July 22, 2014 Mr. Marcus R. Nichol, Senior Project Manager Quality Issues and Licensing Actions Nuclear Energy Institute 1201 F Street, NW, Suite 100 Washington, DC 20004

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE REVIEW OF NUCLEAR ENERGY INSTITUTE 14-05, GUIDELINES FOR THE USE OF ACCREDITATION IN LIEU OF COMMERCIAL GRADE SURVEYS FOR PROCUREMENT OF LABORATORY CALIBRATION AND TEST SERVICES, REVISION 0

Dear Mr. Nichol:

By letter dated April 29, 2014, the Nuclear Energy Institute (NEI) submitted Revision 0 to NEI 14-05 to the U.S. Nuclear Regulatory Commission (NRC) for NRC staff review and approval. NEI 14-05 provides an approach to utilize accreditation by signatories to the International Laboratory Accreditation Cooperation Mutual Recognition Arrangement as part of a purchasers commercial grade dedication of laboratory services.

The NRC staff has reviewed the NEI submittal and identified that additional information is needed to continue portions of the review. The staffs request for additional information is contained in the enclosure to this letter.

If you have any questions or comments regarding this matter, please contact Mr. Dennis Galvin by telephone at (301) 415-6256 or by e-mail at Dennis.Galvin@nrc.gov.

Sincerely,

/RA/

Joseph Colaccino, Chief New Reactor Rulemaking and Guidance Branch Division of Advanced Reactors and Rulemaking Office of New Reactors Project No. 0689

Enclosure:

Request for Additional Information 1-7564 cc: See next page

Mr. Marcus R. Nichol, Senior Project Manager Quality Issues and Licensing Actions Nuclear Energy Institute 1201 F Street, NW, Suite 100 Washington, DC 20004

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE REVIEW OF NUCLEAR ENERGY INSTITUTE 14-05, GUIDELINES FOR THE USE OF ACCREDITATION IN LIEU OF COMMERCIAL GRADE SURVEYS FOR PROCUREMENT OF LABORATORY CALIBRATION AND TEST SERVICES, REVISION 0

Dear Mr. Nichol:

By letter dated April 29, 2014, the Nuclear Energy Institute (NEI) submitted Revision 0 to NEI 14-05 to the U.S. Nuclear Regulatory Commission (NRC) for NRC staff review and approval. NEI 14-05 provides an approach to utilize accreditation by signatories to the International Laboratory Accreditation Cooperation Mutual Recognition Arrangement as part of a purchasers commercial grade dedication of laboratory services.

The NRC staff has reviewed the NEI submittal and identified that additional information is needed to continue portions of the review. The staffs request for additional information is contained in the enclosure to this letter.

If you have any questions or comments regarding this matter, please contact Mr. Dennis Galvin by telephone at (301) 415-6256 or by e-mail at Dennis.Galvin@nrc.gov.

Sincerely,

/RA/

Joseph Colaccino, Chief New Reactor Rulemaking and Guidance Branch Division of Advanced Reactors and Rulemaking Office of New Reactors Project No. 0689

Enclosure:

Request for Additional Information 1-7564 cc: See next page DISTRIBUTION: See next page ADAMS Accession Number: ML14197A171 via e-mail* NRO-002 OFFICE NRO/DCIP/MVIB PM:DARR/NRCB BC:DARR/NRCB NAME YDiaz-Castillo* DGalvin JColaccino DATE 7/16/2014 7/16/2014 7/22/2014 OFFICIAL RECORD COPY

Letter to Marcus R. Nichol from Joseph Colaccino dated July 22, 2014

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE REVIEW OF NUCLEAR ENERGY INSTITUTE 14-05, GUIDELINES FOR THE USE OF ACCREDITATION IN LIEU OF COMMERCIAL GRADE SURVEYS FOR PROCUREMENT OF LABORATORY CALIBRATION AND TEST SERVICES, REVISION 0 Distribution:

Public APOB R/F DGalvin, NRO JColaccino, NRO BAbeywickrama, NRO YDiaz-Castillo, NRO KKavanaugh, NRO ERoach, NRO RMcIntyre, NRO RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNroDarr RidsNroDarrApob RidsNroDcip RidsNroDcipCqab

NEI New Reactors Mailing List (Revised 07/25/2013) cc:

Mr. Gary Wright, Director Division of Nuclear Facility Safety Illinois Emergency Management Agency 1035 Outer Park Drive Springfield, IL 62704 Page 1 of 5

NEI New Reactors Mailing List Email 4pareez@gmail.com Alan.Levin@areva.com (Alan Levin) alsterdis@tva.gov (Andrea Sterdis)

APAGLIA@Scana.com (Al Paglia)

APH@NEI.org (Adrian Heymer) awc@nei.org (Anne W. Cottingham) awyche@bechtel.com (Altheia Wyche) bellesrj@ornl.gov (Randall Belles) bendoj@asme.org (John Bendo) bevans@enercon.com (Bob Evans) bevardbb@ornl.gov (Bruce Bevard)

Bojan.Petrovic@gatech.edu (Bojan Petrovic) brian.turner@oca.iowa.gov (Brian Turner)

BSims@Becht.com (Robert Sims) bwwaites@southernco.com (Brandon Waites) carey.fleming@cenglic.com (Carey Fleming) ccmsc@verizon.net (Mike Callahan) cee@nei.org charles.bagnal@ge.com (Charles Bagnal) collinlj@westinghouse.com (Leslie Collins) cposlusny@babcock.com (Chester Poslusny)

CumminWE@Westinghouse.com (Edward W. Cummins) curtisslaw@gmail.com (Jim Curtiss) cwaltman@roe.com (C. Waltman) david.distel@exeloncorpo.com (David J. Distel) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) david.newland@cnsc-ccsn.gc.ca (David Newland) dchapin@mpr.com (Douglas Chapin)

DeLaBarreR@state.gov (R. DeLaBarre) dianed@nirs.org (Dianed) dominiquef@nirs.org (Dominique French) don.tormey@iub.iowa.gov donald.woodlan@luminant.com (Donald Woodlan)

DPStout@tva.gov (Dan Stout) draleigh@curtisswright.com (Denna Raleigh) duane.fournier@iub.iowa.gov ecullington@earthlink.net (E. Cullington) ed.burns@earthlink.net (Ed Burns) eddie.grant@excelservices.com (Eddie Grant) elyman@ucsusa.org (Ed Lyman)

Page 2 of 5

NEI New Reactors Mailing List (contd) erg-xl@cox.net (Eddie R. Grant) esmith@moenviron.org (Edward Smith) ewallace@nuscalepower.com (Ed Wallace)

F.Shahrokhi@areva.com (Farshid Shahrokhi) fletcher@exchangemonitor.com garent@tva.gov (Gordon Arent) gcesare@enercon.com (Guy Cesare) ggeaney@mpr.com (George Geaney)

GovePA@BV.com (Patrick Gove) gyoung4@entergy.com (Garry Young) gzinke@entergy.com (George Alan Zinke) hankwon.choi@wgint.com (Hankwon Choi) hickste@earthlink.net (Thomas Hicks) hwilchins@epsilonsystems.com (Howard Wilchins) jack.kasper@parsons.com (Jack Kasper) jahalfinger@babcock.com (Jeff Halfinger) james1.beard@ge.com (James Beard) james2.ross@ge.com (James Ross) jason.parker@pillsburylaw.com (Jason Parker) jason.tokey@nuclear.energy.gov (Jason Tokey) jennifer.easler@oca.iowa.gov (Jennifer Easler) jerald.head@ge.com (Jerald Head) jgutierrez@morganlewis.com (Jay M. Gutierrez)

Jim.Kinsey@inl.gov (James Kinsey) jim.sundermeyer@iub.iowa.gov jmr@nei.org (Jeannie Rinckel)

JNR@NuScalePower.com (Jose N. Reyes) john.elnitsky@pgnmail.com (John Elnitsky) john.holt@nreca.coop (John Holt) john.oneill@pillsburylaw.com (John O'Neill)

Joseph_Hegner@dom.com (Joseph Hegner) jrappe@nuscalepower.com (Jodi Rappe) jwh1@nreca.coop (John Holt) kahtan1234@yahoo.com KAK@nei.org (Kimberly Keithline) kerri.johannsen@iub.iowa.gov klingcl@westinghouse.com (Charles Kling) kouhestani@msn.com (Amir Kouhestani) kra@nei.org (Katie Austgen)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh)

Kwelter@NuScalePower.com (Kent Welter) larry.stevens@iub.iowa.gov lauren.klee@hq.doe.gov (Lauren Klee)

Page 3 of 5

NEI New Reactors Mailing List (contd) lchandler@morganlewis.com (Lawrence J. Chandler) libby.jacobs@iub.iowa.gov mack.thompson@iub.iowa.gov marcel.deVos@cnsc-ccsn.gc.ca (Marcel DeVos) maria.webb@pillsburylaw.com (Maria Webb) marilyn.kray@exeloncorp.com mark.holbrook@inl.gov (Mark Holbrook) matias.travieso-diaz@pillsburylaw.com (Matias Travieso-Diaz) media@nei.org (Scott Peterson) mgiles@entergy.com (M. Giles) mirskys@saic.com (Steven Mirsky)

MSF@nei.org (Marvin Fertel) murawski@newsobserver.com (John Murawski) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple)

P.Stefanovic@Holtec.com (Peter Stefanovic) parveen.baig@iub.iowa.gov patriciaL.campbell@ge.com (Patricia L. Campbell) paul.gallagher@parsons.com (Paul Gallagher)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) pcarlone@mpr.com (Pete Carlone) peter.hastings@duke-energy.com (Peter Hastings) phg@nei.org (Paul Genoa)

PLorenzini@NuScalePower.com (Paul Lorenzini) poorewpiiI@ornl.gov (Willis P. Poore III) ramana@Princeton.EDU (M. V. Ramana) rbarrett@astminc.com (Richard Barrett) rclary@scana.com (Ronald Clary)

Richard.Black@eh.doe.gov (Richard Black) richard.sweigart@duke-eneergy.com (Richard Sweigart)

RJB@NEI.org (Russell Bell) robert.haemer@pillsburylaw.com (Robert Haemer) robert.kitchen@pgnmail.com (Robert H. Kitchen) ronald.polle@oca.iowa.gov rritzman@firstenergycorp.com (R. Ritzman)

RSnuggerud@NuScalePower.com (Ross Snuggerud) rxm@nei.org (Rod McCullum) sabinski@suddenlink.net (Steve A. Bennett) sfrantz@morganlewis.com (Stephen P. Frantz) shobbs@enercon.com (Sam Hobbs) siciliatom@hotmail.com (Mark Campagne) stan.wolf@iub.iowa.gov stephan.moen@ge.com (Stephan Moen)

Page 4 of 5

NEI New Reactors Mailing List (contd) stephen.markus@pillsburylaw.com (Stephen Markus) steven.hamrick@fpl.com (Steven Hamrick) strambgb@westinghouse.com (George Stramback) swkline@bechtel.com (Steve Kline) tammy.way@nuclear.energy.gov (Tammy Way)

Tansel.Selekler@nuclear.energy.gov (Tansel Selekler) tcerafic@bechtel.com (T. Cerafic) tedquinn@cox.net (Ted Quinn) tgado@roe.com (Burns & Roe) tjhester@midamerican.com (Tom J. Hester) tjk@nei.org (T.J. Kim) tom.miller@hq.doe.gov (Tom Miller) tom.miller@nuclear.energy.gov (Thomas P. Miller) troche@absconsulting.com (Thomas Roche) trsmith@winston.com (Tyson Smith)

Vanessa.quinn@dhs.gov (Vanessa Quinn) vince.gilbert@excelservices.com (Vince Gilbert) vka@nei.org (Victoria Anderson)

Wanda.K.Marshall@dom.com (Wanda K. Marshall) wayne.marquino@ge.com (Wayne Marquino) whorin@winston.com (W. Horin) william.mcint.com (William Mctigue) wwbx@hyperionpowergeneration.com (Willis Bixby) x2gabeck@southernco.com (Gary Becker) rrsgarro@pplweb.com (Rocco R Sgarro)

Page 5 of 5

Request for Additional Information 1-7564 Issue Date: 7/14/2014 Application

Title:

NEI Topical Reports Operating Company: NEI Docket No. PROJ 0689 Review Section: TR NEI 14.05 Guidelines QUESTIONS:

TR NEI 14.05 Guidelines-1 Section 1.1, Purpose, states, in part, that Purchasers that procure commercial grade calibration or testing laboratory services are able to rely on laboratory accreditation by Accreditation Bodies (ABs) that are signatories to the International Laboratory Accreditation Cooperation (ILAC) Mutual Recognition Arrangement (MRA) (referred to as the ILAC process) in lieu of commercial grade surveys or in-process surveillances to provide the necessary evidence of compliance to qualify calibration or test suppliers under a Commercial Grade Dedication process.

In addition, page A-1 of Appendix A, Quality Assurance Program Template, states, in part, that, When purchasing commercial grade calibration or testing services from a laboratory holding accreditation by an accrediting body recognized by the International Laboratory Accreditation Cooperation (ILAC) Mutual Recognition Arrangement (MRA), commercial grade surveys and source verifications need not be performed provided each of the following conditions are met The NRC staffs current recognition of the ILAC accreditation process allows for licensees and suppliers of basic components to use this alternative in lieu of performing a commercial-grade survey as part of the dedication process. Although similar in nature, a commercial-grade survey and source verification or in-process surveillance are different activities with different scopes. Commercial-grade surveys are conducted at a sufficient frequency to ensure that the process controls applicable to the critical characteristics of the procured item or service continue to be effectively implemented. In contrast, source verification involves witnessing quality-related activities to confirm by direct observation that the selected critical characteristics of the item or service being procured are satisfactorily controlled by the vendor. Clarify if it is the intent of NEI 14-05 for the NRC to recognize the ILAC accreditation process in lieu of performing a commercial-grade survey and source verification and the basis for it.

TR NEI 14.05 Guidelines-2 Section 4, Purchasers Quality Assurance Program, states, in part, that A generic Template describing the use of the ILAC process in lieu of a commercial grade survey that may be inserted into a Purchasers QA Program, is provided in Appendix A. Current NRC requirements for the use of the ILAC accreditation process require licensees and suppliers of basic components to document the alternative method in their QA Program description. Since Appendix A contains the conditions that must be met to use the alternative method, clarify if it is the intent of NEI 14-05 to require that Appendix A be included in the licensees and suppliers 1

Request for Additional Information 1-7564 QA Program description. If not, although NEI-14-05 contains the appropriate requirements that licensees and suppliers must follow when using the alternative, because there is no section within NEI 14-05 that clearly specifies the actions and steps that must be followed, it is possible for licensees and suppliers to not adequately dedicate the calibration or testing service. As such, include a section in NEI 14-05 that clearly defines what are the actions and steps that licensees and suppliers must follow when using the ILAC accreditation in lieu of performing a commercial-grade survey.

TR NEI 14.05 Guidelines-3 Section 4.3, Control of Purchased Material, Equipment, and Services, states, in part, that Purchasers using the accredited laboratories will be responsible for reviewing objective evidence for conformance to the procurement documents, such as review of documentation to validate the service providers accreditation and review of the actual certificates provided by the laboratory. As part of NRC staffs current recognition of the ILAC accreditation process, the NRC staff expects that licensees and suppliers will review the calibration records as part of receipt inspection to verify that all of the technical and quality requirements, which include the critical characteristics, imposed in the purchase order (PO) have been met. However, Appendix A does not include a condition that licensees and suppliers must review the calibration and testing records to verify conformance to the PO requirements. Provide a justification for the exclusion of this requirement from the list of conditions.

TR NEI 14.05 Guidelines-4 Section 5.3, Verification that Implementation of the ILAC Process Continues to be Consistent with NRC Accepted practices, states, in part, that the U.S. nuclear industry observations of peer evaluations will be performed on a frequency of once every three (3) years. This frequency is similar to the frequency for external (supplier) audits discussed in Regulatory Guide (RG) 1.28. As opposed to suppliers of basic components that hold a quality program that meets the requirements of Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, to 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities and a program that meets the requirements of 10 CFR Part 21, Reporting of Defects and Noncompliance, the required level of oversight for licensees and suppliers of basic components is different than from a commercial supplier. For example, per RG 1.28, these suppliers are evaluated at least once annually by their customers. Furthermore, ISO/IEC-17025:2005 is a standard thats used globally and could be subject to different levels of interpretation. One way of supplementing the peer evaluation observation every 3 years would be, at some point during the 3 year cycle, to observe the accreditation of a laboratory by an accrediting body.

a. Provide a justification for performing an observation of a peer evaluation every 3 years.
b. Clarify if the intent is to alternate the observations of the peer evaluation between domestic and international accrediting bodies.
c. If a report is generated after the observation of the peer evaluation, is it the intent to share that report with the NRC staff?
d. As part of our oversight activities, the NRC staff may be interested in participating in the observation of the peer evaluations. Add a statement to NEI 14-05 to reflect this request.

2

Request for Additional Information 1-7564 TR NEI 14.05 Guidelines-5 Section 5.4, Optional Activities, describes additional monitoring activities available to the nuclear industry as ILAC stakeholder members. Clarify under what circumstances you would use these optional activities and if the intent is to, if necessary at some point, substitute the peer evaluation observation with one of these optional activities.

TR NEI 14.05 Guidelines-6 One of the conditions, which verify the critical characteristics, currently identified by the NRC for dedication of commercial calibration services is that the PO shall require the use of the laboratorys ISO/IEC-17025:2005 for the calibration services. This requirement is also stated in Section 4.2 of NEI 14-05. However, although Appendix A requires that the purchaser must perform a review of the suppliers accreditation, it does not clearly require that the PO shall include the requirement that the laboratory must provide the service in accordance with their accredited ISO/IEC-17025:2005 program and scope of accreditation. Clarify if it is the intent of NEI 14-05 for licensees and suppliers of basic components to impose this requirement in the PO.

TR NEI 14.05 Guidelines-7 In the discussion of the two additional differences with NUPIC practices in Section 6, the second difference states, in part, that EPRI issued guidance on counterfeit and fraudulent items, Plant Support Engineering: Counterfeit, Fraudulent and Substandard Items, EPRI-1019163, and is in the process of updating this guidance. The guidance provides practical measures to further enhance protections against counterfeit and fraudulent items and includes a standard procurement clause that can be used in the procurement of calibration and testing services.

Clarify if it is the intent of NEI 14-05 for licensees and suppliers to include the procurement clause from EPRI 1019163 when procuring calibration and testing services. If the answer is no, provide a justification for not requiring licensees and vendors to include this clause in the procurement documents.

TR NEI 14.05 Guidelines-8 As part of the commercial-grade dedication process, a technical evaluation is required. Section 6.1, Technical Evaluation of ILAC Requirements and Procedures, describes a generic technical evaluation which identifies the critical characteristics for calibration and testing services. In addition, Section 3.2.1, Identification of Additional Requirements, states, in part, that Any additional technical or quality requirements for the supplier of commercial grade items or services need to be identified. Clarify if it is the intent of NEI 14-05 that licensees and suppliers shall perform an additional technical evaluation, in addition to the one described in NEI 14-05, to identify any additional technical and quality requirements such as tolerances, accuracies, ranges, industry standards, etc.

3

Request for Additional Information 1-7564 TR NEI 14.05 Guidelines-9 In order to avoid any confusion, rearrange the conditions listed in Appendix A.

For example, within Appendix A the condition (listed third) related to the documented review of the suppliers accreditation and scope should be a part of the technical evaluation and therefore, should be the first step in the process.

In addition, the requirement that the purchase documents require that the calibration or test certificate/report include identification of the laboratory equipment and standards used should be a stand-alone requirement listed as part of the second condition in Appendix A.

4