Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20209G183 | 31 December 1986 | Rev 1 to Availability Evaluation for SPDS at Rancho Seco Plant | Probabilistic Risk Assessment |
ML20215H880 | 30 September 1986 | Small Break LOCA Analysis for B&W 177FA Lowered Loop Plants in Response to NUREG-0737,Item II.K.3.31 | Fuel cladding |
ML20214W655 | 30 November 1985 | Rev 1 to BAW-1823, Once-Through Steam Generator Mechanical Sleeve Qualification | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake |
ML20135A557 | 31 August 1985 | B&W Owners Group Cavity Dosimetry Program | |
ML20062D617 | 1 July 1982 | Evaluation,Repair & Replacement of Damaged Internal Auxiliary Feedwater Header at Davis Besse 1,Oconee 3 & Rancho Seco |