BVY 13-017, Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)High winds
Ultimate heat sink
Time to boil
Emergency Lighting
FLEX
Tornado Generated Missile
Containment Hardened Vent
Earthquake
ML13064A30223 January 2013Overall Integrated Plan for Reliable SFP InstrumentationHigh Radiation Area
Locked High Radiation Area
FLEX
Spent Fuel Pool Instrumentation
BVY 09-022, Update to Spent Fuel Management Plan1 April 2009Update to Spent Fuel Management PlanDecommissioning Funding Plan
ML0612905664 May 20062006/05/04-Vermont Yankee Revision 3 to Steam Dryer Monitoring PlanPower Uprate
ML07068034825 January 20064.19: Reactor Vessel Surveillance Program, Evaluation of Aging Management Programs, 01/25/2006Safe Shutdown
Shutdown Margin
Safety Limit Minimum Critical Power Ratio
High Radiation Area
Offsite Dose Calculation Manual
Anticipated operational occurrence
Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Aging Management
Foreign Material Exclusion
Process Control Program
Spiral reload
Fuel cladding
EVT-1
Pressure boundary leak
Fire Watch
Dissimilar Metal Weld
Flow Induced Vibration
ML06173028511 May 2005VYNPS Source Water Protection Plans May 11, 2005