Issue date | Title | Topic | |
---|---|---|---|
ML17229A710 | 30 April 1998 | Analysis of Capsule 263 from FPL St Lucie Unit 2 Reactor Vessel Radiation Surveillance Program. | |
ML17229A571 | 31 October 1997 | Criticality Safety Analysis for Spent Fuel Storage Rack Using Soluble Boron Credit. | |
ML17229A042 | 30 September 1996 | Rev 1 to CEN-405-NP, Application of Reactor Vessel Surveillance Data for Embrittlement Mgt. | |
ML17228B226 | 30 June 1995 | Generic Upper Shelf Values for Linde 1092,124 & 0091 Reactor Vessel Welds, Final Rept | |
ML17228B190 | 31 May 1995 | Joint Applications Rept for Safety Injection Tank Aot/Sti Extension. | Boric Acid Maintenance Rule Program |
ML17228B183 | 31 May 1995 | Joint Applications Rept for LPSI Sys AOT Extension. | Safe Shutdown Mission time Probabilistic Risk Assessment Maintenance Rule Program |
ML17228B180 | 31 May 1995 | Joint Applications Rept for EDGs AOT Extension. | Safe Shutdown Mission time Enforcement Discretion Maintenance Rule Program |
ML17228B499 | 31 July 1993 | Nonproprietary Version of Application of Reactor Vessel Surveillance Data for Embrittlement Mgt. | |
ML17228A459 | 30 September 1991 | Suppl 1 to Boric Acid Concentration Reduction Effort Technical Bases & Operational Analysis St Lucie Nuclear Power Plant Unit 1. | Boric Acid Shutdown Margin |
ML17228A458 | 30 September 1991 | Boric Acid Concentration Reduction Effort Technical Bases & Operational Analysis St Lucie Power Plant Unit 1. | Safe Shutdown Boric Acid Shutdown Margin |
ML20011F498 | 30 November 1989 | Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2. | |
ML20153G092 | 1 September 1988 | Boric Acid Concentration Reduction | Safe Shutdown Boric Acid Shutdown Margin |
ML17221A597 | 22 January 1988 | Concentration Reduction Effort,Technical Bases & Operational Analysis. | Safe Shutdown Boric Acid Shutdown Margin Non-Destructive Examination Hydrostatic Nondestructive Examination Liquid penetrant |
ML17221A588 | 31 March 1987 | Rev 0 to Criticality Safety Analysis St Lucie New Fuel Storage Vault W/4.5% Enriched 14x14 Fuel Assemblies. | |
ML17219A262 | 31 October 1986 | I Steam Generator Allowable Tube Wall Degradation. | Safe Shutdown Safe Shutdown Earthquake |
ML20238F259 | 31 August 1986 | Tube Burst & Leakage Testing of Intergranular Attack & IGSCC Defects Representative of Those Found in St Lucie Unit One Steam Generators | |
ML20155B128 | 20 March 1986 | Loca/Eccs Analysis W/11% Steam Generator Tube Plugging | |
ML17216A616 | 28 February 1986 | Rev 1 to St Lucie Unit 1:New & Spent Fuel Storage Criticality Safety Evaluation for Natural U Axial Blanket Fuel. | |
ML20140E196 | 31 December 1985 | Suppl 1 to St Lucie Unit 1 Revised LOCA-ECCS Analysis W/15% Steam Generator Tube Plugging Break Spectrum & Exposure Results | |
ML17216A346 | 5 November 1985 | Revised LOCA-ECCS Analysis W/15% Steam Generator Tube Plugging. | |
ML17346B171 | 31 July 1985 | Retran Code Transient Analysis Model Qualification. | Anticipated operational occurrence Fuel cladding Coast down |
ML17215A369 | 30 April 1984 | Nonproprietary Conservatism of Axial Shape Index DNB Limiting Condition for Operation Below 30% Power. | |
ML20085H551 | 16 August 1983 | Core Support Barrel Insp,Repair & Analysis & Thermal Shield Removal | |
ML20083N266 | 7 January 1983 | Plant Transient Analysis for St Lucie Unit 1 | Shutdown Margin Anticipated operational occurrence |
ML20083N248 | 7 January 1983 | Rev 1 to St Lucie Unit 1 Cycle 6 Sar | |
ML20083N209 | 20 December 1982 | LOCA Analysis Using Exem/Pwr ECCS Model | |
ML20039F867 | 31 December 1981 | Evaluation of Pressurized Thermal Shock Effects Due to Small Break LOCAs W/Loss of Feedwater for St Lucie 1 & 2 Reactor Vessels. | |
ML17208A892 | 31 July 1980 | RCS Asymmetric Loads Evaluation,Numerical Results - Evaluation of C-E Fuel, App A,Nonproprietary Version | |
ML17208A893 | 31 July 1980 | RCS Asymmetric Loads Evaluation,Eccs Analysis Approach W/Reduced Area Coolant Channels in Peripheral Assemblies, App B | |
ML19310A233 | 29 February 1980 | Statistical Combination of Uncertainties Methodology,Part 3:C-E Calculated Departure from Nucleate Boiling & Linear Heat Rate Limiting Conditions for Operation for St Lucie Unit 1, Nonproprietary Version | Shutdown Margin Anticipated operational occurrence |
ML19310A224 | 31 January 1980 | Ceaw:Method of Analyzing Sequential Control Element Assembly Group Withdrawal Event for Analog Protected Sys, Nonproprietary Version | |
ML19310A231 | 31 January 1980 | Statistical Combination of Uncertainties Methodology,Part 2:Combination of Sys Parameter Uncertainties in Thermal Margin Analyses for St Lucie Unit 1, Nonproprietary Version | |
ML19310A227 | 31 December 1979 | Statistical Combination of Uncertainties Methodology,Part 1:C-E Calculated Local Power Density & Thermal Margin/Low Pressure LSSS for St Lucie Unit 1, Nonproprietary Version | Anticipated operational occurrence |
ML19310A226 | 30 November 1979 | Fiesta:One Dimensional,Two Group Space-Time Kinetics Code for Calculating PWR Scram Activities. |