Issue date | Title | Topic | |
---|---|---|---|
ML20151W745 | 12 August 1998 | Rev 0 to N-PENG-CALC-014, Picep Code Leakage Flow Rates at Critical Locations of Cold Leg Piping for Millstone Unit 2 Rcs | |
ML20199A017 | 16 December 1997 | Rev 1 to Calculation NUC-176, DG Tornado Missile Evaluation. W/Three Oversize Drawings | Probabilistic Risk Assessment Tornado Generated Missile Tornado Missile Protection TORMIS |
ML20198B449 | 17 October 1997 | Rev 1 to Calculation 97-SDS-1760-M2, Millstone 2:Pressure/ Temperature Limit Curves for 20 Efpy | Hydrostatic |
B16763, Rev 2 to Calculation M3-LOE-284-EM, Millstone 3:Pressure/ Temp Limits for 10 Efpy | 30 September 1997 | Rev 2 to Calculation M3-LOE-284-EM, Millstone 3:Pressure/ Temp Limits for 10 Efpy | Hydrostatic Finite Element Analysis |
ML20132D727 | 13 December 1996 | Rev 0 to Ampacity Derating of Cables Due to Thermo-Lag | Boric Acid Fire Barrier |
ML20138H294 | 11 December 1996 | Ampacity Derating of Cables Due to Thermo-Lag - MP-1 | |
ML20141D282 | 30 October 1996 | Rev 2 to PRA96NQA-01093-S3, MP3 Maint Performance Criteria | |
ML20115A873 | 28 June 1996 | Rev 2 to Shutdown Cooling Sys Vol & Refueling B Concentration Calculation | Boric Acid Hydrostatic |
ML20107F508 | 28 March 1996 | Eab & LPZ Doses from Millstone Unit 3 Loca | |
ML20116H457 | 27 July 1995 | Rev 0 to Millstone Unit 2 Bonnet Pressure of Containment Sump Recirculation Valves (2-CS-16.1A/B) | Stroke time |
ML20116H450 | 27 July 1995 | Rev 1 to Containment Recirculation Sump Evaporation | |
ML20116H454 | 27 July 1995 | Rev 0 to MP2 Target Thrust Calculation for 2-CS-16.1A & B | Stroke time Anchor Darling |
ML20134A453 | 17 July 1995 | Rev 0 to Raceway Evaluation | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Design basis earthquake Earthquake |
ML20086G153 | 27 February 1995 | MP-2 CR Operator Doses from MP-1 MSLB Accident | |
ML20086G170 | 3 February 1995 | MP-2 CR Operator Doses from MP-2 LOCA (Hws) | |
ML20116H486 | 1 February 1995 | Rev 1 to Valve 2CS-13.1 a & B Bonnet Fluid Temp Following Loca | |
ML20086G163 | 1 February 1995 | II CR Operator Doses from Millstone II LOCA (Low Wind Speed) | |
ML20086G144 | 11 December 1994 | II CR Operator Doses from Millstone III Loca | |
ML20083L017 | 19 August 1994 | Rev 1 to MP2 EDG Operating Time W/24,000 Gallons Diesel Fuel Oil Available at Continuous Rated Load of 2,750 Kw Fuel Consumption. W/Excerpts from MP2 EDG Fuel Oil Supply Procedures,Epip 4400,Rev 2 & Rev 7 to EOP 2540B & EOP 2528 | |
ML20087B272 | 28 June 1994 | EDG Run Time | |
ML20070J716 | 21 December 1993 | Rev 1 to Calculation P(T)-1195, Length of Operation of EDGs During Accident Conditions (Alternate Loading Schemes) | Safe Shutdown |
ML20070J750 | 28 August 1992 | Rev 0 to Calculation 91-019-152-M3, Identification of EDG Run Times Under Varying Fuel Oil Storage Levels | |
ML20104B601 | 18 November 1988 | Evaluation of Eroded Service Water Joints on 1 1/2 Cu-Ni Piping for Structural Integrity |