PNO-III-99-045, on 991001,brush Fire Was Reported on Licensee Site in Unused Area one-fourth to one-half Mile from Plant Itself.Massac County Fire Dept Responded with Two Trucks & Tanker & Extinguished Fire in About 1 H1 October 1999PNO-III-99-045:on 991001,brush Fire Was Reported on Licensee Site in Unused Area one-fourth to one-half Mile from Plant Itself.Massac County Fire Dept Responded with Two Trucks & Tanker & Extinguished Fire in About 1 H
PNO-III-96-073, on 961216,alert Declared by Licensee When Matl Release Sighted Coming from Feed Matls Bldg.Bad Pump Motor Connection on Scrubber Sys Caused Electrical Short, Tripped Breaker.Licensee Notified NRC Operations Ctr17 December 1996PNO-III-96-073:on 961216,alert Declared by Licensee When Matl Release Sighted Coming from Feed Matls Bldg.Bad Pump Motor Connection on Scrubber Sys Caused Electrical Short, Tripped Breaker.Licensee Notified NRC Operations Ctr
PNO-III-88-007, on 880206,300 Lbs of Calciner U3O8 Spilled Onto Concrete Pad as Result of Seal Leak from Calciner.Spill Occurred While Plant in Shutdown Mode for Weekend.Matl Cleaned Up within 45 Minutes of Discovery8 February 1988PNO-III-88-007:on 880206,300 Lbs of Calciner U3O8 Spilled Onto Concrete Pad as Result of Seal Leak from Calciner.Spill Occurred While Plant in Shutdown Mode for Weekend.Matl Cleaned Up within 45 Minutes of Discovery
PNO-II-87-051, on 870724,DOE,Oak Ridge Operations Ofc Notified NRC of Potential for Cracks in 1-inch Valves Used on UF6 Cylinders.Seven Valves Cracked Upon Installation Onto Cylinder.Doe Recommends That Valves Be Replaced27 July 1987PNO-II-87-051:on 870724,DOE,Oak Ridge Operations Ofc Notified NRC of Potential for Cracks in 1-inch Valves Used on UF6 Cylinders.Seven Valves Cracked Upon Installation Onto Cylinder.Doe Recommends That Valves Be Replaced
PNO-III-86-113, on 861009,three Licensee Employees Received Minor Facial Burns from Small Release of UF6 from Process Equipment Inside Plant.Workers Treated Onsite & Returned to Work.No Offsite Release of UF6 Occurred10 October 1986PNO-III-86-113:on 861009,three Licensee Employees Received Minor Facial Burns from Small Release of UF6 from Process Equipment Inside Plant.Workers Treated Onsite & Returned to Work.No Offsite Release of UF6 Occurred
PNO-III-86-029, on 860322,UF6 Cylinder Overfilled Due to Operator Error During Loading Operation.Excess UF6 Removed W/O Reheating Cylinder.No Cylinder Damage Occurred. Procedures Revised24 March 1986PNO-III-86-029:on 860322,UF6 Cylinder Overfilled Due to Operator Error During Loading Operation.Excess UF6 Removed W/O Reheating Cylinder.No Cylinder Damage Occurred. Procedures Revised
PNO-III-86-006A, on 860126-30,inspectors Onsite to Continue Special Insp of Dec 1984 U Hexafluoride Cylinder Overfill Incident.Inspectors Plan to Return on 860210 for Further Review.Plant Manager Relieved of Duties Pending Insp3 February 1986PNO-III-86-006A:on 860126-30,inspectors Onsite to Continue Special Insp of Dec 1984 U Hexafluoride Cylinder Overfill Incident.Inspectors Plan to Return on 860210 for Further Review.Plant Manager Relieved of Duties Pending Insp
PNO-III-86-006, on 860123,licensee Informed NRC of Overfilled U Hexafluoride Cylinder Damaged During Removal of Excess Matl on 841207.No Release Occurred.Load Cells Replaced W/Different Alarm Point23 January 1986PNO-III-86-006:on 860123,licensee Informed NRC of Overfilled U Hexafluoride Cylinder Damaged During Removal of Excess Matl on 841207.No Release Occurred.Load Cells Replaced W/Different Alarm Point
PNO-III-80-022, on 800131,oxide Calciner Failed.Caused by Explosion of Natural Gas.No Injuries,Personnel Exposure or Release to Environ1 February 1980PNO-III-80-022:on 800131,oxide Calciner Failed.Caused by Explosion of Natural Gas.No Injuries,Personnel Exposure or Release to Environ