ML20195F59111 September 1998Special Rept:On 980812,addl Unseated Wires Were Discovered. Cause Is Unknown at Present Time.Util Evaluated Number of Unseated/Ineffective Wires & Determined Effect on Containment Structural Integrity.Commitments,Encl
ML20247F7718 May 1998Special Rept:On 980403 & 980503 Seismic Monitoring Sys Was Declared Inoperable.Caused by 5-volt Power Supply & Regulator Card Failure.Imd & Sys Engineering Are Continuing to Identify & Resolve Problems So Sys Can Be Operable
ML20217D51326 September 1997Special Rept:On 970918,moisture Content in Grease Samples Exceeded Maximum 10% by Weight.Caused by Ground Water Intrusion.Engineering Evaluation Performed & Insp of Tendons for Water Will Be Done on Annual Basis
ML20149H72718 July 1997Special Rept:On 970711,abnormal Containment of Tendon Degradation Was Noted.Cause Indeterminate.Will Perform Addl Inspections of Tendon H4ED to Monitor Apparent Addl Degradation.Calculation Re Subj Tendon Encl
ML20135F3324 March 1997Special Rept:On 970303,Braidwood Auxiliary Bldg Vent Stack Wide Range Gas Monitor Was Inoperable for Greater than Seven Days.Caused by Removing Monitoring from Operation to Perform 18-month Channel Calibr.Calibr Was Completed
ML20129C8198 October 1996Special Rept:On 960826,Unit 1 Began Receiving Loose Parts Alarm in Mcr.Caused by C Loop Cold Leg Loop Stop Isolation Valve.Se Performed by Westinghouse
ML20057F3968 October 1993Ro:On 930928,Train B DG Valid Failure Occurred,Causing Annunciators 2-22-C8 & 2-22-D6 to Alarm Simultaneously Due to Blown Fuses 27 & 29.Caused by Relay W/Shorted Circuit. Relay W/Shorted Circuit Replaced W/Bench Tested Relay
ML20118B53625 September 1992Special Rept:On 920913,auxiliary Bldg Vent Stack wide-range Gas Monitor Declared Inoperable.Caused by Need to Perform Instrument Maint Surveillance Procedure.Nuclear Work Request Generated to Replace Failed Printed Circuit BoardGrab sample
ML20099K29418 August 1992Ro:On 920807,auxiliary Bldg Vent Stack wide-range Noble Gas Monitor Declared Inoperable Due to Inability to Pass Source Check.Caused by Failure of High Voltage Power Supply. Original Detector Reinstalled After Addl Failure
ML20102B14314 July 1992Special Rept:On 920610,DG 2A Output Breaker Closed, Resulting in Parallel Operation of DG 2A to Sys Grid & Causing DG Trip.Caused by Reverse Power Condition Due to Operator Error.Surveillance Successfully Completed
ML20094K12511 March 1992Ro:On 920212,diesel Generator 1A Failed to Attain Rated Speed & Voltage within 10 & Declared Inoperable.Caused by Air Leak in Air Control Sys Which Positions Fuel Racks in Full Fuel Position.Test Frequency Increased
ML20086A23712 November 1991Special Rept:On 911026,auxiliary Bldg Vent Stack wide-range Noble Gas Monitor Declared Inoperable & Removed from Svc for More than 7 Days.Caused by Need to Perform 18-month Channel Calibr.Channel Returned to Operable Status on 911107
ML20077B57530 April 1991Special Rept:On 890724,seismic Monitoring Sys Declared Inoperable to Facilitate Relocation of Free Field Monitor. Efforts to Troubleshoot & Repair Sys Unsuccessful.Schedule for Restoration of Sys Listed
ML20066F71924 December 1990Special Rept:On 901102,sensor Channel Malfunctioned.Cause Unknown.Sensor Channel Will Be Repaired by Next Refueling Outage (Mar 1991)
ML20065R82113 December 1990RO:901114,during Performance of Monthly Operability Surveillance of Diesel Generator 2A,noted That Voltage Indication on Panel Appeared to Be Erroneous.Caused by Failure of Fuse.Fuse Replaced
ML20245A86114 April 1989Ro:On 890215,diesel Generator 1DG01KB Started in Performance of Monthly Operability Surveillance.Generator Came Up to Speed But Immediately Voltage & Frequency Indications Malfunctioned.Caused by Short in Strip Chart Recorder
ML20245D87214 April 1989Ro:On 890215,diesel Generator Voltage & Frequency Indications Malfunctioned.Caused by Blown Fuse in Strip Chart Recorder.Generator Run Manually Terminated & Fuse Replaced
ML20196E23429 November 1988Special Rept:On 881020,discovered That Sensor Channels LM001 & LM009 Were in Low Alarm.Caused by Fraying of Insulated Fibre Jacket of Microdot Connector Cable.Sensor Channels Replaced
ML20154E8939 September 1988Ro:On 880803,diesel Generator 2A Began Losing Speed Upon Entering Test Mode During Monthly Operability Surveillance. Caused by Abnormally High Resistance in Normally Closed Test Mode Contacts of 4EX3 Relay
ML20235G8841 July 1987Special Rept:On 870614,wide Range Gas Monitor (WRGM) Failed Automatic Check Source Test on High Range detector,1PC330. Check Source Damaged During Repairs.Parts & Installation of New Check Sorce Expected to Be Completed by 870715
ML20212K4603 February 1987Special Rept:On 870106,PORV 1RY455A Lifted for 2 S.Caused by Rapid Increase of RCS Temp When Reactor Cooling Pump 1C Started.Opening PORV Terminated Pressure Transient.On 870112,bubble Formed in Pressurizer to Prevent Recurrence
ML20212H3513 February 1987Ro:On 861209,diesel Generator 1DG01KB Output Breaker Did Not Close on Signal from Control Room.Breaker Circuitry & Linkages Inspected.Following Successful Surveillance Run, Diesel Generator Declared Operable on 861210