Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21105A8591 May 2020Integrated Resource PlanCyber Security
Coronavirus
COVID-19
Environmental Justice
ML21105A8581 May 2018Integrated Resource PlanCyber Security
Aging Management
ML13063A18128 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Boric Acid
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Safe Shutdown Earthquake
Operating Basis Earthquake
Emergency Lighting
FLEX
Tornado Generated Missile
Earthquake
ML13063A01328 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)High Radiation Area
Locked High Radiation Area
FLEX
Spent Fuel Pool Instrumentation
ML13063A18228 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Post Accident Monitoring
Operating Basis Earthquake
Emergency Lighting
FLEX
Design basis earthquake
Earthquake
ML13063A01728 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)High Radiation Area
Locked High Radiation Area
FLEX
Spent Fuel Pool Instrumentation
ML11305A0423 November 2011Action Plan to Address North Anna Power Station Restart as a Result of the August 23, 2011 EarthquakeOperating Basis Earthquake
Functionality Assessment
Design basis earthquake
Earthquake
ML12054A14519 September 2011Email from G. Thomas, NRR to D. Hoang, NRR Et Al. FW: North Anna Seismic Report - Summary Report of August 23/2011 Earthquake Response and Restart Readiness Determination Plan North Anna Power Station Units 1 and 2 and ISFSIUnanalyzed Condition
Safe Shutdown Earthquake
Operating Basis Earthquake
Design basis earthquake
Earthquake
ML11262A15117 September 2011Independent Spent Fuel Storage Installation - Summary Report of August 23, 2011 Earthquake Response and Restart Readiness Determination PlanSafe Shutdown
Boric Acid
Safe Shutdown Earthquake
Reserve Station Service Transformer
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
Aging Management
Design basis earthquake
Operability Determination
Earthquake
Maintenance Rule Program
ML09335060024 November 2009Fourth Interval Inservice Testing Program Plan and Proposed Alternatives and Relief RequestsSafe Shutdown
Boric Acid
Stroke time
Temporary Modification
Incorporated by reference
Cold shutdown justification
Power-Operated Valves
Scaffolding