NEI 07-03, Radiation Protection Program | High Radiation Area |
ML071070370 | 23 April 2007 | Request for Additional Information (RAI) Regarding Topical Report (TR) -103237, Electric Power Research Institute Motor-Operated Valve Performance Prediction Methodology Software | |
ML062910258 | 21 February 2007 | Request for Additional Information (RAI) Regarding Nuclear Energy Institute (NEI) 94-01, Revision 1J, Industry Guideline for Implementing Performance-Based Option of 10 Code of Federal Regulations (CFR) Part 50, Appendix J & Electric Power | Probabilistic Risk Assessment Large early release frequency |
ML062050337 | 3 August 2006 | Request for Additional Information Regarding Materials Reliability Program - 169 Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pwrs. | Non-Destructive Examination Weld Overlay DM weld |
ML020310056 | 31 January 2002 | Request for Additional Information on Sequal Topical Report Basis for Adoption of the Experience Based Seismic Equipment Qualification (Ebseq) Methodology by Non A-46 Nuclear Power Plants. | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |