ML24039A1918 February 2024Kairos Power LLC, Changes to Hermes 2 PSAR Chapter 2
ML24031A13930 January 2024Kairos Power LLC, Changes to Hermes 2 Preliminary Safety Analysis Report (PSAR) Chapter 3
ML24026A30126 January 2024Kairos Power, LLC, Changes to Hermes 2 Preliminary Safety Analysis Report (PSAR) Chapter 7Anticipated operational occurrence
Cyber Security
ML24025C68724 January 2024Kairos Power LLC, Changes to PSAR Chapter 3 and 9Safe Shutdown
High winds
Internal Flooding
Design basis earthquake
Earthquake
ML24011A29211 January 2024Kairos Power LLC, Preliminary Safety Analysis Report, Chapter 9
ML24009A2499 January 2024Kairos Power LLC, Changes to Hermes 2 Preliminary Safety Analysis Report (PSAR) Chapter 9Safe Shutdown
Emergency Lighting
Design basis earthquake
ML24003A7673 January 2024Kairos Power LLC, Changes to Hermes 2 Construction Permit Application (PSAR) Chapters 4, 5, 7, and 13Safe Shutdown
Shutdown Margin
Anticipated operational occurrence
Cyber Security
Design basis earthquake
Turbine Missile
ML23356A08022 December 2023Enclosure 1: Kairos Power, LLC, Changes to Preliminary Safety Analysis Report (PSAR) Chapter 13
ML23355A19421 December 2023Kairos Power LLC, Changes to Preliminary Safety Analysis Report (PSAR) Chapter 3 and Chapter 5Design basis earthquake
ML23355A16321 December 2023Enclosure 1: Changes to Hermes 2 PSAR Chapter 4Design basis earthquake
ML23349A14915 December 2023Kairos Power LLC, Changes to Preliminary Safety Analysis Report (PSAR) Chapter 2