Issue date | Title | Topic | |
---|---|---|---|
ML21105A859 | 1 May 2020 | Integrated Resource Plan | Cyber Security Coronavirus COVID-19 Environmental Justice |
ML21105A858 | 1 May 2018 | Integrated Resource Plan | Cyber Security Aging Management |
ML13063A181 | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Boric Acid High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Safe Shutdown Earthquake Operating Basis Earthquake Emergency Lighting FLEX Tornado Generated Missile Earthquake |
ML13063A013 | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | High Radiation Area Locked High Radiation Area FLEX Spent Fuel Pool Instrumentation |
ML13063A182 | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Post Accident Monitoring Operating Basis Earthquake Emergency Lighting FLEX Design basis earthquake Earthquake |
ML13063A017 | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | High Radiation Area Locked High Radiation Area FLEX Spent Fuel Pool Instrumentation |
ML11305A042 | 3 November 2011 | Action Plan to Address North Anna Power Station Restart as a Result of the August 23, 2011 Earthquake | Operating Basis Earthquake Functionality Assessment Design basis earthquake Earthquake |
ML12054A145 | 19 September 2011 | Email from G. Thomas, NRR to D. Hoang, NRR Et Al. FW: North Anna Seismic Report - Summary Report of August 23/2011 Earthquake Response and Restart Readiness Determination Plan North Anna Power Station Units 1 and 2 and ISFSI | Unanalyzed Condition Safe Shutdown Earthquake Operating Basis Earthquake Design basis earthquake Earthquake |
ML11262A151 | 17 September 2011 | Independent Spent Fuel Storage Installation - Summary Report of August 23, 2011 Earthquake Response and Restart Readiness Determination Plan | Safe Shutdown Boric Acid Safe Shutdown Earthquake Reserve Station Service Transformer Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Aging Management Design basis earthquake Operability Determination Earthquake Maintenance Rule Program |
ML093350600 | 24 November 2009 | Fourth Interval Inservice Testing Program Plan and Proposed Alternatives and Relief Requests | Safe Shutdown Boric Acid Stroke time Temporary Modification Incorporated by reference Cold shutdown justification Power-Operated Valves Scaffolding |